Jump to content

Glenn-UK

Members
  • Posts

    2,640
  • Joined

  • Last visited

Everything posted by Glenn-UK

  1. 032 - Shroud Line Deadeyes I have now added the deadeyes to the various shrouds. All that is left to do, before I start work on the ratlines, is to adjust the tension of the shrouds and to then seize the free end of lanyards around the shroud deadeye.
  2. 031 - Starting To Rig The Shrouds With the main and mizzen sail added to their respective masts and gaffs it now was time to start adding the shroud lines. I have a jig which I use to set the distance between the deadeyes. I have set the distance to 15mm. In the photo below I have positioned the jig, ready for first shroud deadeye. The next photo is a slightly different angle and shows both deadeyes in place on the jig. I take then shroud line and wrap in around the deadeye to get an approx. position for the shroud deadeye. I then position the shroud line in the quad hands ready to add the seizing to make the deadeye loop. With the seizing added the loop can be pull tight around the deadeye. Using the jig as a guide it is possible to adjust the position of the deadeye ion the shroud so its set to the correct distance, as shown below. With the position of the deadeye set I can complete adding the seizing, once again using the quad hands. The process is then repeated for the next shroud line. I then added the lanyard rigging to double check the alignment of the first two deadeyes. They seem to be level which mean the process worked well. When reviewing the photo below I am a bit disappointed with the upper seizing on the right-hand shroud line. I might remove and redo it.
  3. Many thanks Craig. I am pleased with how this has turned out. I now have to repeat the process for the mizzen sail which is attached to both the mizzen mast and mizzen gaff.
  4. 030 - Main Sail I have never added sails to any of my previous builds, so this was going to be a new experience and skill set to master. I decided the first task would be to check that sail rings fitting on the main mast. The main mast did require a very light sand before the sail rings would slide freely up and down the mast. I had no real idea what I should do with regards to adding the main sail, noting it needed to be secured to both the main mast and main gaff. I ended up starting by adding the main mast sail rings. After a bit of measuring, I calculated a spacing of 13mm between each sail ring was necessary. In the photo below the first sail ring has been added and the thread required for the next sail ring has been added. Working methodically, I was making good progress with adding the main sail rings. Once the final sail ring had been fitted it was then time to check the main sail could be positioned on the main mast. Now that I was happy with how the main sail could be positioned up and down the main mast, I turned my attention to adding the main gaff to the sail. I found this to be slightly trickier than adding the sail rings. With a couple of threads added I did a quick check with the gaff positioned on the main mast. I was happy with the work so far and after a short while the task was complete, and another fitting was undertaken. The sail maybe needs to be a bit higher on the main mast, so the sail clears the deck fittings.
  5. 029 - Colouring The Sail Set I have read a few posts regarding adding colour to the sails and it seemed to me to be a bit of a minefield with regards to getting an acceptable colour. I bought some RIT dye power - cocoa brown. I used a large plastic sandwich box and filled it with hot water. I then added a teaspoon of salt and a teaspoon of dye powder and gave it a good stir. I then placed the end of a piece of kitchen roll in the solution and the colour looked Ok. I then went ahead and immersed the sail set and left it to soak for around 5 minutes, occasionally stirring the dye around the sail set. The sail set was then left to dry out on some kitchen roll, and to me eye the colour looks OK. They do look a bit creased. Using a steam iron, the creases were soon removed. Next up I will add the main and mizzen sails to their respective masts and gaffs.
  6. I could not imagine rigging without using my quad hands. Your deadeye seizing looks very neat and tidy.
  7. 028 Channels and Shrouds It took next to no time to add the deadeyes to the strops and to then secure them to the hull. I opted to use some of my spare 3mm pear deadeyes for the Erycina. At the moment all the deadeyes are correctly aligned with two holes at the top and one hole centrally at the bottom. The next build task is to dye and then to add the main sail to the main mast and main gaff and the mizzen sail to the mizzen mast and mizzen gaff. I am unable to do this as the sail set I've ordered has not arrived. I am expecting the sail set to arrive later this week, given the current situation with the UK postal service strikes. Therefore, I decided to start making the shroud lines. Starting with the main shrouds I measured a 40cm length of 0.75mm black thread and then clamped the central point of this thread in my quad hands, as shown in the photo below. I used another quad hand to keep some tension in the thread so I could add the seizing. I added the seizing with 0.25mm black thread using 12 half-hitch knots, 6 on the bottom and 6 on the top. In the next photo I have added the first bottom half-hitch and I am in the process of adding the first top half-hitch knot. In the following picture I am in the process of adding the 4th bottom half-hitch knot. In the next photo I have completed adding the 12 off half-hitch knots. A touch of ca had been applied to the final half-hitch knot and the excess thread has been trimmed. In the final photo the shroud pair had been passed over the top of the main mast and the seizing has been closed up. This was accomplished by pulling the two shroud lines in opposite directions. This shroud line can now be removed from the main mast and will be put to one side. It can then be added once the main sail has been added to the main mast and main gaff. I will not be working in the shipyard tomorrow as my wife and I are having a day out in Castleford, visiting my wifes sister, who recently lost her husband.
  8. 027 - Adding Blocks to Main and Mizzen Mast There were a number of blocks required to be added to the mizzen and main masts. The work is now complete. The mizzen mast The main mast items are shown in position but have not been glued in place. These will be secured in place after I have added the shrouds to the main mast. When adding these blocks to the mast iron work I used the same technique that I used to secure a block to an eye bolt. A length of 0.25mm black thread is wrapped around the block and then seized with 0.1mm black thread. One of the two free ends is trimmed, and the remaining thread end is then fed through the hole on the iron work part and is then clamped to the side of the block. The first picture shows this arrangement with my quad hands set up. I am using some reverse tweezers to hold the ironwork in the correct alignment with the block. The next photo is a close up that shows the iron work part and block with the thread clamped in place. It is now ready to have the seizing to be added, using 0.1mm black thread. The completed block and iron work part. My next task will be adding the deadeyes to the strops and then adding them to the main and mizzen channels.
  9. 026 - Adding Blocks Part 3 Main Gaff In my previous post I detailed a method of adding a simplified thimble to the bottom of a block which was required for the mizzen gaff. The main gaff requires two such blocks. I decided I should add a proper thimble to the bottom of the main gaff blocks. After checking the rigging thread would pass through the 3mm single block holes I wrapped a length of 0.25mm black thread around the first block and seized it with 0.1mm black thread. The seizing comprised 4 half-hitch knots, 2 on the bottom and two on the top. I then trimmed one of the free ends. As can be seen in the photo below after the free end was trimmed the seizing was not correctly seated in the slots. This was corrected. The remaining free end was then clamped to the side of the block to create the thimble loop. It is better to make the loop on the large size at this stage as it will be closed up later on in the process. Using 0.1mm black thread 4 more half-hitch knots were added, 2 on the bottom and 2 on the top. I then placed a needle in the created thimble and the free thread end was pulled which closed the thimble up around the needle. The resultant blocks are shown below. Using 0.25mm natural thread the two blocks were then secured to the main gaff using clove hitch knots. The blocks are free to move along the thread and their position will be set during the rigging process. I have now added all the blocks to the mizzen and main booms and gaffs.
  10. 025 - Adding Block to Mizzen Gaff There is an interesting 3mm single block to be added to the mizzen gaff as can be seen in the following photo. After a bit of thinking I decided on a method to install this block on the mizzen gaff which is detailed in this post. The 3mm block is secured to the mizzen gaff in two places, using 0.25mm natural thread which is passed through a thimble on the bottom of the block. Scaling up from the plan sheet I calculated the short length of the 0.25mm natural thread as 8mm and the longer thread length as 14mm. As with all blocks my first task is to check the rigging thread will pass through the block holes. If the rigging thread (0.1mm natural thread for this block) does not I will run a micro drill through the holes. I have found it better, especially for the smaller blocks, to run a micro drill through the block holes after the seizing has been added. The test rigging thread passed through the block so there was no need to enlarge the block holes. I started by seizing some 0.25mm black thread to the block, with the seizing thread being 0.1mm black. The seizing comprised 4 half-hitch knots, 2 on the bottom and 2 on the top. Before the seizing is closed up to the block a length of 0.25 natural thread is placed in the gap as can be seed in the photo below. With the 0.25mm natural thread in place the seizing was pulled up tight to the block. The natural thread can still be slide back and forth as required. It is a simplified version of a block with a thimble. Once again, I am using a clove hotch knot to secure the block to the mizzen gaff. A touch of ca will be applied to the knot. I will also add a little bit of ca to the back of the two cleats before the thread is pushed up against them. The first clove hitch knot has been tied in the photo below, but I have not added the ca as yet. The other end of the 0.25mm natural thread was secured to the mizzen gaff with a clove hitch knot. The block was roughly positioned so there was approx. 8mm on the short length and approx. 14mm on the long length. With the positioning set the clove hitch knot was tightened up and secured with ca. The block is still free to move on over the natural thread which should enable the thread to be set to the right angle when the block rigging is added.
  11. Many thanks, I love my quad hands. I picked up the alternate half hitch seizing method from a post on one of @DelF build logs.
  12. 024 - Adding Thimbles and Blocks Part 1 I have detailed methods for seizing and securing thimbles and blocks to masts and yards in some of my previous build logs. To make things simpler I thought it would be better detail some of the methods I use as I add the blocks and thimbles on this build log. The one item which, in my opinion, is a must have for rigging is the quad hands. These are ideal for holding the blocks and thread in place so the seizing can be added. Bowsprit There are two thimbles to be fitted to the end of the bowsprit. The plan sheet indicates that these thimbles should be secured to bowsprit with 0.1mm black thread. I have opted to use 0.25mm black thread. I would have preferred to use fly-tying thread for the seizing as I think it yields a better end result. As I am currently out of stock of fly-tying thread, I decided to use the slightly thicker 0.1mm black thread for the seizing. With the thimble placed in one of the quad hands I cut a length of 0.25mm black thread and wrapped it around the thimble and then placed the two free ends of the thread in one of the other quad hands. The technique I use to add the seizing is to tie a series of half-hitch knots. These knots alternate between the bottom and top. In the picture below I have started to add a half-hitch knot to the top. For the thimbles I added a total of 8 half-hitch knots, 4 to the bottom and 4 to the top. A touch of ca is applied to the final top knot. The two free ends are then released from the quad hands and are pulled in opposite directions which pushes the seizing right up to the thimble. As I will use a clove hitch knot to secure each thimble to the bowsprit therefore one of the free ends needs to be trimmed. After trimming I applied a touch of ca to the cut end to ensure it stays in place. One of the completed thimbles is shown below. Using the clove hitch knots the thimbles were secured to the bowsprit, making sure they were correctly orientated. Mizzen Boom There is one 4mm double block to be added to the mizzen boom. It is an interesting block to seize because it requires a thimble on the bottom of the block as can be seen from the plan sheet. The block will be rigged with 0.1mm natural thread. I like to check the thread will pass through the block before it is rigged, as can be seen below. To start the seizing, I took a length of 0.25mm black thread. A loop was formed and the thread in then held in two quad hands, as shown below. Using alternate bottom and top half-hitch I created the thimble loop. I placed a thin piece of wire in the loop and then pulled the two free ends of the thread in opposite direction to close the loop up around the wire to create the thimble. The 4mm block was then placed in one of the quad hands and the thread was placed around it ensuring the thimble was correctly positioned. Using 0.1mm black thread the seizing was added using 12 half-hitch knots, 6 on the bottom and 6 on the top. With the seizing complete and pulled tight against the block it is now ready to be added to the mizzen boom. One of the free thread ends was trimmed and the block was secured to the mizzen boom using a clove hitch knot. As the knot was pulled tight, I ensure the block was set in the require orientation. I also checked the rigging thread would pass through the thimble Mizzen Gaff There is a 4mm double block secured to the mizzen gaff, via an eyebolt as shown on the plan sheet. I checked that the required rigging thread would pass through the block holes. A length of 0.25mm black thread was seized to the block using 0.1mm black thread with a series of bottom and top half-hitch knots. With the seizing pulled tight to the block one of the free thread ends was then trimmed. An eyebolt was then fed through the remaining thread end. The thread was then placed against the side of the block and held in place with my reverse action tweezers. This is shown in the photo below. Using 0.1mm black thread and a series of alternate bottom and top half-hitch knots another layer of seizing was added. The excess thread ends were trimmed, and the eyebolt was then test fitted to the end of the mizzen gaff, making sure the block was in the correct alignment. The eyebolt will require a bit of trim as it currently poking out of the other side of the mizzen gaff.
  13. 023 - Masts, Bowsprit, Gaffs and Booms I have completed shaping the all the masts, bowsprit, gaffs and booms. The masts and bowsprit have been test fitted as can be seen in the first two photos below. There is a bit more work required before these are finally positioned and secured in place. The opening on the bulwark did require sanding before the bowsprit could be slotted in place. I have also dry fitted the deck ironwork. The main and mizzen mast bases have not been fitted as yet. The ironwork has been test fitted on top of the main mast, a couple of the items can be seen in the photo below. The booms and gaffs have been shaped, the iron work has been test fitted and the cleats glued in place. I am now going to have a fun few days seizing and adding the various blocks to the masts, bowsprit, gaffs and booms. I am using some of my spare pear blocks rather than the kit supplied blocks. I'm also going to spend some time looking over the rigging plans so I can fully understand the various steps. On first glace the rigging associated with the double block fitted in the Main Sheet Chock box looks a bit tricky. The block does rotate which hopefully will make task a bit easier. I have ordered the Erycina deluxe, pre-sewn sail set from Vanguard Models. This is going to be a new challenge as I have not added sails to any of my previous models. I have also ordered some RIT dye power, cocoa brown to colour the sails. I have no experience with dying fabric so again will be another new challenge. I plan to use the free sail set provided with the kit to experiment with the dying process.
  14. Hi Craig I am also building Saucy Jack as a background task, which is ready for the first planking. These two fishing boats are a stop gap project after I completed the Sphinx and before the release of the Indy, which will be my next major project. I built the Alert as a stop gap project after I completed the Duchess of Kingston before the release of the Sphinx.
  15. 022 - Adding The Deck Items I painted the gunwales black and then fitted them to the top of the bulwarks. I also painted the upper rear section of the stern area black. With the gunwales glued in place I am now ready to add the previously assembled deck items. The various deck items were then added to the deck. And now a few close ups of the various deck items. You will note I have not fitted the various eyebolts, belaying pins or cleats. I normally like to fit these once I have studied the rigging plans as I have found that it is sometimes easier to seize some of the rigging to the eyebolts before they are fitted. Tomorrow, I plan to start work on the masts, yards and bowsprit.
  16. 005 - Adding the bulwark patterns I am not making too much progress on this build at the moment as I am pressing on with the Erycina build. All I have done to the Saucy jack is to add the two bulwark patterns. I did soak and bend the patterns to shape before gluing in place. I think this was a mistake as I did end up with some unwanted curling of the patterns. Thankfully I was able to correct this. The Saucy Jack is now ready and waiting for the first layer of planking.
  17. 021 - Hull Painted, Decals and Rudder I have now completed painting the hull. I have also added the decals and rudder assembly. As can be seen with the close-up photo's there are one or two very small areas where the lines are not clean, mainly around the stern area. For the most part the finished paint job is to an acceptable standard and is more than good enough for me and my low standards. When adding the rudder straps to the rudder post one strap was not positioned as it should be, as shown in the photo below. I could release the part and reposition but, based on past experience, this may damage the paint. It will be left as is. The unclean painted lines are also noticeable with this close up photo. When looking at the rear of the Erycina, the back of the left-hand middle stern frame can be seen. I will just give it a couple coats of paint and I suspect I will be the only person to know about it. The misalignment of the left-hand side upper rudder post strap is also very noticeable in this photo.
  18. I was not intending to do as much work on the Saucy Jack, but the painting phase of the Erycina means I have some free time at the moment. Also having plenty of free time is one of the joys of retirement, although my wife and I are looking after our youngest Grandson (18months old) so there will be little or no shipyard time this weekend.
  19. I agree, taking good photos of the rigging is very hard to do. I normally end up rejecting the vast majority of rigging photos I take.
  20. 004 - Hull Fairing With the stern counter frame and frame patterns (lower, middle and upper) fitted I spent some time fairing the hull, using a mixture of florey sanding sticks, 120 grit sandpaper and my Amati sanding block. I am reasonably happy with how the hull looks. I will now spend some time checking how various planks will lay to make certain the fairing process is complete, especially around the stern area.
×
×
  • Create New...