On 2/20/2019 at 7:20 PM, mtbediz said:

Hello Caroline, you did a great job with San Francisco, congratulations. Have you completed this model? If so, can you put a picture of her?

Hello mtbediz, I hadn't actually realised I hadn't completed the restoration on my San Fran build log. I will try and complete it so all the information I had is replaced.

 

I left it previously with how I attached the bridles and bowlines to the sails, I don't think these were in the kit plans. It has been a while since I completed the ship, so I will do my best to remember what I did.

 

The bridles and bow lines were attached to the main sail and top sail on both the main and fore mast.

 

This is the bridle on the main mast topsail

 

sanfran425a.jpg.955a56ead1c1e71fc243f153274607af.jpg

This sail has the most parts to make the bridle. 1. First make four small loops at the edge of the sail, the upper most one about a third of the way up the sail. 2. Next attach some line to the top loop, take it through the middle of a small bead and attach the other end to the second loop, do the same with the bottom two loops. 3. Then take another length of line and attach one end to the top bead (I tied it through the hole), then take the other end, thread it through another bead and then attach to the bottom bead. Attach the bowline to the last bead (shown in red)

1.bridle.thumb.jpg.17e7697b2e58ac65e1db5733cb51819e.jpg    2.bridle-1.thumb.jpg.06173b20b370d9721774639bc754eed7.jpg3.bridle-2.thumb.jpg.b46a4eb4dcb522c03e80220b497b61a8.jpg

 

Repeat on the other side of the sail.

 

The other three sails are done in a similar way, the only difference is the number of loops and beads used for each bridle.

 

4.The main sail on the main mast and the top sail on the fore mast has 3 loops on the sail edge and 2 beads.

5.But the bottom sail on the fore mast only has two loops on the sail edge and one bead:

4.bridle-3.thumb.jpg.5b5413e5c4ce946ba1f30f85f774d44a.jpg5. bridle-4.thumb.jpg.13907fba57871997afb143b5faa789b4.jpg

 

 

Now the bridles are attached to the sails, we can deal with the bowlines (shown in red in the diagrams above).

 

The bowline from the topsail on the main mast went to a double block attached to the stay, then down to a belaying pin on the fore deck, as can be seen below.sanfran425b.jpg.88eb1c77c4e0491e4a20e10f3a066a15.jpg

 

 

The bowline from the main sail went to a single block attached to the edge of the shrouds on the fore mast, then down to a belaying pin:

 

sanfran424b.jpg.a8a470385a2f3685602bff4d8af40984.jpg

 

The bowline from the fore top sail went to a double block attached to the stay then down to a belaying point in the beak:

sanfran426a.jpg.016bddfcdeadf75ef17faa81c7d409a6.jpg

The bowline from the lower sail on the fore mast went to another double block attached to the stay (a bit below the one for the top sail) taken under it's sail and belayed at a point by the fore mast rack (I didn't have room to belay it in the beak).

sanfran426b.jpg.cd50bd3c8196903ed94f77a9d2601da2.jpg

 

That is how I did the bridles and bow lines. 

Edited by vulcanbomber

First Completed Build: San Francisco (Original Version)

Current build: Victory Models HMS Pegasus

Cross Stitch Project (Finished): Battle Of Agamemnon and Ca Ira

Cross Stitch Project : Victory & Temeraire

Posted

Next was the tack and sheet lines from the lower sail on the fore mast and the main sail on the main mast.

 

The tacks from the sail on the fore mast went under the beak and through the small piece I had attached there earlier before going to a belaying point on the rack in the bow. 

sanfran426c.jpg.c1a5538ecb4d28e72d1e482f41a1d3e1.jpg

 

 

The sheet line was attached to an eyebolt on the side of the hull, passed through a block attached to the sail and belayed in the waist (highlighted in blue).

fore-sail-sheet.jpg.db7eefde58ccdc9c1ffc2361d549a02e.jpg

The tack line from the main sail went through the fairlead I made in the hull and to the belaying point next to it.

main-sail-tack.thumb.jpg.00885cca2e73cf3ca56766a4c8758f6a.jpg

 

 

The sheet line was attached to an eyebolt on the side of the hull at the stern, passed through a block attached to the sail and belayed on the quarter deck. (highlighted in blue)

main-sail-sheet.jpg.f48a8e21491110d1e033ed67cdbc7b95.jpg

I think that is all the extra's I put on the ship, the rest of the rigging was on the plans. (as far as I can remember, it was about 8 years ago!!)

 

The finished ship

sanfran448.jpg.0fcd1b8b9521baf1a8388a0b0a003134.jpg

sanfran428.jpg.dc332b8b136792bb047d0d319a02afea.jpgsanfran429.jpg.65dd4add693619d0b363caf51401b91a.jpgsanfran430.jpg.45095a8413bd5c6e3efd22a7d08670eb.jpgsanfran431.jpg.cb27a56fcabc220a25d25f1b6b1f2555.jpgsanfran432.jpg.2b0f4ef9bd48a5d6a247429591901e38.jpgsanfran433.jpg.8e0bf3e99026e2d4148d2ca93a37627e.jpgsanfran434.jpg.e88c37014e4f4b02e279009792e1a86d.jpgsanfran435.jpg.894afc165e41362b006a140e2d81ffad.jpgsanfran436.jpg.091af958897f07c47fbfc11d5a478e19.jpgsanfran437.jpg.9ad0376a1643162c2415c43eb0d85936.jpgsanfran438.jpg.9cf89d428677cc034aaf58883c92deda.jpgsanfran439.jpg.16186f1bbaadb4c1097ae3956131bd6f.jpgsanfran440.jpg.2a46d2cff0f33f9c581c71cd5e9a4bb6.jpgsanfran441.jpg.f544799e7cd05e43e0673f5ce97b8bb2.jpg

First Completed Build: San Francisco (Original Version)

Current build: Victory Models HMS Pegasus

Cross Stitch Project (Finished): Battle Of Agamemnon and Ca Ira

Cross Stitch Project : Victory & Temeraire

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...