Jump to content

San Ildefonso by gsxdent59 - OcCre - 1/70


Recommended Posts

  • 2 months later...
  • 1 month later...

Now i have put in place the stays,long threads from top of the mast to the free deadeyes, after i use most of them with the shrouds. There are 11 threads for the three masts for left side and another 11 threads for right side. I use thread 0.50 mm brown. Now all deadeyes are occupied.Is time now to put in place the yards that i have allready finish. Starting with the lower yard of foremast, put in place for each one, all the threads 0.15mm that the manual show.

1725785977697.jpg

1725785977687.jpg

1725785977689.jpg

1725785977691.jpg

1725785977692.jpg

1725785977694.jpg

1725785977695.jpg

Link to comment
Share on other sites

  • 1 month later...

All the yards from the fore mast are in place permanent with all threads that they need. Now the work around the model is more difficult, because  i can damage the yards working with other threads. I must be carefull with my arms. Now we proceed to make the same job in the main mast

 

IMG_20241013_184957.jpg

IMG_20241013_184855.jpg

IMG_20241013_184905.jpg

IMG_20241013_184910.jpg

IMG_20241013_184914.jpg

IMG_20241013_184918.jpg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...