Jump to content

Recommended Posts

Posted

Next completes the anchors and lanterns

 

IMG_0870.thumb.jpg.dd6d86a79a5171ba130d480bb391611e.jpgIMG_0869.thumb.jpg.9f0753b4966ec11c04602bebbfce52fd.jpg

 

Followed by the catheads.

 

IMG_0872.thumb.jpg.326cd6c75953b3efc00cc2a128e620b5.jpgIMG_0871.thumb.jpg.5f331d05e77159a0129b725df27c2e46.jpgIMG_0873.thumb.jpg.147842705707265f6d4d1f37006b0406.jpg

 

Next were the channels.  Although not called for, I drilled holes into the channels for pins

IMG_0876.thumb.jpg.354e1b2b06527c3c36db1e60c08166de.jpg

 

Followed b y hole in the hull to glue and secure the channels a bit better.  Things look pretty even. The instructions are a bit lean on placement relying on a lot of careful observations of the pictures.

 

IMG_0882.thumb.jpg.084c75937d30ae565ad06d99e6c821d2.jpgIMG_0881.thumb.jpg.aeb8d54011e49e2de7f69f24f605154b.jpgIMG_0880.thumb.jpg.b163ea0b823953e28bf9141bd22acf9d.jpgIMG_0879.thumb.jpg.4dd9f764d6d838ecf397d3bca6ee7094.jpgIMG_0878.thumb.jpg.bb238ee2151d0764e5f8d148840b8367.jpg

IMG_0877.jpg

Posted

Now completed the chains. Do not know why Occre not using photo-etched chains like Vanguard. Only have the buckle and you need to make the chains out of wire. The wire guage the provided not strong enough so used  one that I had left over from other project (always keep the left overs as they often help in other builds).

First wrap a piece of wire around a deadeye and twist

IMG_0913.thumb.jpg.834f0f6960a5347584843f02eaf04e79.jpgIMG_0914.thumb.jpg.a5691d9d70a5940f85bde50c530d2385.jpg

Next cut off one limb and insert into the channel

IMG_0917.thumb.jpg.62601a05f878611d11dec18fed60ccc8.jpg

 

Trim it the bend to form a loop

IMG_0919.thumb.jpg.41cd8dc4051464a0e9efad11159cca7d.jpgIMG_0920.thumb.jpg.39af47cb8d30b221cec63cdafa3728ae.jpg

 

To form the links I wrapped wire around a 10mm board

IMG_0921.thumb.jpg.0f18d4fc0f53645f264a7cf2772aa438.jpg

 

then cut one side of the spiral

IMG_0922.thumb.jpg.e6b7f72242b9f03d0aa2331252d73c9b.jpg

 

next release them

IMG_0923.thumb.jpg.9c8d9c8209927260742d7ed6d387286d.jpg

 

Linked 2 of them then attached to deadeye and added lower buckle ( a bit of adjustment needed) and mark and predrill hole

IMG_0924.thumb.jpg.c6f48ea9c381bd9750b49280ff6a3796.jpgIMG_0928.thumb.jpg.da8369e9eb5aa61af5816690c2cc49a4.jpg

 

For the backstays no buckle are used

 

 

*IMG_0925.thumb.jpg.a5a50f8383f29e84593df3791a0ed012.jpgIMG_0926.thumb.jpg.6067913fd52ada1caef52b410c79e8dc.jpg

 

 

Here is the completed work

 

IMG_0930.thumb.jpg.6cc170b65098ea547115370fa25d796f.jpgIMG_0929.thumb.jpg.2689e860801add547768f09702dc3f70.jpgIMG_0927.thumb.jpg.4aea9b01e8b358b56b8f0d0930112378.jpg

 

 

IMG_0916.jpg

Posted

 A lot of work over the week so far. First the lower gundeck ports fixed into place

IMG_0968.thumb.jpg.e592a9793e58e5b58861fcbdfb47003a.jpgIMG_0967.thumb.jpg.4f5814fd1e7a6f4f8c1cd28a820fc3da.jpg

Next the second lowest gundeck  beams added

IMG_0936.thumb.jpg.22e339c50d42a8d0f781fa6a90313c75.jpg

 

IMG_0936.thumb.jpg.22e339c50d42a8d0f781fa6a90313c75.jpgIMG_0963.thumb.jpg.8a5677bba87d8d1a686d7e5fa500caba.jpgIMG_0964.thumb.jpg.d6c2f6fd82e47f5f98ce5acf9374b25b.jpg

Followed by partial planking

 

 

IMG_0966.thumb.jpg.01bb4446dae91d96d438471a4c0ac4c4.jpg

Next the bowsprit opened up.

IMG_0969.thumb.jpg.6d00508948b6b5a2acba2149cfc932ad.jpgIMG_0970.thumb.jpg.1cc4da34af209609654a18afb7938211.jpgIMG_0971.thumb.jpg.413c6095ce263f6ef7e595f7276e4913.jpg

Guns added next

 

IMG_0973.thumb.jpg.cb09e3a5cd971fdbb81bc86eff8fb85e.jpgIMG_0972.thumb.jpg.a048852aa85d5769c6160d985c14ea13.jpg 

 

Then the gunport lids

 

IMG_0976.thumb.jpg.fa8838a47638fb6258c2b51c48fcb334.jpgIMG_0978.thumb.jpg.0f30fad18108f3672e73917597194720.jpgIMG_0977.thumb.jpg.a0f7350c379b0a659eaae128449e3eaa.jpgIMG_0979.thumb.jpg.5ed0daf95bcabe281042ffe1bbd88942.jpg

 

Last for the day the next set of deck beams added. For this deck no longitudinal bracing.

 

IMG_0974.thumb.jpg.3f11a967e4236ac85ab3b1e3a4821403.jpgIMG_0975.thumb.jpg.f304012f4a765b6249b4e257ef93f630.jpg

IMG_0980.jpg

IMG_0935.jpg

  • 2 weeks later...
Posted

Last couple of days spent putting on the side galleries, planking the poop deck and various decorations and bow netting. Boomkins will go on when finished with the rigging as I otherwise always break them

 

IMG_1051.thumb.jpg.bba62a52cd3178fca7774a59bbe86825.jpgIMG_1050.thumb.jpg.b7aa679ce0b79c44d10b274f8f7e6f2e.jpgIMG_1049.thumb.jpg.21fce0269e49226283b813740e071104.jpgIMG_1052copy.thumb.jpg.1b0c011fde380beecd92f283377e2fac.jpgIMG_1053.thumb.jpg.2168ec578ee2d517af5bd051ddcb3a73.jpgIMG_1057.thumb.jpg.30d5a9a2ca3092c76a1f04eab42c6166.jpgIMG_1055.thumb.jpg.64f8aa852c4cb60c8954eaed904691e0.jpgIMG_1054.thumb.jpg.fb7a50d5d43ab37177ba7cc296d1e8be.jpgIMG_1056.thumb.jpg.2180db158043ec14c068b9bcfed83b37.jpg

Posted

Last work for the day. I think another 2-3 weeks to complete the hull minus a few things I add later like the anchors, flag pole and davits As i tend to break them while doing the masts and rigging as they stick out. Big pain will be adding/sewing in the nettting.

IMG_1063.thumb.jpg.7db3d3948f30574578e6c5d1e3393159.jpgIMG_1062.thumb.jpg.ead147cdb69c7b1b9475f68c3513c946.jpgIMG_1061.thumb.jpg.fc8e3de3e5e0b2a0f9922f7d5261fbca.jpgIMG_1060.thumb.jpg.480dca28f408c99be8480c3eddebffc3.jpg

 

 

 

 

Posted

okay, the hull, minus boomkins, ship's boats on the davitts and the anchors (all added after rigging) is complete. Some pictures are views through the stern windows to see the lower decks. Looking at the mast plans, they don't provide a laser cut tops but require you to assemble them from multiple pieces pf wood. For a kit this expensive a bit cheap.

IMG_1074.thumb.jpg.4c1f294e522f99e6107a684113424a12.jpgIMG_1075.thumb.jpg.e8c8470f1833b978c398d37f7e2fa4f3.jpgIMG_1076.thumb.jpg.cda6e3b80855a4245f1bbc1c436a6843.jpgIMG_1077.thumb.jpg.84fabe6e518cbffe2b0c09b7692498b5.jpgIMG_1078.thumb.jpg.34a4b1d8d8059f0c0fd821e41afadcdd.jpgIMG_1079.thumb.jpg.86a8d9f2a7ed0c5e29b57b37f7f58031.jpgIMG_1081.thumb.jpg.7324c7c676c3bc7a296dc89275619e75.jpgIMG_1080.thumb.jpg.ff1c3fa1dfe912252472d07cba2129d3.jpgIMG_1090.thumb.jpg.e43b01619391266d0cc7a14eb5874198.jpgIMG_1091.thumb.jpg.b355a1bb218269242b7bd8349b9c3563.jpgIMG_1092copy.thumb.jpg.124a7f6fa1a33528e86a56d9b1e93458.jpgIMG_1093copy.thumb.jpg.24ac579ec7153358630af2f98ce8ec85.jpgIMG_1094copy.thumb.jpg.7335e3d062b98b0786df62b7c899cf25.jpgIMG_1095.thumb.jpg.43822811815e51b8381105bdd7b5d80b.jpgIMG_1089.thumb.jpg.5654263d6ac5c0465db3f3ef63a8445d.jpgIMG_1088.thumb.jpg.610bce9f5153256e3d993ee071318a97.jpgIMG_1086.thumb.jpg.640a7be84eb44f6435a3f5fb23f1a93c.jpgIMG_1085.thumb.jpg.38bf46fa3a074a39eedbc7a9ebe73a01.jpgIMG_1084.thumb.jpg.a3b9e95be9e3c9eeb5e332bfaf075db9.jpgIMG_1083.thumb.jpg.06924cbc97e3867585a881c6f49653ce.jpgIMG_1097.thumb.jpg.a4ced3bda44abb9a5959384ab1d269cb.jpgIMG_1099.thumb.jpg.f2da6640c9472f149a91f818b826d5cd.jpgIMG_1098.thumb.jpg.c2a902a9f2919b66ddd19fb6aa170a0a.jpg

 

 

 

The hammock nettiings took some time but I got a variety of nice curved needles (upholstery ones) which made things a lot easier.

IMG_1082.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...