Jump to content

Pride of Baltimore II by halituzun - FINISHED - Model Shipways - 1:64


Recommended Posts

Fore Sail is furled to fore gaff and fore mast. The position of Fore Gaff changes. Some photos from real ship with fore sail furled.

image.thumb.jpeg.68fdffb6f59a942d31c5d7004f0c1927.jpeg

image.thumb.jpeg.9aacfe398a1b4291d65601dd36209ca1.jpeg

Fore sail is furled by the help of 5 brail lines p/s. They are head brail, throat brail, upper leech brail, lower leech brail and crew brail. There is also a sixth brail, foot brail, but it does not have primary effect on fore sail furling. In the photo of the real ship's fore sail the brail lines are indicated by red arrows. 

image.thumb.jpeg.9df9f0696512c79afff90f34724c17be.jpeg

The sail was  rigged like the main sail though there were some differences. Three of the mast hoops have brail blocks (p/s) for upper leech brail lines   at top, lower leech brail lines at middle and clew brail  lines at bottom. Fore gaff has two 1/8 peak halliard blocks like the main gaff. However it has two single blocks (p/s) at middle location for Head brail line and two single blocks under the jaws for throat brail line. The latter also have metal thimbles attached  (p/s) as fairlead for head brail line. Mast hoops up to the upper reef band level are not seized to the sail just like the main sail hoops and a line passed through connects them to the sail. At aft clew there are two 1/8 double blocks for fore sheet and at fore clew there is one double pennant block for fore tack tackle. Here are some photos

image.thumb.jpeg.72834d323fc807fa9f2840f7f5e3a356.jpegimage.thumb.jpeg.9b37852cac72894290500a6798de91d0.jpegimage.thumb.jpeg.f13a313925c4b86cd53d4414f2f049c4.jpegimage.thumb.jpeg.5bee43818039832ec9c055ba4f846cd7.jpeg

image.thumb.jpeg.13feaf3f3798b77021e734fc7c59acbc.jpegimage.thumb.jpeg.721e7b23e72731f9b926505e16e7c578.jpegimage.thumb.jpeg.98ad2d8774536893dc475a0e214266e0.jpeg

Fore sail  was seized to fore gaff with continuous line like the Fore Topsail and Main sail. Mast hoops were also seized.

image.thumb.jpeg.88351b0fe6ee3f7be172937fd142d71c.jpeg

image.thumb.jpeg.46dd35b15568151abf1bfab5c1064b9c.jpegimage.thumb.jpeg.167b29e579a02bb061fb0e81ae28199e.jpeg

image.thumb.jpeg.357332f62c1f54f1db8dbd4e67c5a8d8.jpeg

image.thumb.jpeg.f45db0c582a28bf2803aa16a1f191c2d.jpeg

The sail was then installed to fore mast and laid on glass surface. At this step 2x5 brail lines  (p/s) were seized to leech. Port side lines lay under the sail. Also at this step the position of the fore gaff was set.

image.thumb.jpeg.70785f2df195e835baff5fbbb481df57.jpeg

Starboard side brail lines

image.thumb.jpeg.1fb2c996908dd3d23668be409ea9161b.jpeg

Port side brail lines. These are were reeved through their related port side blocks which can not be seen in the photo.

image.thumb.jpeg.013d8f7a1643a0eb7aec29a125adfd25.jpeg

The position of the blocks must be controlled at this stage with reference to port and starboard ones exposed on the correct side. Blue arrows are blocks and red arrow is metal thimble on starboard side.

image.thumb.jpeg.c54603c7590d4f819e5a55a35bfa634b.jpeg

Sail and mast relation at the lower parts of the mast

image.thumb.jpeg.5d59de5c837e642da9ba0b02641b0992.jpeg

Before starting to furl the sail, all the starboard side brail lines were also reeved through their related starboard side blocks. Head brail line was also reeved through the metal thimble seized to throat block after reeved through the block at the gaff.

I started wetting the sail from the  gaff and mast border areas and slowly and carefully created folds.  Both starboard and port brail lines were retracted simultaneously until the desired furling was achieved. Here many reshaping was  done. When the desired furling shape was achieved furled sail was fixed by 6 overhead knots and  water diluted white glue was applied by a dry cut brush.  In the real ship brail lines were used for this purpose. 

Here are some photos of the furled fore sail.

image.thumb.jpeg.90c5ddf313de389c77c21681661ee34c.jpeg

image.thumb.jpeg.d79197ab55921152d616132d67e19a45.jpeg

image.thumb.jpeg.34e882c8bbde4d2a6ad26744bdad7fd4.jpeg

image.thumb.jpeg.9d332694db9f004a0382eee2f02080a0.jpeg

The fore mast with furled fore sail is fixed in erect position in a vise.

image.thumb.jpeg.4764949fc7c07ec16bd41e433fc9d316.jpeg

image.thumb.jpeg.c8c5e17544265fabacdeaee00e46484a.jpeg

image.thumb.jpeg.414991a2e1b8abbfd9fb5edafe4b5dba.jpeg

image.thumb.jpeg.452d5e6b53d430870734aca5acd561a7.jpeg

image.thumb.jpeg.e153004626d67a26fa13b73ff3c55303.jpeg

image.thumb.jpeg.13d68fd50dff6d5b78f5577215d6a981.jpeg

image.thumb.jpeg.11381c8d2a1b1f6e07f004e45d6b3c30.jpeg
Here you can see the starboard head brail line passing through the metal thimble.

image.thumb.jpeg.bdb6138ed730d8385600182e25ebf6b8.jpeg

image.thumb.jpeg.67d652e9a565b2a5fff833a0b36c899a.jpeg

Now the Main and Fore Masts , with sails attached and furled, were finished. The next step will be installing the yards of the Fore mast followed by the installation of the masts to the deck. Fore sails will then be installed. 

image.thumb.jpeg.3ecee600a9794f258a940491fef20d28.jpeg

At this stage and until the end , the model is secured in the cleaned paint booth with an old cloth used as a curtain to keep the dust out...

image.thumb.jpeg.b421364c87744b967335ce4da3706832.jpeg

image.thumb.jpeg.c7477367504b6aed0d39f095eed66915.jpeg

 

 

 

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

I agree with you Chris.

Almost all the boats wıth sails docked at the marinas in my hometown town , Bodrum , do have engines as well. A few are real ‘ sail boats’. To watch those few cruising with full sails is really a joy…

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

It was time to install the yards to fore mast.

In order to support the connection of the yards to mast, a pin was inserted to the center point of yoke and a hole was drilled on the mast where the yard will be glued to (Both red arrows).

Fore lower yard

image.thumb.jpeg.56bc58c836f500f76dd6bc9f5f2e9239.jpeg

Fore Topsail  Yard

image.thumb.jpeg.58e57b7073de7811e6c5b3f4fc35cf5c.jpeg

The yards were dry fitted. Metal bands  (Red arrow) at the top sides of the yard at middle must be paralel to the mast.

Fore Topsail Yard dry fitting. The position of the Topsail Yard must be at a lower level as the sail was furled.

image.thumb.jpeg.6bd8db046bce02d53ab2044a67a22616.jpeg

image.thumb.jpeg.197098cbd2297acc05e2705eea3e925f.jpeg

Fore Lower Yard

image.thumb.jpeg.d8a68c1432e2bea46bd827ccbc04da78.jpeg

image.thumb.jpeg.2e5ce09694560000e93f8395eae7520e.jpeg

Before the installation the rigging of the yards were checked and all the possible rigging was completed before the yards were installed.

image.thumb.jpeg.8491d3fcf883f9f9f186b77173393150.jpeg

image.thumb.jpeg.2305ed179490649290736eaa26082407.jpeg

I started with the Fore Lower Yard. The mast and yard were laid on a cutting mat and a square connection was achieved.

image.thumb.jpeg.493a1b3f620859025e72254058fb271d.jpeg

Then the Topsail Yard was installed in the same setup.

image.thumb.jpeg.3626c7c50937d5a089c248388b6fade9.jpeg

After the yards were installed all the possible rigging job was completed, this time before the installation of the masts to deck.

image.thumb.jpeg.f3273c56fc847e0d7706efffdab413bf.jpeg

Here you see an example. There is a small wood piece with four holes attached to the fore side of the fore aft crosstree as you see in the photo from the plan. This piece acts as a fairlead to buntlines, leech line and reef tackle both p/s.

image.jpeg.a064a531d2dbf6fc55230d17bfccc9f3.jpeg

In the photo below you see that area in the red rectangle .

 

image.thumb.jpeg.063cd65348ac74c6241e5b1eed363d47.jpeg

Close up photo shows the four lines (Red arrows)  at each side. To reeve these lines after the mast/yard was installed to deck would be very difficult.

image.jpeg.a8316a32921e5fd8f64e0815ca9e819d.jpeg

The masts were ready to be installed to the deck.

image.thumb.jpeg.d38791c2fa62621be1010d883816d5d6.jpeg

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

It was October 30th, 2022 and 26th month of the build.

It was now time to install the masts to deck.

Both masts have a rake angle with the deck. For the main mast the angle was 74.5 and for the fore mast 76.5 degrees. Two jigs were made from scrap wood to be used when installing the masts.

The slots for the insertion of the masts were a bit large for the mast tenons. Also the tenon of the fore mast was modified to maintain the fore-aft aligning of the mast.

 

I started the installation with the main mast. The plan was to add very thin wood pieces to the sides of the slot, insert the mast, align the rake angle using the jig and apply liquid gap filling CA glue with applicator to the sides of the slot.

 

Here is a photo of the main mast insertion slot area. Holes for fife rail installation are red arrows, bilge pumps blue arrows and fire hydrant yellow arrow. Red stars are mahogany 0.4 mm veneer strips.

image.thumb.jpeg.bffd3bc0d2392da484e384a02578826d.jpeg

The mahogany strips (Red arrow) in position.

image.thumb.jpeg.86a36edd0fa009df46fa542bcc235cff.jpeg

Plan proved to be true and after the insertion of the mast the rake angle was set by using the jig. Please note that the furled main sail was in a high temporary position and the mast wedge and the boom rest were already installed to the mast. Inserted  mast was fitted to the slot tightly and applying CA glue was almost unnecessary.

image.thumb.jpeg.127638e25f0f54c127265acc0798e454.jpeg

image.thumb.jpeg.3fe9b95b4ae64023c3b657425a13d815.jpeg

Square position of the mast was checked  fore-aft and aft-fore angles.

image.thumb.jpeg.564ad3a5b46b09ff8f4eb3c4ee6baa93.jpegimage.thumb.jpeg.681eba988804c2adb5498de633cff4cb.jpeg

Mast wedge was placed and glued.

image.thumb.jpeg.cb00bad4a9b7a97bd4be6e6155a5aacb.jpeg

Boom rest with chocks were placed and glued.

image.thumb.jpeg.17148ef023ac343426543fc566f0ae7d.jpeg

Bilge pumps and fire hydrant were also fitted to the their holes tightly and no CA glue was used.

image.thumb.jpeg.1b1b95deeef4e2099eef5ae3b48fb741.jpeg

Different views of the base of the main mast at this step.

image.thumb.jpeg.94154c52b162278c3443878de0ed06a8.jpeg

image.thumb.jpeg.c0ba2b73a6ab36b2e8df4cce5996db0d.jpeg

image.thumb.jpeg.470213fe0b5805cecbdcc1b5ab01fb2f.jpeg

The next step was the installation of the fife rails. And it came with a million dollar question. How ?

Answer was simple. I disengaged the front part of the fife rails ( the part with the winch system), installed the aft part followed by the front part. The front and aft part connection points were later fixed  with touches of CA glue. Here are some photos at this step.

image.thumb.jpeg.372fb143868b88efc36aeb35aef1bf11.jpegimage.thumb.jpeg.a6111adbcfb28f3d8cc48444419cd1f9.jpeg

image.thumb.jpeg.f123b563268df45779f2f9a13486a0bd.jpeg

image.thumb.jpeg.b7af340b6563cf9d63ab26781972afc4.jpegimage.thumb.jpeg.e5665691057087ef92048bc604a66928.jpeg

As I mentioned before the tenon of the fore mast was problematic and reshaped.The photo below shows the position of the mast had it not been modified and reshaped. There is a small tilt to starboard side.

image.thumb.jpeg.6dcf40f89bbbd410a6bb06f85debea56.jpeg

The position of the mast after modification of the tenon. You can also see the 76.5 degree jig.

image.thumb.jpeg.7d2071b45238cc81ff613e564bebdb2e.jpeg

In order to fix the mast in the desired position , mahogany veneer pieces were added to aft-port (red arrow) and fore-starboard (blue arrow) areas of the slot. 

image.thumb.jpeg.29dc873bc9e6858e62a0ddeb3c772be5.jpeg

After the  mast wedge was installed  , the fore mast was inserted to the slot. Surprisingly CA glue was also almost  not needed and things went smoothly. After the rake angle was set Fore tack tackle was reeved to its block , just at the aft-port position of the fore mast base. Then the fife rail with the winch was installed.

image.thumb.jpeg.e43b53cab35705bacfdfdfd3f73a45fa.jpeg

image.thumb.jpeg.725535dcec50b4baf7fbcbbf0b674768.jpeg

image.thumb.jpeg.73cbdb10bd3f95e597752a6d4abd3ee9.jpeg

Wood cleats  and  eyebolt were glued to the holes.

image.thumb.jpeg.9d86737df12a961bcd040ced79cfcfb4.jpeg

image.thumb.jpeg.0537cd647003ce96c85490652b43322f.jpeg

image.thumb.jpeg.d45d2d7606a14f1899cc3f92761a23dc.jpeg

Finally the small fife rail in front of the fore mast was installed.

image.thumb.jpeg.ca5f7ebe51a3ee7393143d587b573908.jpeg

image.thumb.jpeg.74e7a9e90d69850d321e469ee4197723.jpegimage.thumb.jpeg.ae88a6561e130306c0054cf3891185b1.jpeg

Main boom was lowered to its normal position.

image.thumb.jpeg.3a8a67e7582218c63ab59bcd432236ed.jpegimage.thumb.jpeg.ed5bfb8a79ccc9533b251b9107d1a60e.jpeg

image.thumb.jpeg.9f76fdc2f471ee0e69905bde712e0ca9.jpeg

When the position of the masts were checked in the fore-aft axis there was a slight misalignment (Red rectangle)  which was later corrected when rigging the running backstays.

image.thumb.jpeg.8e00107eaf9c0ae750c8fc2213dd77ce.jpeg

As the mast installation step was done, the model now awaits the installation of fore sails. However I decided first to finish the rigging of cluster of lines , especially at fore mast, waiting  to be belayed at the pin rails at the bases of the masts.

image.thumb.jpeg.e30fa23b56418dd9f2218fc90e442629.jpeg

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

I continued with the running rigging lines belaying at  the fife rail pins at the bases of the masts and the running rigging of the main boom and main sail at aft deck.

Here are some photos of the running rigging lines of the fore mast.

In the first photo you see the mast head area and the two yards. Lines indicated with arrows are all starboard side.

Red arrow         Lower yard lift line

Blue arrow        Topsail clew line

Yellow arrow    Topsail inner buntline

Green arrow     Topsail leech line

Orange arrow   Lower yard truss

Violet arrow     Topsail sheet line

image.thumb.jpeg.ce11d3de3213d9590402a7cf02ee8645.jpeg

Fore Mast head section from starboard oblique view. Here you see the four lines passing  through the holes of the fairlead block at the aft crosstrees and later pass through two metal thimbles in pairs. These lines were belayed at the pin rails in front of the foremast.

image.thumb.jpeg.b57645b67333860492ec2f8af123196a.jpeg

Same area fore to aft view

Yellow arrows         Forestay sail halliard blocks

Blue Arrow             Anchor Burton line

Red arrows             Topsail sheet line.

image.thumb.jpeg.e8a7b1b479380482f24497aa8e7e5ed7.jpeg

Base of the foremast. Wide angle view of the fife rails.

image.thumb.jpeg.5186b8e571b9d337d5e49965420a04f9.jpeg

Closeup view of the foremast base. All the brail lines of the foresail were belayed at the pins of the fife rails located at the aft of foremast base.

 

image.thumb.jpeg.86ca722b503af6023196b6a989377be5.jpeg

Base of the main mast port side view

 

image.thumb.jpeg.c4f9d0258016965e2d50286c8b145acf.jpeg

Starboard side view

 

image.thumb.jpeg.5a7b08c747caaf4320c4ef8a026b749e.jpeg

Main Gaff Topsail running rigging

Port side view

image.thumb.jpeg.7ccc56a1e80ceda406c4b161a14cb675.jpeg

Starboard side view

 

image.thumb.jpeg.8f105603267d20a62e75b5422c6ae9b5.jpeg

Running rigging of the main boom and main sail.

View from aft to fore

image.thumb.jpeg.e1dde3b4b3b0303ccf45ffe398c6a1b4.jpeg

Port side view

 

image.thumb.jpeg.4a4dc0922744fd70563ffaf7d06af232.jpeg

Starboard side view

image.thumb.jpeg.396539765fb6980eb8a294ffa985a0a5.jpeg

And finally the photo of the stowed line of Fore sail sheet line at port side

image.thumb.jpeg.96ebdaad766101f3f7a9b86bc02fa0f7.jpeg

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

The next step was the installation and furling of the fore sails. There are three fore sails : Forestay sail, Jib and Jib Topsail. They are seized to port Fore Stay, Jib Stay and Fore Topmast Stay respectively . Forestay Sail and Jib halliards have special tackles called jigs. Jib Topstay halliard is just like Main Gaff Topsail halliard and its halliard line is seized to fore topmast just under the sheave, reeved through the block at the head and later through the topmast sheave. Here is the photo of the Forestay Sail and Jib halliards from the plan.

image.thumb.jpeg.e4b5b6aa6b6c25c076623d85f643b201.jpeg

The sheets of the fore sails have different formations as seen in the photo below.

image.thumb.jpeg.a721e9a338fe5fa5b25da9b56793530c.jpeg

The lines for Jib and Jib Topsail sheet are two independent ones. The lines with blocks or thimbles were seized to sail and stowed. Their counterpart lines seized to the eyebolts at the fore and aft of the chain plate platforms were coiled and stowed in place.

Port side

image.thumb.jpeg.756867ea7595fba0dfb5557ac6e65f3c.jpeg

Starboard side

image.thumb.jpeg.9855e06c515f1c8bca42146c8f2ed802.jpeg

Blocks for Forestay Sail sheet lines were seized to their eyebolts. The blocks with pendant lines were coiled and stowed at the sail.

In all three sails metal rings were placed through which stay lines will pass. Halliard blocks, downhaul lines, tack lines were seized as well as the coiled sheet lines with blocks or thimbles.

Here is a photo of Forestay Sail with legends.

image.thumb.jpeg.03032aa49e3402765305b01b00ef198d.jpeg

Here is Jib  and Jib Topsail photos.

image.thumb.jpeg.7335733b379fec0da8b0db170687fce9.jpeg

image.thumb.jpeg.33893e8eae20fd858aee712ed3e1f9b5.jpeg

Here are the closeup photos of the sheet lines and blocks in the order of Forestay Sail, Jib and Jib Topsail.

image.thumb.jpeg.5bc311ab1026767af02117f0f0338beb.jpeg

image.thumb.jpeg.56f9a87d5fa0d044eafd329bc0f963af.jpeg

image.thumb.jpeg.56abfe3b71c4b2f20df810e792e50a9e.jpeg

I started with the Forestay Sail. The sail was seized to PORT fore stay. Then both fore stays were seized to fore mast head. The halliard line was reeved through the related blocks and sail was fixed temporarily. Here are some photos of this step, some of which are closeup ones with legends.

image.thumb.jpeg.f22bf340af2b5e10df47ae2436a87e84.jpegimage.thumb.jpeg.e70821bcc6017a240433dcde8daa7bf6.jpeg

image.thumb.jpeg.8b212e6ea89cf1e6bc758baed735b1d6.jpeg

image.thumb.jpeg.28d9b93d4013e1a29a3b0a6bbf29f04c.jpegimage.thumb.jpeg.5626998b9dd97c722ae8ef616c7fde4b.jpeg

image.thumb.jpeg.8deb3bae2a47848d1f8a51cfb97217c4.jpeg

Starboard view

image.thumb.jpeg.df742e8379272d2b4421f7b210834d96.jpeg

Port view

image.thumb.jpeg.925e5af43f82761a05cd6851d359bdb5.jpeg

As the length of the base area is smaller than the sail's foot length I decided to fold the sail towards the fore stay first then started wetting and folding downwards. I hope the photos below explain the idea!

image.thumb.jpeg.65c5ee242fd9e8dde01e50b9ccd1ef74.jpeg

image.thumb.jpeg.f4329a4f1a4f83ca1f8e1381c2fbdfe7.jpegimage.thumb.jpeg.ceb7469a2a99c1058a664cf186a28068.jpeg

image.thumb.jpeg.8341c30277d5289dc4e29e9677db794b.jpeg

image.thumb.jpeg.6f3b57404a5220f8234f0d15f61f0f20.jpeg

image.thumb.jpeg.5fe239ec464da4eb3f079816372c43ba.jpeg

image.thumb.jpeg.b8893752fed3568cfbed421c52117f42.jpeg

The furled sail was tied in two places. Diluted white glue was applied with a brush.

image.thumb.jpeg.6e03324ac3a91122ad308a5dbfcd43b8.jpegimage.thumb.jpeg.6379a3b2ad095fe2a55a0e32b1925b80.jpegimage.thumb.jpeg.73c6b0a11de499e678ecfec7560a7c30.jpeg

image.thumb.jpeg.7da4df2e072fc35364f57d9099eb75ca.jpeg

image.thumb.jpeg.e566eb34bd318caddfac326594db19d9.jpeg

image.thumb.jpeg.0d6a3ac0f40919611af25d806285bbd0.jpeg

image.thumb.jpeg.35d048a3f0e1ab06ed6403a0b6075814.jpeg

image.thumb.jpeg.c564f139330b411599bc655350f2d1f8.jpeg

image.thumb.jpeg.818228302abbf064621347cc675e999b.jpeg

Jib was the next sail installed and furled following the steps like Forestay sail.

 

image.thumb.jpeg.d75fbd868258aa9a7087bd5961581407.jpeg

image.thumb.jpeg.ce07f668b73ae6109102b01f56f9bed2.jpeg

image.thumb.jpeg.b9100e8bc5ab2d05e99213598a3906c8.jpeg

image.thumb.jpeg.7ed6d2c5d302f4a8e8e60e5db07b699f.jpegimage.thumb.jpeg.72e5660b1fddb3a64040f285f03a9cb2.jpeg

image.thumb.jpeg.195ef6027ec6c4a9113913055036a0a5.jpeg

image.thumb.jpeg.6ecdd570b70139946152a6ef37df0241.jpeg

image.thumb.jpeg.b8cf9752330f5cd574e9ccd6a458518d.jpeg

image.thumb.jpeg.974b4db21bdd1ec61a8da6ca9c79a8d9.jpegimage.thumb.jpeg.1ea321f515b07848fd088270fa48839e.jpeg

image.thumb.jpeg.52482e9c185d28a92a95e42e10f1fc96.jpeg

image.thumb.jpeg.983fbaaf0529fc80cbb672b123fda481.jpeg

image.thumb.jpeg.be5b36f9718c63a3754fc1576df3bcd1.jpeg

image.thumb.jpeg.dcd2dde6f88a3fe7468c41449d15c37d.jpeg

image.thumb.jpeg.699ca62e89f6656cb74ab661e650098b.jpegimage.thumb.jpeg.8702829f298edd80790d99d518d42a07.jpeg

image.thumb.jpeg.672ba63b1588f897432f8523b06e9ff4.jpeg

image.thumb.jpeg.c785992c9c4353f2c4b4b0aae3d54bf7.jpegimage.thumb.jpeg.015b221b4f743fd844e5354da7547fad.jpeg

Finally Jib Topsail was installed and furled.

 

image.thumb.jpeg.e1d39bc684450c39f32c2b85573dc146.jpeg

image.thumb.jpeg.83933e4cfc4a05169b42ea7ff0162ac8.jpeg

image.thumb.jpeg.5a47d0499de5b74d9b5cd1e3f015e277.jpeg

image.thumb.jpeg.7e9309888c12b5bd672fda0829e6fefd.jpeg

image.thumb.jpeg.64d688cf8a2ede1cbd2c5597f322c7b2.jpegimage.thumb.jpeg.c520519a9110851cd43fad5d7a22459d.jpeg

image.thumb.jpeg.13c5694c5324c206dcf222ab3501ec74.jpeg

Here you see the Fore Topgallant Stay was also seized to Fore Topmast.

image.thumb.jpeg.ea83744a9e8db2d4e3de6ffd9792a341.jpegimage.thumb.jpeg.f89e8a47faaaa03952187d0c24ce437a.jpegimage.thumb.jpeg.614396e3b87fba63bfbd2099a6b6cc4e.jpeg

image.thumb.jpeg.47dc654f3c29b7fe832dd8a75741582f.jpeg

image.thumb.jpeg.d25710f8e41a118a648403b119792806.jpeg

image.thumb.jpeg.59dd6fced1b60b72597a313ed8b7bf85.jpegimage.thumb.jpeg.9100f221751c35d02b400474463856d3.jpeg

image.thumb.jpeg.842fcc5026f4144b4457bbfce447954b.jpeg

 

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

After I finished the installation and furling of the fore sails, I continued with the rest of the rigging. 

Fore mast rigging was done first. Here you see the photo after the rigging of the fore mast was done. Certain parts of the photo were zoomed in and dissected and some parts of the rigging was named.

image.thumb.jpeg.40dc3a5b547d1a789f427aecc978e243.jpegimage.thumb.jpeg.8b81791a6481e3d2a6b2587a0dcb65ad.jpeg

Fore Topsail rigging details

image.thumb.jpeg.e31399a4a3b6b6b224e24f2008bb94f4.jpeg

Fore lower yard rigging details

image.thumb.jpeg.b6bed6d5da06964df9294ca4aae3589b.jpeg

Forestay sail and Jib halliard jigs

image.thumb.jpeg.09ec9f862c4cd476977e3cab5787ac20.jpeg

Then the rigging of the main mast was done.

image.thumb.jpeg.1bac48b51e57e0312699f380c166dd72.jpeg

image.thumb.jpeg.a8744bf8970589bf4e32b9b22b27d90f.jpeg

image.thumb.jpeg.5ff11ad9363802130bea7e3d7d475e5e.jpegimage.thumb.jpeg.d8e91f22997aef878f919750c4f9f1ea.jpegPhotos were taken starting from bow to stern both at ground level and later from above with a slight angle.

Starboard side

 

image.thumb.jpeg.160e40231c656c5fcdec34aa02873cbc.jpeg

image.thumb.jpeg.fd0be7c686dcc8e40362be72f914a112.jpegimage.thumb.jpeg.cdf247d5a59c620b4880bcdbd3660e29.jpegimage.thumb.jpeg.7b8d33449420d5081d68e0f4169ac8d2.jpegimage.thumb.jpeg.5c121e54b1ff0bd78eb6095cf01eb6ae.jpeg

image.thumb.jpeg.efb678ab3b01f708acd22c7e2ffca407.jpeg

image.thumb.jpeg.ff7d47d025ac2f8fdbf029f433bd2277.jpeg

image.thumb.jpeg.5e5a1de4aef1282b029f2cea6617d816.jpeg

image.thumb.jpeg.e89ce987372b0b05c9cc5066e00cc685.jpeg

Port side

image.thumb.jpeg.f12f31d2aa764139211b66bc160d7d6b.jpegimage.thumb.jpeg.f14ada4ab663ec25e0caf2e94b63aae1.jpegimage.thumb.jpeg.07bcfeb3276b5c7240343be580d72363.jpegimage.thumb.jpeg.2d339b9ae8b08ad61a025cf9e0a9f6db.jpegimage.thumb.jpeg.8b6a05f4281495435aba64ea233d974c.jpeg

image.thumb.jpeg.23b5e61f549ad5fc06f75a19cd75d371.jpeg

image.thumb.jpeg.889eff62ea61833221601c5d4eee173b.jpegimage.thumb.jpeg.476ac7e9637b3e1ac9143aefd1f2ec50.jpegimage.thumb.jpeg.993187d0fd12b05a4457cebdab848664.jpeg

Closeup photos of bowsprit, fore mast and main mast

 

image.thumb.jpeg.e21b540ee3b20b1d821b1e96d63a61c7.jpeg

image.thumb.jpeg.f82f851679093ec91ad8e042dfd656b9.jpeg

image.thumb.jpeg.98e22a96a09b4d2b1a45a7b575bffd16.jpeg

image.thumb.jpeg.d5cad528cc0de8f534ea0599da23d216.jpegimage.thumb.jpeg.c8be0b3b02c122714858cc4651350987.jpeg

image.thumb.jpeg.3fb44c96bd3289cc4b47a7ccd9eaf865.jpeg

Fore mast base area. Main stay tackles

image.thumb.jpeg.dad1fe3ccc15e0f7039f40155fc633d7.jpeg

image.thumb.jpeg.9f943c65061db8b897e47b37fc07c3e8.jpegPort and starboard blocks of Forestay Sail sheet

 

image.thumb.jpeg.1cfb8b2b1c7554b30e989c9e765949f8.jpeg

image.thumb.jpeg.a52a43004fe790a64c8c0503abaea138.jpeg

Cannon rigging

 

image.thumb.jpeg.97165b7cebafbd29cd6e75f7bddcfab0.jpeg

Fore sails and some rigging details of bowsprit and bow cleat and pin  platform.

 

image.thumb.jpeg.ef6dbc7ff7dd46b4fd0210378d75c26f.jpeg

image.thumb.jpeg.20635fc9704ec8811aa135b52f61bd9e.jpegimage.thumb.jpeg.3679e0ec76194f2caddf0f6365079a51.jpegimage.thumb.jpeg.91f9fe48e81db3446137e24c7600de00.jpeg

image.thumb.jpeg.73f8305f2be23e2be40a4ce72b7de79d.jpeg

 

image.thumb.jpeg.467a9ed7b3c9b81cd998c071f09f38d7.jpeg

More closeup photos

Fore mast fore to aft view

image.thumb.jpeg.01c8af1dfe1cd0cb9331fbf89e103483.jpeg

Fore mast fore to aft view

image.thumb.jpeg.f5dafb4b1fc52c34ff81d0e09a043687.jpeg

Fore mast aft to fore view

image.thumb.jpeg.5af1d3a849efa18437eb87cc09efcbd2.jpeg

Main mast aft to fore view

image.thumb.jpeg.3fc25f1bcdc44bc6f482ba4242593516.jpeg

The photo of the port fore pin rail platform. This platform has a sad story. When I was rigging the standing lines of the fore mast and applying a little bit more force in order to correct the misalignment of the fore and main masts, this platform snapped off. As a lot of lines were belayed to its pins  at that time, I had to reglue and replace the platform with them attached. As expected the result was not like the other three and inboard free side of the platform was a little bit elevated and pointing upwards. They say lightening does not strike twice at the same point ! Ha ha ha....

When I was busy with the main mast rigging on port my left hand hit the belayed and taut lines at the poor  platform and it snapped off AGAIN..  

image.thumb.jpeg.2fd28f1615aa327f658af2164cceb8f3.jpeg

And the final photo of the post. A chaotic but organized rigging lines almost like puzzle...

image.thumb.jpeg.70f339e0b42c69efe0310f74e97ec3fd.jpeg

 

 

 

 

 

 

 

 

 

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

I continued the build by creating coiled ropes and installing them to belaying points without forgetting using the same color and size thread for each individual rigging line.

Actually I had prepared some coiled and stowed ropes of some lines of fore sail sheets. But these were done without any particular method and by simply looping threads around an 6 mm diameter dowel several times and tying them overhead knots. They were belayed to eyebolts on the fore chain plate platforms and wetted by diluted white glue. A weight (plastic clamp) was hanged and the shape of the coiled rope was then

achieved.

image.thumb.jpeg.9d66611ce30534a6d2e9e4fcd6e27d3c.jpegimage.thumb.jpeg.ead35f225740fd3ec023bc59f301d197.jpeg

image.thumb.jpeg.62a833944721d56bf33573de84245bab.jpeg

image.thumb.jpeg.6cb8e205728b68f3ab0b9b2e6e659aaa.jpeg

Starboard side coiled ropes of Jib sheet (fore) and Jib Topsail sheet (aft).

image.thumb.jpeg.0efe1e65585dd06bedc8d68bd7651e39.jpeg

Port side coiled ropes of rigging lines of Jib (fore) and Jib Topsail (aft) sheets.

image.thumb.jpeg.701d8d44b833b5ac11be75a9113be596.jpeg

Remember  Tom Lauria  ? His videos on 'Making silkspan sails' ? I came across his name again when I searched internet for 'coiled ropes' and he was describing his method of making scale rope hanks this time. Here is his method.

 

 

 I tried  his method exactly with the same steps but I did not like my result, probably due to limitations of 1:64 scale. In scales 1:48 or bigger  I am sure good results with his method can be achieved.

So I decided to find a way of my own. As the coiled ropes I described at the beginning of this post were  seized directly to eyebolts just like the way they were seized in the real ship, the final shape of the coiled ropes was OK. However the coiled ropes which were to be hanged to belaying pins must also have some kind of  small loop at their top besides the coiled part. These  small extra loops then can be inserted to the belaying pins. Here is how I did it .

 

Depending on the size of the coiled rope 5 or 6 mm dowel pieces were used. The dowel piece was fixed in a vise (Amati Model). A groove was created at the top of the dowel. A short piece of thread with the same color but with a smaller size diameter than the 'to be coiled rope' is fixed with two clamps and placed in the dowel top groove. Lets call this 'tying thread'

image.thumb.jpeg.ac256cea8c2ea3d9ceb9dee5b7f243c2.jpeg

image.thumb.jpeg.64d552e78609d6846d442f64d55b0a9d.jpeg

Then the to be coiled rope thread was clamped at one end and the free thread was loped around the dowel as many as needed  as you see in the following photos.

image.thumb.jpeg.ac1bd9b3058cd5b72c2d5461d6a180e8.jpegimage.thumb.jpeg.d9dc8c54f680379170482a179e614ec2.jpeg

You can see that the tying thread is under the coiled thread now.

image.thumb.jpeg.3c64ae6828bdc1a492030cbcc0197e76.jpeg

After the necessary number of loops were made by the coiled rope, the free end of the it was also clamped and fixed.

image.thumb.jpeg.6d9f6f799efdd26ebdc1429085162ea9.jpeg

An overhead knot by the 'tying thread' was tied once. An a touch of liquid CA glue was applied to the knot.

image.thumb.jpeg.a8c496f4d44409723d60aa79e1f7b3ee.jpegimage.thumb.jpeg.58615a915358787e37107392fa5f0d46.jpeg

This step is critical. As you see in the photo below  the coiled thread is passed UNDER the tying thread , then the dowel groove.

image.thumb.jpeg.0b9948fa5b50eec8e49e52faf44d762b.jpeg

A second overhead knot was tied and a second loop was created. 

image.thumb.jpeg.93e65ac25d29c3137ac39e02ae28c9e0.jpeg

image.thumb.jpeg.b976e8128b8417456496b4e5f099f93b.jpeg

Coiled thread is pulled until the desired sized loop is created.

image.thumb.jpeg.78ddc79b1b659f79cba5f27fa1574b58.jpeg

Then tying threads and coiled threads were cut with leaving excess threads on both of them. These excess thread were to be used in the next step.

image.thumb.jpeg.3a407315e8e9ba7b2f736f4a5b49a7d0.jpeg

image.thumb.jpeg.7ce5be9da181dc3eec2c95c5fdb7bcbb.jpeg

Then the coiled ropes were wetted by water diluted white glue,  hanged with some weights and left to dry to shape.

image.thumb.jpeg.ec327432b3314f33f36e73d609f12f89.jpegimage.thumb.jpeg.3540a7f04f8bc5f319ccd77618d247ea.jpegimage.thumb.jpeg.55d325735f7cb2d47004c2acb4a47ffa.jpeg

Here is a photo of the setup

image.thumb.jpeg.10d52ebff816f9e53a63901b00ef73ce.jpeg

After the coiled rope is dry the excess threads were cut and a coiled rope with a small extra loop was achieved.

 

image.thumb.jpeg.b5b04abc68e038b6e98cf92f7d807941.jpegimage.thumb.jpeg.8096d8aaca8c0b10e1de8014388fd1da.jpegimage.thumb.jpeg.ce13cdd8f5bf9a544a2b16261dad1137.jpeg

A total of 95 coiled ropes were made. They were installed one by one to their designated belaying pins. Here are some photos.

 

image.thumb.jpeg.0fe87f200b195e22baaf3aeb59d434c3.jpeg

image.thumb.jpeg.171c83d127caa06ebeadce81942ede66.jpeg

image.thumb.jpeg.f1aa304baac9a2295743d1b5c9681657.jpegimage.thumb.jpeg.0abf0f90548c26064d3b7d027618a6f9.jpeg

image.thumb.jpeg.c2ea08484fa7281fad6dffa27dee9930.jpegimage.thumb.jpeg.e7200f3b5fb396841930835f00aeb9ac.jpegimage.thumb.jpeg.bb921e4f11229212ea145bf6b593d581.jpegimage.thumb.jpeg.deacebae519c12248badb987997d5238.jpegimage.thumb.jpeg.6591aab337e0595ae3b434ca587f1753.jpeg

image.thumb.jpeg.c114360d0f829e6f7c3abd41b8231d59.jpeg

image.thumb.jpeg.e2a79a8887b4e30fcf7913529f55f69f.jpeg

image.thumb.jpeg.a1a3d504e28a20f3fca63ca5933b04c3.jpeg

image.thumb.jpeg.302b14b3044e3cd895893ae00c4c0540.jpeg

image.thumb.jpeg.a1dd6f3c94bc9b2dee0475d230cb4fab.jpeg

image.thumb.jpeg.f37fd2ad074ca22571278c15929f9e91.jpeg

image.thumb.jpeg.ecb48007551d0bb9eb6029c4c05ba6f9.jpegimage.thumb.jpeg.6b10a5e4c3322cf3b31c9243ee70635c.jpeg

 

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

50 minutes ago, yvesvidal said:

Your work on the rigging of this ship, is incredible. I am wondering if you have not sailed the real thing.....

You are a perfectionist.

 

Yves

Thanks a lot for nice complimants .

I just try to do my best ..

My experience with the real thing is close to none and limited to leisure rowing in my younger ages..😌

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

Hi Halit!

Your sails are fantastic!!!   Easily some of the best on any build log here at MSW.

 

 

Is the white thread used for the coils from the kit?  

 

Allan

PLEASE take 30 SECONDS and sign up for the epic Nelson/Trafalgar project if you would like to see it made into a TV series.   Click on http://trafalgar.tv   There is no cost other than the 30 seconds of your time.  THANK YOU

 

Link to comment
Share on other sites

9 hours ago, allanyed said:

Hi Halit!

Your sails are fantastic!!!   Easily some of the best on any build log here at MSW.

 

 

Is the white thread used for the coils from the kit?  

 

Allan

Hi Allan!

Thanks a lot for your comment.

‘White’ is actually (very ?) light tan color. Probably the existing light conditions when the photos were taken caused it. I used the thread from the kit as well as the sewing thread ( cotton and synthetic) I bought later. The thick rigging lines of throat halliards, throat and peak halliard tackles, main sheet, fore lower yard lift and fore lower yard truss are from the kit stock ; therefore their coiled ropes are the same. For the thinner ones I do not remember exactly which coiled rope was from the kit. The seizing lines of the blocks were the thinnest thread (cotton) I had and were bought later. There was  a third group of tan colored threads also and  they were all cotton ( the fuzzy ones) thread lines from Artesania Latina company. The same applies to black colored threads also. Although black thread was easy to find in all sizes, both cotton and synthetic ; for tan color it was not so. At least for synthetic ones. However I discovered later when the model was finished that embroidery supply stores do have all colors, all sizes and both cotton or synthetic….

Hopes this answers your question

Have a nice day..

 

Halit

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

4 hours ago, halituzun said:

I used the thread from the kit as well as the sewing thread ( cotton and synthetic) I bought later.

Hi Halit

I don't know how easy or difficult it is to get rope rather than thread in Türkiye but making proper rope is not a difficult task if you cannot buy it easily where you are located..   For the future,  there are inexpensive ropewalks including the one from Syren, or you can get some gears and make your own ropewalk.   If you look at the string you used and miniature rope in the photos below you can see there is quite a difference in appearance.  

Cheers

Allan

407233565_Ropeversusstringorthread.PNG.d686c20d8969858cda19b9b82361e5f9.PNG

 

 

PLEASE take 30 SECONDS and sign up for the epic Nelson/Trafalgar project if you would like to see it made into a TV series.   Click on http://trafalgar.tv   There is no cost other than the 30 seconds of your time.  THANK YOU

 

Link to comment
Share on other sites

Topmast backstays, main and fore  shrouds were the remaining standing rigging.

In one of the previous I posted the photos of lower deadeye stropping and  chain plates. Here are them again as a reminder.

image.thumb.jpeg.f82f4f7b2de861cadec7a80ba712a30a.jpegimage.thumb.jpeg.c32a6ac85aea6110263ea8ed394f6126.jpeg

Shroud line lower deadeyes with chain plates.

image.thumb.jpeg.d166d84fc181dfe611cfa7298735a350.jpeg

Topmast Backstay line lower dead eyes

image.thumb.jpeg.6fdca36c1ac1e6864c3a1950fc129adb.jpeg

Those deadeyes were painted black.

The next step was the preparation of the upper deadeyes. Just like the lower ones, they were also stropped with wire but with 0.2 mm black one. Here is how I did it. Photos probably be self-explanatory. Please note that the deadeyes were fixed to the scrap base wood by two nails.

image.thumb.jpeg.2245045b84aebca0a775ff3ce4912bb0.jpeg

image.thumb.jpeg.1e0df9b6cb815354e957f0b1f4bc0974.jpeg

image.thumb.jpeg.3b7c5baf1cf6ce1788183c510af0e157.jpeg

Then an overhead knot with 0.15 mm black synthetic thread was tied as close as possible to the deadeye and strengthened by a touch of CA glue. The wire was cut to size as seen in the photo . 0.3 mm black thread used as the rigging line was passed through the small opening between the knot and  deadeye.

image.thumb.jpeg.d378aa73f46233fc7563fae3ecd1239d.jpeg

image.thumb.jpeg.ebbca1aaafd844115aaf10c52509bed2.jpeg

image.thumb.jpeg.4bcbe6f0976408f34ea052022f5eee93.jpeg

Seizing of the rigging line and the remaining wire was done with 0.15 mm synthetic knot thread. The seizing was not textbook done . I made alternate continuous knots with one end of the 0.15 mm thread , which later found out that the technique  was called  ' Mississippi Whipping'. 

image.thumb.jpeg.d251ce33ceababda87408e9e67db7a87.jpeg

 

image.thumb.jpeg.ca9fca1a72304fb452d55d3d5159e0ff.jpeg

All the upper deadeyes were seized to riggings lines. Here you see the lower deadeyes with chain plates and upper dead eyes with rigging lines for shrouds.

image.thumb.jpeg.a86f094296a0ed13786302fa21cc10e8.jpeg

The chain plates of the lower deadeyes were dry fitted and were given their final shape and length. This was done to each and every chain plate. All the shaped chain plates with deadeyes were put aside with their exact location marked.

image.thumb.jpeg.2c2d58d4f798afe36038bd7eccc3d0df.jpeg

Please disregard the Turkish terms in the below photo.

image.thumb.jpeg.ffe04127234ee3d06a1abd6e84d99038.jpeg

The next step was the reeving of the lanyards. In order to maintain a uniform distance between the lower and upper deadeyes I chose to do this step before the shroud lines were seized to mast heads. At one corner of the jig board which  the other corner I used for experiencing Tom Lauria's method for coiled ropes, I prepared a 1:1 scale plan for the distances between shroud deadeyes (16 mm ) and Topmast stay deadeyes (28 mm) separately . The lower deadeyes were fixed at the top of the jig board with a clamp. A self retaining tweezer was holding the upper deadeye and shroud line thread was fixed by another clamp to the base of the jig board. 0.2 mm tan colored synthetic thread was used for lanyards. After reeving all the lanyards, all the prepared lines   were put in their location indicated places.

image.thumb.jpeg.2b9c3ab938f10ffd392e3dc9e98fae6d.jpeg

image.thumb.jpeg.dcf8d58488243949fcacb91ca477f321.jpeg

image.thumb.jpeg.ddcb465985104b2c5f7389d7ec15e1ca.jpeg

image.thumb.jpeg.a3263d69ae2c1a44d9573eb77ca40ff1.jpeg

image.thumb.jpeg.66b9e53019c35f170cb42d54049bcca9.jpeg

image.thumb.jpeg.1ca77675c6e24534a4506f825c6ae115.jpeg

image.thumb.jpeg.d76eadafaa8c3e57b35e0909cec3f49a.jpeg

image.thumb.jpeg.28d3b4d707163ca8e4aaf0619217e330.jpeg

image.thumb.jpeg.7179b6f4198c58ecf8b28eed5ccb50cc.jpeg

image.thumb.jpeg.72ab5473caf0f57bda241d40a4e87717.jpeg

The next step was the rigging of the prepared lines. In order to elevate the chain plate platforms to horizontal eye level  and to visualize the hull area  where chain plates were to be glued, I used some hardcover books as seen in the photos below..

image.thumb.jpeg.696a090508b9556551dd13b68f3ab4e4.jpegimage.thumb.jpeg.0cc8c3e0103922dbf493e3fdf73e3e2a.jpeg

I started with the Topmast Stay lines. Lower deadeyes and chain plates were glued to place by applying gel CA glue to the holes on the chain plate platforms first. Then the chain plate was glued to hull. Here it was impossible to drill a hole and place a nail because of the scale. Liquid gap filling CA glue was then applied to the hole which deadeye sits on and to the chain plate-hull point. 

The installation of the Topmast stays was done in the order of port-fore, port-main, starboard-main and starboard- fore. Here are some photos of this step.

 

Port fore

image.thumb.jpeg.c1b99c6d1bd96a0f6ef1b6ff383fc7ba.jpeg

Port fore and main

image.thumb.jpeg.2899dc18f15748c0fbf90b4d94d27cea.jpeg

Starboard fore

image.thumb.jpeg.3f67fcd26533e792d78117b6d6b0e433.jpeg

Starboard main

image.thumb.jpeg.f056e01ac212733cbe7a4c4ae99b8c72.jpeg

Starboard fore Topmast stay chain plate

image.thumb.jpeg.c88133a8e86cbc40b9e49d3a3a5d71e9.jpeg

Port fore Topmast stay chain plate

image.thumb.jpeg.47c6042275afff2fb0fc8ccbf9ed678e.jpeg

Then I started with the shrouds. I did port main shrouds first. After installing all three deadeye and chains I tied a guide line at a necessary distance to the three shroud lines. The guide was used when looping the shroud lines around the mast head.

Port aft lanyard systems glued in place.

image.thumb.jpeg.b536ae42fafb0505ba504937b70c4e3c.jpeg

Guide line knotted.

image.thumb.jpeg.99cd946e68f27459a7c0ab579a719e05.jpeg

Guide line looped around mast head and pulled down.

image.thumb.jpeg.62dcee23ce6c2598dd1f8f90b7c6c3be.jpeg

Shroud lines around the mast head

image.thumb.jpeg.947a54c43ecf85122d9e01b37f158a09.jpeg

Ascending and descending shroud lines were tied with an overhead knot using a smaller size black thread after checking the shroud lines were as taut as necessary.

image.thumb.jpeg.d5f792c116da9e7c6c2cfe462d9b9406.jpeg

Then the descending three lines were cut as close to the knot as possible.

image.thumb.jpeg.ab316fa230551a628ac5df22fb02c45b.jpeg

Port aft shrouds were installed.

image.thumb.jpeg.3a2fa96b10e6943a67729b5b439a534b.jpeg

image.thumb.jpeg.6e29c67da619414b669105746f08c4c1.jpeg

Port aft shrouds  deadeyes, lanyards, chain plates and chain plate platform.

image.thumb.jpeg.2f8c973409c4a7e194a8354ed0e8d5d7.jpeg

Starboard side fore and main shrouds were done in the next step

image.thumb.jpeg.5e07defbef86ba89cf887eaabafaa309.jpegPort fore shrouds were the last ones done.

image.thumb.jpeg.24dde8408137ea275fdd8c435911f860.jpeg

The rigging line and blocks for fore lower yard braces were now can be installed as the shroud lines were  done. This line originates from the fore shroud line of the aft shrouds, reeves through its same named block at the arms of fore lower yard and comes back to the shroud line and reeves this time another block with a long pendant and belays at the pin rails. Here you see the starboard side brace rigging line at origin and reeving through the block with a long pendant.

image.thumb.jpeg.90c504a96ee0f8ef210502b982e42ffc.jpeg

image.thumb.jpeg.9b183fe9a1895e73e5df07a3af0eb391.jpeg

Port side fore lower yard brace rigging

image.thumb.jpeg.b4c43fa27dcd5e124a3204282f46aec5.jpeg

As the shrouds were finished the next step was the ratlines. However  running port (red) and starboard (green) lights and wood sheer poles of the shrouds must first be installed. After the positions of the running lights and wood sheer poles  right above the upper deadeyes were set, they were installed.  Set up photo of this step

image.thumb.jpeg.09b8008fa0c63f002ff551eb95fb4629.jpeg

 Starboard fore

image.thumb.jpeg.ddf632de6d2f5c6371edc58b16b1c68a.jpeg

Port fore

image.thumb.jpeg.a5bf8d5424b9d04b0e8699822730aea3.jpeg

Starboard main

image.thumb.jpeg.361800f748cb44214cbe3c993f8ee5c4.jpeg

Port main

image.thumb.jpeg.e0a764a23b53a6343e776b32c3f328f8.jpeg

I continued with the  wood battens of the shrouds. I prepared a marked jig from a thick cardboard indicating the level of the battens for each one of the four shrouds and used them when installing the battens. The battens must be parallel to the deck or to the base platform.

 

Starboard main batten jig

image.thumb.jpeg.be9a9054fa4ec3b9091058842cb0c16b.jpeg

Port main battens

image.thumb.jpeg.2cfd366fee126be6476b2c0e919669e4.jpeg

Port fore battens

image.thumb.jpeg.d5d3daabf7adb4c7d69513c7e027b1d5.jpeg

Photos after the wood battens 

image.thumb.jpeg.56276de313a81bd4cc7af7d755967442.jpeg

image.thumb.jpeg.da558f540af23c08abd8c4d18abcb86e.jpeg

image.thumb.jpeg.542d744da4be805c6c5c68008659d2c1.jpeg

Finally it was time to tie the ratlines. The jigs used for wood battens were used again but with the guide lines for rat lines were drawn this time. As you can see the distance between rat lines was 8 mm.

image.thumb.jpeg.5d56756fd7ecd0464a6a8601adddba46.jpeg

image.thumb.jpeg.245203fe51dbd905719fe5e71c2a1335.jpeg

I started tying the  first knot to the left shroud line as I look. The first knot is a simple overhead knot. The knot was fixed with a touch of CA glue. The second and third knots are clove hitches. Ca glue WAS NOT applied until the desired position of the ratline was set. Then 3rd knot was  fixed with CA glue. Middle knot was left untouched. Ca glue was applied to some rebel! ratlines in order to  put them in position and order!.

Here is the setup for the ratlines.The jig for port main shroud ratlines was placed.

image.thumb.jpeg.cb53ca8dec6ad36e73548bf68303ccb1.jpeg

Proxxon flame torch was used to clean the tip of the glue applicator. Glue was poured in the green bottle cap in small amounts and the water in the paper cup was used to cool the glue applicator tip.

image.thumb.jpeg.3adf416e927469141f1a1e66710554d9.jpeg

Black thread, fine tip tweezers and fine tip scissors. Although not shown in the picture, bees wax was also used. The ratline job was done under magnifying glasses.

image.thumb.jpeg.0ca6c6a19e97483fdc27506154bd1b2e.jpeg

The rat lines  were done in port main, starboard main, starboard fore and port fore order.

Here are the photos of port main shroud ratlines.

image.thumb.jpeg.8bdbce2fb619db1fe9eb786c0d350706.jpegimage.thumb.jpeg.3963f22331e48f8c5d5f5e07a5115608.jpeg

image.thumb.jpeg.1988b3c391b2273a658cc2ea991ee75c.jpeg

Clove hitch 8 formation

image.thumb.jpeg.7ef8b27c26f0a7e5591d23a75139a1e7.jpegimage.thumb.jpeg.3d28e862928483c1eb89c0d9a962a72e.jpeg

 

image.thumb.jpeg.aca2aca305084f2d1a3f686f521c19d8.jpeg

During the process a misaligned wood batten was removed and placed again.

image.thumb.jpeg.32148b253ea559c0151084ff52969e55.jpeg

image.thumb.jpeg.8cf1e789a64aa10ae8cac1648e396470.jpeg

image.thumb.jpeg.925f231982a59a213bdf30f5f32950f7.jpeg

After the ratlines of port main shroud were done, the jig was removed. Lower ratlines looked good on a white background .

image.thumb.jpeg.5e9496c495ff8696d2706fdb64c378ff.jpeg

Then the excess thread of the 1st and 3 rd knots were cut as close to the knots as possible with a sharp and pointed tip scissor. 

image.thumb.jpeg.79460723afb3945ea98f5006ab958d66.jpeg

image.thumb.jpeg.3a7d6b80d5d6ed995fe44fdfd2e61e21.jpegUsing mobile phone cameras enables to take unusual angled photos.

image.thumb.jpeg.090bd0a3acf5512b19b268344b16d735.jpeg

image.thumb.jpeg.6b7616e42c92cf1a0b2f0aab192fa87d.jpeg

The other shroud ratlines were done in the same manner.

Starboard main shroud ratlines

image.thumb.jpeg.4f2144d363e5f6a6a521c44ad941d23a.jpeg

Starboard fore shroud ratlines

image.thumb.jpeg.9532541fa6a4ebb07327ff77b0c29227.jpeg

Port fore shroud ratlines. Here another misaligned (red arrow) wood batten was corrected (blue arrow).

image.thumb.jpeg.8c07c09b83df71b29e32eec837a56f61.jpeg

image.thumb.jpeg.e529073345b94cc246ed749601333ad4.jpeg

image.thumb.jpeg.016a1ce742f8552f91a623e2adfe0bfa.jpeg

All the ratlines were finished. Here are some photos showing them altogether.

image.thumb.jpeg.d1861c5ce99f7aee6581d830b3866c6e.jpeg

image.thumb.jpeg.8782329a1e71f929036ea69886a2033a.jpeg

image.thumb.jpeg.13f14f5664a08afbef117c5f4932cb55.jpeg

There were a couple of  minor steps between shrouds / running light and sheer poles and ratlines. In order to maintain the subject integrity , I purposefully skipped them. Those steps will be dealt with the coming posts.

 

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

1 hour ago, allanyed said:

Hi Halit

I don't know how easy or difficult it is to get rope rather than thread in Türkiye but making proper rope is not a difficult task if you cannot buy it easily where you are located..   For the future,  there are inexpensive ropewalks including the one from Syren, or you can get some gears and make your own ropewalk.   If you look at the string you used and miniature rope in the photos below you can see there is quite a difference in appearance.  

Cheers

Allan

407233565_Ropeversusstringorthread.PNG.d686c20d8969858cda19b9b82361e5f9.PNG

 

 

Hi Allan

 

Thanks for your comment. The difference is enormous and you are quite right.

I am aware of the Syren company and also rope walkers both commercial and diy ones. However this model was my first experience with rigging and I did a lot of mistakes during the build. Not understanding the rope/thread difference was one of them. I checked the websites and especially Syren with admiration, a lot of times. But with the  current exchange of Turkish lira agains US dollar ( 1 US : 19 TL)as well as the shipping and import costs,  I hesitated for the purchase. A large amount of my kit stash and tools were purchased during my visits  (No shipping and no import tax) to US when my son was there and US/TL exchange was around 1:4. However in the future projects I am sure I will solve this problem..

 

PS: In the next post the ropes will be weathered and look a little bit nicer ...

 

Halit

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

In this step sails , except main sail which was done before, coiled ropes and reachable rigging lines were weathered. Of course it would have been better if this job was done before the target sail and ropes were weathered before. I used Burnt Umber oil paint diluted with a very small amount of turpentine. Weathering was done by dry brushing. Here are some photos of this step . Pre and post weathering photos are presented together. The first photos are before weathering.

 

Forestay sail port view

image.thumb.jpeg.f60b27ecb7f312dacd4f7d9f8aa5b282.jpeg

image.thumb.jpeg.e01bbc71ce1dc0342b41882ebf70249e.jpeg

Forestay Sail starboard view

image.thumb.jpeg.a42a326cfd58bb9a5f450eb1374a4902.jpeg

image.thumb.jpeg.182e4d505b4c1136f6ae9a3adcf47fe7.jpeg

Jib and Jib Topsail port view

image.thumb.jpeg.0a75c35adb24a8ec0a10d6cb0125dc3a.jpegimage.thumb.jpeg.0b7eef5ef392a15c42877577bf0709f1.jpeg

Jib and Jib Topsail starboard view

image.thumb.jpeg.69ab16c11341b239e28c5c5d6c259394.jpeg

image.thumb.jpeg.485f7b0d14e48867b5303b425c5278f1.jpeg

Pin and cleat platform at bow

image.thumb.jpeg.0fa15eafaaebdb1e7c3367bc76a097b9.jpeg

image.thumb.jpeg.7fd05c71b85faa14ae0743559341246c.jpeg

Fore mast fife rails

image.thumb.jpeg.6f02c57d51ad08ca41bc18a6ccb9a6a8.jpeg

image.thumb.jpeg.675af91ee9191e09bfc0e3512890e5e2.jpeg

Starboard fore pin rails

image.thumb.jpeg.13653436a636fbfc22a6c2353cb215f8.jpeg

image.thumb.jpeg.be30ebc421b2c35b9a2133e0b6926678.jpeg

Port fore pin rails

image.thumb.jpeg.463d37fb91b74bdfb4c6e18312a14fc7.jpegimage.thumb.jpeg.527e0e3ab00eb69b9a9b61d1d74adea8.jpeg

Starboard main pin rails

image.thumb.jpeg.a0b054e6438d1893613b6fe95e0e0ae5.jpegimage.thumb.jpeg.2457db190c13c63f8dde09694b96f416.jpeg

Port main pin rails

image.thumb.jpeg.f44b28aa29513a05e6b3c404a62aa715.jpegimage.thumb.jpeg.4320e2e9795acf636fc46ea0629d8d8d.jpeg

Main mast fife rails

image.thumb.jpeg.cef254c53e1cb1416ae66a7299e126ad.jpeg

image.thumb.jpeg.edc3d98b23069e99a9978d2f73e370c3.jpeg

Port view of main sheet and boom guy rigging

image.thumb.jpeg.d6611fc3324c8b33aafb92fcd5ae9eda.jpeg

image.thumb.jpeg.f7619355a9529836f68501065e182e7a.jpeg

 

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

I continued with the remaining details.

The holes for main rail life line stachions were drilled before. The stachions were prepared from 0.5 mm diameter brass wire. Two wood jig were made. First one was to cut the stachions to the same length. The second one was to set the height of the stachions when they were installed in the holes  Here are photos.

image.thumb.jpeg.a2773062db3db481f2175cfcae22ffa3.jpeg

image.thumb.jpeg.bcbc285a78cec9a96fe3227c69fb8e55.jpegimage.thumb.jpeg.fa67fdd593641725256bf2280d70524f.jpeg

image.thumb.jpeg.25cd8cda1928d4b77adf8ff9d51ca14d.jpeg

Black circles  (red arrows) at the holes were made by 1 mm tip dotting pen using black oil paint. They were made to simulate the collor on the real ship's life line stachion base.

Dotting pens are used for nail art. 

image.thumb.jpeg.8b79b6dc558ae088a46f05f8d5111755.jpeg

image.thumb.jpeg.dae1870758a1287c723eb63bd6c240d6.jpeg

Here are some photos of the life line stachions.

image.thumb.jpeg.f96e3b46394853e93eb0f0cb7f2ec612.jpegimage.thumb.jpeg.6ca1932689ed2c5f0a2d52627b6582bb.jpeg

image.thumb.jpeg.3d546fa4ca8fd3b3581a3108c021720c.jpegimage.thumb.jpeg.b08462457eb8adce6676176fe5360d67.jpeg

Swivel guns were installed in place.

image.thumb.jpeg.5b030eae0cae086da0e39c5ead2378de.jpeg

image.thumb.jpeg.e0a2a9f9a310f54803487e52682ae2f9.jpeg

There are 4 cleats seized to the aft lines of all four shrouds. These cleats were much smaller in size than the already modified cleats of the kit stock. Threads were pre-seized to the cleats before their final seizing to the shroud lines in order to make the job easier. Cleats are seized close to sheer poles. Halliards of Ship's pendant, Maryland and Baltimore Flags and signal flags were seized to these cleats.

image.jpeg.41d7b7a6558e835117b799c62e12aad4.jpegimage.thumb.jpeg.983dbd8176bc36972ac279f51fe8e8ca.jpeg

Seized on the  fore lines of the main shrouds was the last rigging of the model. Main Stay hauling tackles were formed and seized.

image.thumb.jpeg.692a0d549f44e90f39381f3f1df5cc96.jpeg

image.thumb.jpeg.de33800dc518a962a90a9f2e905befcd.jpeg

Finally life line was installed.

image.thumb.jpeg.8859b990b435acdd1025f6924b0c2f0b.jpeg

image.thumb.jpeg.b40849b34bd2848931ac8884ebbdf8db.jpeg

image.thumb.jpeg.d06bca9e6f01b87064b91bca7b4166da.jpeg

image.thumb.jpeg.c17a253c75c41567a1abebf4743adc29.jpeg

There was only one step left to  finish the build.

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

The last step of POB II build was the installation of the flags and ship's pendant.

 

The flags and the pendant were prepared before. Flag photos were retrieved from internet. Pendant was designed, drawed and saved as a picture using MS Powerpoint. Using 'format picture' in MS word and discovering its 'skew' function even drooped like pictures of the flags produced. Prints on several kinds of paper were made in the print shop and put aside.

Paper prints

image.thumb.jpeg.c130bda7b57542724c139973a8ecb7fb.jpeg

image.thumb.jpeg.e3b9a9c057b2b59420b41ff68f09f79e.jpeg

Skew function results

image.thumb.jpeg.28a07736e6056bf5320165ea549e1528.jpeg

image.thumb.jpeg.f85226f8db999f2ebeb24099d21530c1.jpeg

image.thumb.jpeg.271c29957a271b6877af263a144f4e34.jpeg

image.thumb.jpeg.7f71ba532d9fe10cf4d7c7ec6b6ff152.jpeg

Then the manager of the print shop suggested to print on cloth. Here the important factor is the choice of cloth type. The best is silk (which was not thought by me or manager at that time) and quality cotton or linen with dense weaving follow. There are  two methods of printing on cloth ( as the manager said) : direct transfer or sublimation. Here is photo showing the difference between them. Red arrow indicates the direct transfer sample.

image.thumb.jpeg.9cdb5ec875d8404db6803205ab19c59a.jpegimage.thumb.jpeg.1e9c50f96e46b3649626cc734fadfa1e.jpeg

Sublimation method

image.thumb.jpeg.93ec721a14219d0547700dbd55c43017.jpeg

Printing by direct transfer creates a layer on the cloth and thickens it. In sublimation method the dye diffuses into the cloth and looks more natural to eye. The colors look pale in this method , however with adjustments done before and during printing may solve it. After all printing to cloth was not a routine daily job for the print shop and I am sure they can develop the method and output quality if demand increases.

 

At the stage of final preparation of the flags I  made an experiment with a sample which was not skewed!

The US flag was folded and glued by textile glue. Then it was clamped between two wood strips which was  clamped in a vise. The flag was wetted by water and a metal clamps were used on two points. Water diluted white glue was applied. After the flag was dry it was removed from the jig. The result satisfied me.

 

image.thumb.jpeg.e0e5987f25491f940c71aea06e854aad.jpeg

image.thumb.jpeg.75e9324c0b212c5f87001777f76dd1d7.jpegimage.thumb.jpeg.4c33fff60147a595c11bac39f29933e9.jpeg

image.thumb.jpeg.abf85e3d2a1264cdbc2b910002c11194.jpeg

image.thumb.jpeg.6286df271c70e3f8b384d4e1ecf87c4d.jpegimage.thumb.jpeg.28a07736e6056bf5320165ea549e1528.jpeg

However the size of the skewed flags were somewhat smaller and I decided to use the straight samples. In order to simulate the flag grommets and halliard snap hooks  and thus make the flags interchangeable in future, I decided  to make the arrangement seen in the photo below.

image.thumb.jpeg.a5419b75a4b7347ca03ab5dcbb2ce17e.jpeg

The flags and pendant were cut by using a sharp knife and steel ruler. The excess cloth was left at the flag ends. The pendant used was the one with red arrow.

image.thumb.jpeg.d03121d9cb8e6b352a8a9e4c9936455d.jpeg

On order to make the ropes with looped ends to simulate grommets, a jig was made with separate distance positions for the flags and pendant. Thread was bees waxed.

image.thumb.jpeg.b2b7a651d5a32e0b2677da4064e93732.jpeg

Ropes with looped ends were made for all flags and pendant

image.thumb.jpeg.2906f04ff7f6d357246e520009aef82f.jpegimage.thumb.jpeg.9aaced23cb2048cba890433989c05fd4.jpeg

image.thumb.jpeg.c6f5c5531be811ae55576b1e8cbcb68f.jpegimage.thumb.jpeg.941e9be1570511e0f334e855c5431c84.jpeg

All the flags and the pendant were ready to be folded with the ropes with looped ends ready too.

image.thumb.jpeg.e8d4c4ebe72eb57d59d0886d9e1ce3e8.jpeg

This was the method. The rope was glued first. Then the pendant was glued folded over. It was clamped between two wood pieces to dry.

image.thumb.jpeg.5e0f71e254c88253477f7a704af9b495.jpeg

image.thumb.jpeg.6e1f25cfd729074726df49b38a1781d6.jpeg

image.thumb.jpeg.4e1f48d7e74521e6fd859c4b68fbfdec.jpeg

image.thumb.jpeg.3d21ac20899f6fdbbdbf32f97258192b.jpeg

All the flags were ready with their loop ended ropes. The flag fronts were cut to size

image.thumb.jpeg.2af85030df5ce1e81730b536c40b0b9b.jpeg

The next step was to prepare the halliards for each flag and the metal rings to simulate snap hooks.

I decided to make rectangle shape rather than circular ring shape.

image.thumb.jpeg.6fa3ba886a98f402c6838b5da6e885ed.jpeg

Another jig was made and the halliard line was fixed leaving a part of it where the flag is to be seized. First the upper metal clip was glued and later seized to halliard line.

image.thumb.jpeg.5923e70c29652dbbdbd8659576282c77.jpeg

image.thumb.jpeg.d1d6f45c9a4d337291e4243c0a9e89b0.jpeg

image.thumb.jpeg.dff90a16dd36a705b70febf330d2bb55.jpeg

image.thumb.jpeg.050a7da3d98dc313152ba4bcb7f66fc1.jpeg

The flags upper loop is hooked to the metal clip and the position of the lower loop was marked on the halliard line. The lower clip was then seized to halliard line at this mark.

image.thumb.jpeg.466ee76cc9fafcf6a5c2778df9fd3c1a.jpeg

image.thumb.jpeg.22b3a4e66d992183b4bfc2346d3e215a.jpeg

image.thumb.jpeg.483fcf6898befe9d87f36928d04aed7d.jpeg

image.thumb.jpeg.76462648814448fd81e3b3854ca40b91.jpeg

Flag is then hooked to the upper and lower clips. The excess rope of the clips cut. 

image.thumb.jpeg.6a17e8c8a8c5e9288c259201a7b3ad2b.jpeg

image.thumb.jpeg.ecea4f096db98629b686c8643a6199aa.jpeg

An alternate way to seize the metal clips to halliard line. First place the loose  knot at the mark. Then insert the metal clip later.

image.thumb.jpeg.56f770d33af0950f8a7df1a1ebeb49d5.jpegimage.thumb.jpeg.7a832e299053efd5e49e0fa12a3d45f1.jpeg

image.thumb.jpeg.8cf4f1f558c46cf067ae6eeef8ba18ea.jpeg

After all the metal clips were seized to their halliards it was time to give the flags and pendant their final shape. I used the same technique I described at the beginning of the post.

 image.thumb.jpeg.2ab668a2415b281812feef048a73bc98.jpeg

image.thumb.jpeg.6ab68b31931cccbdf116df76d5c221eb.jpeg

The Baltimore flag was put to dry in upside down position . It was treated  again. As all the flags were shaped and their halliards  with metal clips seized were ready,  the final step was to install them on the model.

image.thumb.jpeg.75b3f731f6cd64a8689eb74574c820a6.jpegimage.thumb.jpeg.914ca118ac42ad8d586c6af83ea652fe.jpegimage.thumb.jpeg.b5b78ee782ab87376ffda0aa126e476f.jpeg

image.thumb.jpeg.e2c2c0654d0d8e1379c9f2cc6b6e9758.jpeg

By the installation of the Baltimore Flag , 27 month build journey was finished. Here is the first photo I took right after the last flag was installed.

image.thumb.jpeg.a7e57b04c5b1ee11f1c201bd8737d4f7.jpeg

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

My first and only purpose for posting this blog was to be helpful to the ongoing or future builders of this model. During my build time to access to detailed build logs was very limited. I hopes the blog serves as it was intended to.

This was my third ship model, but the first with sails and proper rigging. All the methods I used during this build are not the only ones and maybe not the correct ones. I made a lot mistakes . But mistakes also teach you. At least tell you what not to do the next time.

I thank all the viewers, likers and commenters. Your interest is much appreciated .

Happy and healthy modeling days to you all....

 

PS : Finished photos can be viewed ın the link below
https://modelshipworld.com/gallery/album/2633-pride-of-baltimore-ii-by-halituzun-model-shipways-164/

 

Edited by halituzun

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

1 hour ago, Mic_Nao said:

Nice work, not easy at this scale.

Thanks a lot Mic_Nao....

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

3 hours ago, halituzun said:

My first and only purpose for posting this blog was to be helpful to the ongoing or future builders of this model.

 

I believe you have succeeded! Thanks for sharing this great resource with our community!

Chris Coyle
Greer, South Carolina

When you have to shoot, shoot. Don't talk.
- Tuco

Current builds: Brigantine Phoenix, Salmson 2

Link to comment
Share on other sites

2 hours ago, DonBMichigan said:

Gorgeous, amazing details. Nice work!

Thanks a lot Don..

Halit Uzun
Bodrum, Turkiye

A happy retired surgeon, active scale modeler and bird photographer

 Finished Models

Pride of Baltimore II  (finished photos)

https://www.facebook.com/halit.uzun.5621

https://www.instagram.com/khalituzun/

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...