Jump to content

HMS Indefatigable 1794 by Glenn-UK - Vanguard Models - 1:64


Recommended Posts

Main Breast Backstay Installation

Following on my last post I thought I would share the method I used to install the main breast backstay. With reference to the photo below I started by wrapping the backstay around the main topgallant mast and adjusted the height of the block seized to the end of the backstay to the required height. Once I was happy with the position I used a clamp to hold the backstay in the required position.

 

Maybe I should have seized it to the main topsail mast rather than the main topgallant mast but I am happy with what I have done therefore there is no need for anyone to comment on this aspect / error.

I-1297.thumb.JPG.36857bbd8f2eb6ad886dac8e10de2903.JPG

The eyebolts were dry fitted to the main channel, and clamps were used to hold them in place.

I-1299.thumb.JPG.79bb99cc5ab4c438397804c6c47bb59e.JPG

In the next photo the inter-block rigging has been added so that the lower block position could be checked with regards to the final belaying point, which is one of the shroud cleats, 2nd one in from the right as indicated by one of the yellow arrows.

I-1298.thumb.JPG.a30c038e74ce0d65d199c0676d0c8bb6.JPG

Once I was happy with how everything looked the inter-block rigging was removed and then the backstay was seized, as shown by the yellow arrow.

I-1300.thumb.JPG.b9adac3d3ac39096959a3a6ba4e3dab4.JPG

Next the two eyebolts were glued in place. I did trim and then bend the excess eyebolt material under the channel.

I-1301.thumb.JPG.ebc857c2b9dfbe226c30b9f635d62b0a.JPG

The inter-block rigging was then added and the backstay was tensioned. I will belay the rigging to the shroud cleat later on in the rigging process. The un-belayed end of the rigging thread is indicated by the yellow arrow.

I-1302.thumb.JPG.46f0b853463d17dc91545f230713e907.JPG

 

Glenn (UK)

Link to comment
Share on other sites

Posted (edited)

Main mast breast and shifting backstays, main topsail mast back stay and main topgallant mast backstay

After a few days work all the various backstays required for the main mast, the main topsail mast and main topgallant mast have been rigged and belayed. I am very pleased with how the Indy is now looking. Moving forward the next few days will be spent adding the various backstays for the fore mast, the fore topsail mast and fore topgallant mast. I have attached a photo of the completed main backstays.

I-1303.thumb.JPG.0c1ff698b1078535bbe0f2ab8d3682c5.JPG

The next two photos show the completed breast backstays, which have now been belayed to one of the main shroud cleats.

I-1304.thumb.JPG.4bca87b2f1f3d0611cf2730685086e92.JPGI-1305.thumb.JPG.435d82a6175ed054671e44ed956fbf4b.JPG

The photo shows shifting backstay and the topsail and topgallant backstays. 

I-1306.thumb.JPG.3d5a80baec753c06fce8bdebad0282c2.JPG

The next photo shows the belaying of the shifting backstay to a belay pin

I-1307.thumb.JPG.dd8ed52300772836b2fe88d05b338cb8.JPG

The final photo is a close up of the shifting stay eyebolt and block

I-1308.thumb.JPG.532e46a575b115fc4bca0e549c3fd144.JPG

 

 

Edited by Glenn-UK

Glenn (UK)

Link to comment
Share on other sites

Backstays

I have now completed all work related adding the various backstays.

 

Here are a couple of photo's showing the current build status, they are not great photos.

I-1309.thumb.JPG.617b47eaebb8c44db5b8295019b682d3.JPGI-1310.thumb.JPG.5e82fca9062ef2199f6472643be68985.JPG

The next photo shows the fore mast breast backstay.

I-1311.thumb.JPG.891d1c8557a24315872bda742b3f2c2b.JPG

The next two photo's show the shifting backstays and the topsail and topgallant backstays

I-1312.thumb.JPG.302511369c2c5dd7ecde2296b445c780.JPGI-1313.thumb.JPG.5e5a8b5bd7f5b6dd166d9cd59a7d8b7d.JPG

The final photo shows the entire lower foremast with shrouds and backstays fitted.

I-1314.thumb.JPG.7df9c352352b8f3e8f0d9900eac3550b.JPG

My wife and I have booked a short holiday for next week so I'm not expecting to make too much progress before we depart.

Glenn (UK)

Link to comment
Share on other sites

What a beautiful example of rigging of a ship.

If you keep up this standard she will be a master build.

Well done!

 

Alan O'Neill
"only dead fish go with the flow"   :dancetl6:

Ongoing Build (31 Dec 2013) - HMS BELLEROPHON (1786), POF scratch build, scale 1:64, 74 gun 3rd rate Man of War, Arrogant Class

Member of the Model Shipwrights of Niagara, Niagara Region, Ontario, Canada (2016), and the Nautical Research Guild (since 2014)

Associate member of the Nautical Research and Model Ship Society (2021)

Offshore member of The Society of Model Shipwrights (2021)

Link to comment
Share on other sites

Mid Deck & Quarterdeck Bulwark Hammock Cranes and Poop Stanchions

After completing the backstays my next intended task was to add the two main stay tackles. However as I was looking at the rigging plans and the Indy to check the belaying points I noticed that I had not fitted the various hammock cranes and stanchions to the gunwales. Also I had not added the thread to the quarterdeck barricade hammock cranes.

 

The easiest task was to add the 0.5mm black thread to the quarterdeck barricade hammock cranes. A length of black thread was cut and run through my block of beeswax. I then used a hairdryer to melt the beeswax which helped to stiffen the thread. The thread was then added to the quarterdeck barricade hammock cranes.

I-1315.thumb.JPG.792ff01ebfadeb5633eac014fb8ec85b.JPGI-1316.thumb.JPG.25801af7bc65ff90aa4adbfaca67baba.JPG

Next I moved on to the mid deck stanchions and hammock cranes. This uncovered another error with my build in that I had incorrectly fitted the mid deck gunwales, they were fitted back to front. If I fitted the hammock cranes in the holes provided the access to the Indy via the steps would be blocked. I simply added two new holes so the access via the steps was clear.

 

The inner stanchions were fitted and rigged first. Once they were done the hammock cranes were added. These cranes required a length of 2x1 to fitted as well as 0.5mm black thread.

 

I-1317.thumb.JPG.1390b6cbc8619cfd0cb3cce66e51fa58.JPGI-1318.thumb.JPG.8ea3a6b652eb43aac79f4adff0575e77.JPG

The next task was to add the Quarterdeck Bulwark Hammock Cranes and Poop Stanchions. This was a bit more difficult to do as access to the gunwales was restricted by the shrouds and backstays. However I took my time and I was able to complete the task.

I-1319.thumb.JPG.8581a0f4850754995642d012aa8a52a6.JPGI-1320.thumb.JPG.e5918222936ddd1c1c69b7d2d0fab3b3.JPG

I am hoping to add the two main stay tackles tomorrow before I go away for a few days so on my return I can then start work on making the various yards and booms.

 

 

Glenn (UK)

Link to comment
Share on other sites

Main Stay Tackles

Todays task was to add the two main stay tackles. There are a number of belaying pins that need to be added to the beams, as a couple of these are required for belaying the stay tackle rigging. It would have better if I had fitted these belaying pins before the beams were installed as the locating holes needed to be opened up a tad. For the most part this was easily achieved.

I-1321.thumb.JPG.e86685e950cf3e809398322f3d15ecd0.JPG

One hole was a bit more difficult to open up but thankfully I was able to do it

I-1322.thumb.JPG.04496ab015ea004e441e73c4f36fa030.JPG

The belaying pins needed to be trimmed so they would fit flush as are fitted to either side of the beam. Once I was happy with the test fit they were glued in place.

I-1323.thumb.JPG.06995db8c5282e083b6f4dd4869da854.JPGI-1324.thumb.JPG.bb5bbf4470de3bbc6ba7ff8050736d12.JPGI-1325.thumb.JPG.c0040e1fb2cace1a97512db3c9c99a5a.JPG

With the belaying pins in place I was then able to fit the two stay tackles. These tackles are indicated by the yellow arrow on the photo below. On reflection I should have positioned the lower stay tackle slightly higher up the stay as it is at a bit of an angle.

I-1326.thumb.JPG.dd9bc7eb8e23ca14f1867106a4f3cc5c.JPG

The first double block assembly was secured to the main stay.

I-1328.thumb.JPG.2623bf73cceabc8d8b8708a9b62950ee.JPG

The bottom block was secured to the beam with a hook and eyelet and once rigged the free end was tied to a belaying pin.

I-1329.thumb.JPG.819a28fe0206218ddab4bcac146ecf40.JPG

The completed first stay tackle.

I-1327.thumb.JPG.45900d6451b814ab71620921369bce41.JPG

The process was repeated for the second stay tackle.

I-1332.thumb.JPG.b2670f8d377c13c4c24a481f9d84d0c6.JPG

I-1331.thumb.JPG.1e6a9d8f051a76f3b078e2ec6645e44c.JPGI-1330.thumb.JPG.c496d5ae1c2014b3ee83d6f6dc25f72c.JPG

 

 

Glenn (UK)

Link to comment
Share on other sites

Spritsail Yard

I returned to the shipyard after a short holiday and added the spritsail yard to the bowsprit.

A locating pin was used to hold the spritsail yard in place with a touch of ca glue and was then secured to the bowsprit with black thread. I then added the spritsail yard tye rigging using a triple block arrangement and was then belayed to a hull timberhead.

I-1333.thumb.JPG.799fad22916d30c94acc755d8064fd69.JPG

Next I added the thread between the thimbles, not sure what this rigging is called.

I-1334.thumb.JPG.c5bee0baad964ea3cde2219ec4a27c86.JPG

Next I added the jibboom and the flying jibboom guy's. These pass through eyebolts on the spritsail yard and then are secured to the hull via a triple block arrangement. I have added a selection of photo's showing these guy's.

I-1335.thumb.JPG.b7c59df75f3536cb2c57c220170cce16.JPGI-1336.thumb.JPG.3f7ec916aa867768501e0d6ca6a1dd98.JPGI-1337.thumb.JPG.ee46f18a3ee807987db9627c1de52131.JPGI-1338.thumb.JPG.3ce4a6010a9194ea45fdedb1e0f436fd.JPGI-1339.thumb.JPG.3fadf96aa4801b122dc453095c7c2de6.JPG

There is still plenty more rigging required with regards to the spritsail yard. Once that is complete I will move on to adding the foremast yard. You will not I have not fitted the boomkin's and I am not sure if I will fit them at the moment.

Glenn (UK)

Link to comment
Share on other sites

Posted (edited)

Sprit Sail Yard

I have now run in all the remaining rigging required for the Spritsail yard but they have not been belayed, as can be seen in the first two photo’s below.

I-1340.thumb.JPG.2a8d03374c10e8470987a69c79c4fa0a.JPG

Spritsail Clew Rigging and the double block for the spritsail sheet

I-1341.thumb.JPG.e8d690276f2a6cce62d13a401b87229d.JPG

I am pondering what to do with regards to belaying the spritsail clew and sheet rigging. The spritsail clew line is straightforward as it belays to pin on rack located on the prow of the forecastle. There is a double block arrangement (as can be seen in the above photo) and one of these blocks is used for the spritsail sheet. One end of the spritsail sheet rigging is hooked to an eyebolt on the hull, just after the foremast channel. The other end is fed through a hole in the hull and is then belayed to a cleat located on the inner bulwark under the walkway. As can be seen in the photo below the thread has been passed through the hull.

I-1342.thumb.JPG.a2855cfb4c7aac31a22a2421dadebfa1.JPG

The position of the belaying cleat is shown in the next photo (out of focus). Access to this small cleat is very restricted due to the walkway and the beams.

I-1343.thumb.JPG.0484b6b567dc80af74247253a60267a5.JPG

I will try to belay to the bulwark cleat but if this proves to be beyond my abilities then I will revert to a simple solution of using a knot to hold the thread in place against the inner bulwark. Given the position of the walkway and the beams this workaround solution will not, in my opinion, distract from the overall build as this belaying is not really visible.

 

Foreyard Installation

Moving forward I am now turning my attention to adding the foreyard to the foremast. A little bit of preparation is required before the yard can be fitted to the mast.

 

When looking at the truss pendants these are wrapped around the mast, fed through thimbles and then dropped to the hull for belaying via a double block arrangement, as can be seen in the attached photo

I-1344.thumb.JPG.50fd01500a48ce7e27d84e0d272c79cf.JPG

I think it will be easier to fit the truss pendants to the foreyard before installation, and with that in mind I have created the thimbles and the truss pendants are now ready be added to the foreyard.

I-1346.thumb.JPG.ea15d9da03f24741348e8b243a4a7c05.JPG

 The nave line is added to the truss pendants as shown in the next photo.

I-1345.thumb.JPG.f5a1ac1faca87b5c5187f83b395d71ec.JPG

Next I prepared the nave rigging. This consists of a length of thread secured to a wooden thimble. Another length of thread with threaded thimbles on each end was fed through the wooden thimble. The nave rigging will be will be added to the truss pendants after the foreyard has been added to the foremast. In the next photo I am checking the truss pendants will pass through threaded thimbles.

I-1347.thumb.JPG.4e70851f8a2f292f25445c0da0d05a69.JPG

 

Continuing with the preparation the next task was to prepare the rigging for the sling (black thread) and the two jeers (natural thread, as shown in the photo below.

I-1349.thumb.JPG.4caeadf06afe3a7d7e6f9d22674b92a4.JPG

The final task was to secure the truss pendants to the foreyard. Once these had been added I performed a test fit. I soon realised I made a school boy error because the truss pendant thimbles need to be position close to the yard (as per the plan sheet diagram) and not as shown in the photo below. For some unknown reason I thought (incorrectly) the thimble end would tighten up against foremast once the other truss pendant thread had been threaded and tensioned.

I-1348.thumb.JPG.83ce11e6b503a28e5a452a74c0676ed5.JPG

 

Edited by Glenn-UK

Glenn (UK)

Link to comment
Share on other sites

On 4/29/2024 at 12:32 PM, Glenn-UK said:

Next I added the thread between the thimbles, not sure what this rigging is called.

We would secure with a half hitch or two between tackle (two blocks or even thimbles) and may complete by wrapping the standing end around further and finish with another half hitch to hold it there, or alternatively simply coil the remainder of the standing end of the line and place it out of the way.

Alan O'Neill
"only dead fish go with the flow"   :dancetl6:

Ongoing Build (31 Dec 2013) - HMS BELLEROPHON (1786), POF scratch build, scale 1:64, 74 gun 3rd rate Man of War, Arrogant Class

Member of the Model Shipwrights of Niagara, Niagara Region, Ontario, Canada (2016), and the Nautical Research Guild (since 2014)

Associate member of the Nautical Research and Model Ship Society (2021)

Offshore member of The Society of Model Shipwrights (2021)

Link to comment
Share on other sites

Installation of the foreyard to fore mast

Following on from yesterday's post today I was able to install the foreyard to the foremast.

 

Before fitting the foreyard, and as can be seen in the next photo, I was able to redo the truss pendants so their respective thimbles were correctly positioned, as indicated by the yellow arrow. I then applied glue to the foreyard locating pin before it was added to the fore mast.

I-1352.thumb.JPG.7ddddbfd52f382762c12c99d4fe96fbd.JPG

Slings

On a real ship once the foreyard has been raised to the required height it is held in place with a sling arrangement. A loop is wrapped around the central point of the foreyard with a thimble on the free end. A second longer loop is wrapped around the mast cap with a thimble on the free end. The two thimbles are then linked together. In the next photo I have added the rigging between the two thimbles, as indicated by the yellow arrow.

I-1353.thumb.JPG.6acdcdcf8549ee950a54ca75b973554a.JPG

Jeers

Operationally the foreyard is hoisted up the foreyard using the jeers. Two double blocks are located on the foreyard, each situated either side of the foremast. Two more triple blocks are seized to the figure of 8 wrapping around the foremast (above the platform) and they hang down, so they are positioned below the platform but above the foreyard position. The rigging between these blocks then allows the yard to be lifted up in position. In the photo below I have added the inter-block rigging, as indicated by the yellow arrow. The free end(s) are ready to be belayed to the deck using a block and tackle arrangement.

I-1354.thumb.JPG.60648489ab6c27cdaa72f6c0b170f391.JPG

Truss Pendants

Once the yard has been hoisted, using the jeer block and tackles, and held in place with the sling, truss pendant are used to keep the yard in place with the mast. There are two truss pendant, located either side of the fore mast. Each truss pendant is looped around the foreyard and has a thimble. With the foreyard in position the each end of the truss pendants are placed behind the mast and is then feed through the other truss pendants thimble before they are belayed to the deck via a block and tackle arrangement. In the photo below you can seen one of the truss pendants has been fed through the other truss pendants thimble and is ready to be belayed via the block and tackle (yellow arrow).

I-1355.thumb.JPG.5a0937eb13e0c3b22af58231f1e097cd.JPG

 Nave Line

The nave line holds the truss pendants in place. A 3mm single block is located on the underside of the platform, centrally on the rear crosstree. The thread that passes through this block has a thimble on one end and the other end is belayed to the deck. A separate length of thread is passed through the thimble and each end of this thread has a thimble. Each truss pendant is fed through their respective nave thimbles, noting this has to be done before the truss pendants are fed through their respective thimbles of the foreyard. The nave line arrangement is shown in the next photo, noting the free end has not been belayed.

I-1356.thumb.JPG.1a1f0cf8e5d998e3f9a98b5e0a98cffb.JPG

To conclude this post I have added a couple of photo's of the Indy with the foreyard in place.

I-1350.thumb.JPG.0c9cc1b32b59b17de6e5ad506f0b7506.JPGI-1351.thumb.JPG.9cc1adfbe6c90229301f7ef552a3f2d9.JPG

Glenn (UK)

Link to comment
Share on other sites

Belaying Foremast Jeers, Nave Line and Jeers

I spent some time looking at plan sheets 15 to 19 to check the various belaying points for the foremast rigging.  With reference to the Fore Mast (Aft) aka Main Topbowline Belay Pin Rack I ended up allocating the belaying assignments as shown in the photo below, noting I included the plan sheet belaying reference as an aide memoir.

I-1357.thumb.JPG.77936828cf2df914ae6f1b70cb9e45e6.JPG

I did note in Longridge's book the inner tricing line is shown belayed to one of the shroud cleats, so I might revert to that option when I get round to adding that rigging.

 

The next photo shows the Nave Line which is linked to the truss pendents and then dropped down to the deck via a single block attached to the rear of the fore platform.

I-1358.thumb.JPG.21a640f17c5667698d4f9830b93f300e.JPG

The next photo shows the jeer blocks and sling

I-1359.thumb.JPG.c32985a871aae6dde9aa0ccc0ea539c7.JPG

The next photo shows the fore mast (aft) belaying rack, after the various rigging ends had been belayed. The unused belaying points will be used for the inner tricing line and the outer & mid main course bunt lines.

I-1360.thumb.JPG.48d23dd746b195fae00993bbb44c6158.JPG

The next two photos shows the truss pendants double block belaying arrangement.

I-1361.thumb.JPG.d409f3259e88efeb41cb6d116c29e170.JPG

In the next photo the jeer can also be seen being fed through the lower left hole in the bitt pin.

I-1362.thumb.JPG.59c8d6c638a347384c2efc82a0d7f105.JPG

Glenn (UK)

Link to comment
Share on other sites

Foremast Crows Feet Rigging

Over the last couple of days I have been working on adding the crows feet rigging to the foremast.

 

The first task was to add a 2mm single block to the top forestay.

I-1363.thumb.JPG.f92f17d02475a53f1bcf8f268a5b3809.JPG

The next task was to add another 2mm single block to the euphroe.

I-1364.thumb.JPG.97b094d384559c0bf12a589c27a560f1.JPG

Next up was to rig the two blocks. I found it useful to use a clamp to hold the euphroe whilst adding the inter-block rigging.

I-1365.thumb.JPG.e42c4a4ab207132d77d4e6765ca4cc88.JPG

Before I started to add the crows feet rigging I did map out the required path. I also calculated the required length of thread. I opted for a generous 2.2m length but in the end a length of 1.8m would have been sufficient.

I-1366.thumb.JPG.cb6bc48d31c49d3704d98472700f0b5a.JPG

It was then a case of following the required path as the rigging was added. I have added a few photo's taken of the work in progress.

I-1367.thumb.JPG.14ae374fdb487b45c4b618b67204d1e1.JPGI-1368.thumb.JPG.04e1bf90466e9a96241f1f6a885b543f.JPGI-1369.thumb.JPG.ffd7ec745ec8951e7f66b7759668d2a8.JPGI-1370.thumb.JPG.4d97e25ad6679e32e20dc7835e7d50b0.JPG

The rigging is now complete and the free end is ready to be tied off. once I have adjusted the required and applied some tension.

I-1371.thumb.JPG.83889f4bb7a84fd6238ce86af7b79ed6.JPG

I used a slip knot to secure the free end. The crows feet rigging is now complete.

I-1373.thumb.JPG.17c77a897b2ea5da20117909d65dc567.JPGI-1372.thumb.JPG.3e56a5d5fab8ceab534bb631d76457bb.JPG

 

 

Glenn (UK)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...