Jump to content

Recommended Posts

Posted
2 hours ago, Backer said:

It took a while for my poor mind to understand all this 😉
Ingenious system, a nice tool

Indeed a nice tool, Patrick. All credit goes to Mr Orsel, it took also a while for my poor mind to understand it on the Marine & Modélisme d'Arsenal forum.

Posted

I'm afraid it is getting a bit monotonous, but also this week I can show nothing but pictures of the planks. From now on I alternately place a plank at the top and one at the bottom.
121.thumb.JPG.65eeafc49abfa6094712c4130e27cd7b.JPG

 

122.thumb.JPG.baccb9c62584eb206fae333c0d9ae47b.JPG

 

123.thumb.JPG.111f0d579ba5540aaf401cdea42d8b68.JPG

 

124.thumb.JPG.62cb8753162950a382c0acfc78ab4b30.JPG

 

125.thumb.JPG.0c498230f987d1139da9a1a232d8e20a.JPG
I hope to close the gap in my next post.

 

Thank you very much for reading this log, for your likes and for all your interesting reactions.

 

Till next week!

Posted

Only one more strake to place.
126.thumb.JPG.9b235cb6fcc90113931afdae1d856d72.JPG
The last one will probably be the hardest one because this one has to fit at both sides. No need to calculate any more, I can measure the width immediately between the two planks.
127.thumb.JPG.a19e2c757c77ee2e663d909490bcd1fd.JPG
The last plank fits surprisingly well.
128.thumb.JPG.87fffa338e5c5deba852d32136576941.JPG
Time to tackle the portside.
I don't know if you remember that I intend to place only a couple strakes at the port side to give an clear view of the inside of the hull after the example of the model of Mr. Orsel.
I start with the strake just below the wale.
129.thumb.JPG.d3b7fe2cf50fdd6b586146809d559a28.JPG
Now I divide the space between the two extreme strakes by three and that gives me the location of the only two planks which will be added.
130.thumb.JPG.09a12ca08baba4ba0f47e8db6faadec6.JPG

 

131.thumb.JPG.fe18899c6884f4f4df40acca2d06e56f.JPG
Planking is completed:132.thumb.JPG.45b56664d2ac2afd37f435ef4836af40.JPG

 

133.thumb.JPG.c6bc19e6007ac27507cffbc73ad632b2.JPG

 

Thank you very much for reading this log, for your likes and for all your encouraging reactions.

 

Till next week!

Posted

Just found this build G.L. and I have read it from the beginning.  Like your previous logs, it is packed with simple and innovative techniques.  The bow sander makes so much sense and I'm surprised I haven't seen that idea used before, but I will be trying it.   I also like your frame lamination method - nifty.  And thanks for showing us the details of  Mr. Orsel's strake cutting sled which is a perfect tool for hulls of this shape.

 

Excellent work G.L. and I will be watching for future updates.

 

Gary

Current Build   Pelican Eastern-Rig Dragger  

 

Completed Scratch Builds

Rangeley Guide Boat   New England Stonington Dragger   1940 Auto Repair Shop   Mack FK Shadowbox    

 

Posted

Congratulations GL, fantastic work.

This last plank on the starboard side, this was no easy task. It is much easier to fit planks as you go with no limitation on the one edge rather than making a plank to fit a gap. Very well done!

Posted
On 6/20/2021 at 3:56 PM, FriedClams said:

Just found this build G.L. and I have read it from the beginning.  Like your previous logs, it is packed with simple and innovative techniques.  The bow sander makes so much sense and I'm surprised I haven't seen that idea used before, but I will be trying it.   I also like your frame lamination method - nifty.  And thanks for showing us the details of  Mr. Orsel's strake cutting sled which is a perfect tool for hulls of this shape.

 

Excellent work G.L. and I will be watching for future updates.

 

Gary

Welcome on this log, Gary and thank you for your compliments.

 

On 6/20/2021 at 7:08 PM, vaddoc said:

Congratulations GL, fantastic work.

This last plank on the starboard side, this was no easy task. It is much easier to fit planks as you go with no limitation on the one edge rather than making a plank to fit a gap. Very well done!

 Thanks, Vaddoc.

Posted

The hull can now be removed from the building board. Better to say the building board can now be dismantled from below the hull.
134.thumb.JPG.cb9dc330281472cc7a2ab62280ae8a71.JPG
It is feather light.
135.thumb.JPG.123f8c196e474d589d7de541bfd1e342.JPG

 

136.thumb.JPG.c68d26ebe59c93ad19f5f5a7b9df16d3.JPG

 

137.thumb.JPG.851aba05a5f47fcb74e1821b8bf431e1.JPG
The hull, sitting in its new chair:
138.thumb.JPG.8e71ac28e29d420365855c97ce77250d.JPG


139.thumb.JPG.e16fc2849afdfdc31a7bb20bee8170cb.JPG

 

140.thumb.JPG.cf369a604b2002144d45cf903c4d5303.JPG

141.thumb.JPG.6eb8e570f14642694db2c682ae95beeb.JPG

 

Posted (edited)

8. Floor timbers
The hull is now liberated from the building board, the inside is free accessible to work in it.  This week I am making the floor timbers.
The floor timbers are not only reinforcements for the hull, but most of them are also the base for the bottom boards. That means that their bottom must have as much as possible the shape of the inside of the hull and that the top of those on which will lay the bottom boards must be at equal and correct height to form stabile base for the boards.

To determine the inside shape of the hull where the floor timbers will be placed, I use a piece of thick solder.
142.thumb.JPG.46ffb74894d270bf938e11cad0d42b60.JPG
That can be pressed in hollow shape of the hull.
143.thumb.JPG.5da142c3066a3312483444ac339176f0.JPG
I trace the shape onto stiff paper for both sides and cut them out. I glue them together with another piece of stiff paper just on top of the keelson (red marking, I was a bit lazy in making pictures). A vertical lath, attached to a horizontal lath which can be moved along the hull at a constant height helps to determine the height of the floor timber.
144.JPG.78923a100db116dd7d6aafc7f33a5bd5.JPG
The floor timber can now be sawn ...
145.thumb.JPG.6f276de539a31253148fdcf5e97dd52b.JPG
... fitted and glued.
146.thumb.JPG.c40fec83a9139376b59b3f04dd5d47f3.JPG

 

All floor timbers placed.
147.thumb.JPG.b14194c90d3cc3072b713d69aeef5818.JPG

 

Thank you very much for reading this log, for your likes and for all your kind reactions.

 

Till next week!

 

Edited by G.L.
Posted

This week, I varnished the hull. It took a week to do so because I had to give five or six layers before I was happy with the result. Between every layer the  hull was sanded with fine sand paper.
147a.thumb.JPG.2a32e51a3a3b9da854e116d310054faf.JPG
Sanded between two varnishes.
148.thumb.JPG.8468d7a09ca39cd4c1ba2b808bbc7b10.JPG
A new layer laid.
149.thumb.JPG.faa0124db26a12c3fd37684b50784b99.JPG

 

150.thumb.JPG.2ae2f72a6564f3bb594cf570d2d9a854.JPG

 

151.thumb.JPG.fbb05fb333e74aa00b3c03b9b51b3085.JPG

 

152.thumb.JPG.b2f9750524fbc4e19be2c2099f152e34.JPG

 

153.thumb.JPG.03e24faa4a9b7f0520539b64d8885577.JPG
It is always a bit dark in the workshop, therefore some pictures in the living room where the light is better.
154.thumb.JPG.4ac507952cd8e9293c0d2138021622f4.JPG

 

155.thumb.JPG.93b6ec2be39c9f6fd4e9a22be559b097.JPG

 

Thank you very much for reading this log and for your likes.

 

Till next week!

Posted
On 7/3/2021 at 6:57 PM, Roger Pellett said:

A great job on a difficult subject with those tiny frames.

 

Roger

 

On 7/4/2021 at 8:23 AM, Backer said:

Very nice work 👍

 

7 hours ago, GrandpaPhil said:

Very cool model!  Very nicely done!

 

Thank very much for your kind comments, Roger, Patrick and Phil

Posted (edited)

9. Centerboard Case and Centerboard
The centerboard case is built on two beams with a recess for side boards at each side.
156.thumb.JPG.adffe5aa2e680a8a7acfab7a2dd247f0.JPG
When the side boards are glued, it can be fitted in the hull.
157.thumb.JPG.a262f8352f5f1698bafd5f9cca615220.JPG
Now the case fits, the cover plate can be glued.
158.thumb.JPG.de891a62c031526287e2eca5b0422c5a.JPG
At this stage I don't glue the centerboard case into place yet.
The center board is sawn from an 1.5 mm aluminum plate.
159.thumb.JPG.cec0ef2601b3b646729b46b7d85a64ac.JPG

 

160.thumb.JPG.5b6aaf14d1099a613f1eb1676c7d0312.JPG
Fitting the board and checking if it can be lowered and hauled smoothly.
161.thumb.JPG.98d47b887cec5a5012b9a6bb1012bc09.JPG

 

162.thumb.JPG.a2cf52db284b1a12f5e4450412b81653.JPG
The centerboard is painted in black. I use a cardboard box as a spray booth (the centerboard is hanging in it on a metal wire. A bit hard to see on the photo).
163.thumb.JPG.ade83a05f8d4bda5551f1be4e2f8d723.JPG

 

 

Edited by G.L.
Posted (edited)

10. Bottom boards
I start with gluing the stringer at the starboard side. At port side (the open side) the bottom boards will not be placed.
164.thumb.JPG.1a880f43705344cf7127fad274f09fc5.JPG
Starting to puzzle the bottom boards. The boards are still all loose, I use a weight to keep them in place during the measurement.
165.thumb.JPG.96291678dd5e74749d0226f0cfc93fd6.JPG
While making the bottom boards I glued the thwart risings already into place at both sides.
166.thumb.JPG.dced27d93016809207f5f3707e366a44.JPG
The boards are complete. The only have to be glued and the back still has to be cut straight.167.thumb.JPG.5fdaeae14d40069a7b34950323ed75a0.JPG

 

Thank you very much for reading this log, for your likes and for all your encouraging reactions.

 

Till next week!

Edited by G.L.
Posted

11. Thwart
The outsides of the thwart are laying on a rising. The risings are made of ebony.
168.thumb.JPG.5eecfce9ddf23f76aec2d70437e8a031.JPG
More to midship the thwart is supported by support beams.  The two front beams do not run the full width of the hull, but are interrupted in the middle. I leave them whole for the sake of working for now.
With the bottom boards (center board case removed):
169.thumb.JPG.eb9fe745c5128a69ebfd26ebe1ba92c4.JPG
Without the bottom boards:
170.thumb.JPG.608f3c914cd691212e9cd070ce0d2f79.JPG
The support beams rest on a strut. Making a template to saw the strut.
171.thumb.JPG.48e4534bca7e679aa6ef43adcdaf5d44.JPG
The forward struts placed provisionally.
172.thumb.JPG.b795c5724ffc4cf69b814671d627d45d.JPG
The rear support beam runs from side to side and is supported in the middle by a pillar. Turning the ebony pillar with the lathe.
173.thumb.JPG.72df86f5fd0d7c9e3b923e57ccde1cc7.JPG
The three support beams with pillar and struts. I repeat: the two forward beams will be interrupted in the middle.
174.thumb.JPG.db22e88eaa88b9d706a29ed7230c756c.JPG
The thwart will be made of mahogany, I make a template to saw it out. Determining the shape of the hull sides. First at one side:
175.thumb.JPG.096ce59d5ec3b998fb2668b75840c789.JPG

 

176.thumb.JPG.0de6c7410f6ce2e554762e3e54b4cdee.JPG

 

177.thumb.JPG.f33da9ec5aeaf80e83142257c79de7cd.JPG
then also the other side:
178.thumb.JPG.a76e94afa4a9779107bed2a817eab23c.JPG
I draw the shape of the thwart on the template with the help of an improvised light box.
179.thumb.JPG.0da6c1a6202ad513afb78e5b06a825ae.JPG
Here the thwart is glued and sawn. Fitting it.
180.thumb.JPG.ed7ac61d9e648acb62360f15e705d276.JPG
I want to finish the curved inside of the thwart with a thin frame. To give the frame its curved shape, I make an improvised bending iron. I secure a can on the workbench and aim the paint burner in the can. The wet frame can now easily be bent round the can into the desired shape in two directions.
181.JPG.9e647269e1677c01d68aa68efd29a86c.JPG

 

182.JPG.b4863967d072c49d8449413b8cb6e7fd.JPG
The frame is now glued in place on the thwart.
183.thumb.JPG.136be7ae749792db475edd1592a1ed4f.JPG
The center of the two front support beams is now cut away.
184.thumb.JPG.c04a0be429236c9ffbaad190fcadb097.JPG

 

185.thumb.JPG.682984e33e5fff169eceb2d10967edb1.JPG
Fitting the finished thwart. Nothing (neither bottom boards nor thwart) is glued yet.186.thumb.JPG.3a8651af4e6eedf8425c60a4808602bf.JPG

 

Thank you very much for reading this log and for for your likes.

Posted
Posted (edited)

12. Cockpit coaming.
The cockpit coaming has to be integrated in the deck beams. Before making it I will lay first the two adjacent deck beams. Therefore I have to glue the beam clamps first. I learned from my experience with the wales that bent ebony transmits great pressure to the model (post 43), so I do not make the deck clamp from ebony, but from cherry. I will stain it black later.

187.thumb.JPG.35dfc72683add29feecb7aad6a3dd40b.JPG

 

188.thumb.JPG.ca6bf244e5b185a210355fc79843a7d3.JPG
I saw the deck beams out of 3 mm thick ebony. They are sawn manually with the help of a paper template glued on the wood.
189.thumb.JPG.a41cf9721ffaa33189bc2d5340ee277d.JPG
The deck beams sit in notches in the beam clamps. The notches are sawn with a small metal saw blade. a piece of cardboard protects the thwart.
190.thumb.JPG.ca206df36732d2bb5632f2ae19175ce6.JPG

 

191.thumb.JPG.a0a54db24288e68b0ceb4c155848f1fd.JPG

 

192.thumb.JPG.8860b3a8cb4c701289d7f7828a11bd9a.JPG
The two deck beams bounding the cockpit coaming.
193.thumb.JPG.63a493d4370e7d30775aabc5898dba80.JPG
The cockpit coaming has an oval shape. It will be made by laminating three layers of mahogany veneer. I saw the laminating mold of a piece of waste wood.
194.thumb.JPG.67d66615cf0c8c8400b2e8760e845ba6.JPG
Presenting the mold on the model.
195.thumb.JPG.8e50296de494686f0164c3731a66217a.JPG
Gluing the three layers veneer.
196.thumb.JPG.a386b385182027b54046cd76b6393e05.JPG
When the glue is dry I saw out the coaming...
197.JPG.bdd9c486e9ad022bbd8929f74499ce18.JPG
... and I sand the edges.
198.thumb.JPG.3174348715d8b600d117c152414a8d5b.JPG
Round the bottom side of the cockpit coaming lays a round deck beam. It is also made by laminating four strips of veneer round the coaming.
199.thumb.JPG.13fd25004b4371207b34c67b5f6aa0fb.JPG
The beam will consist of two half rings. Here it is like it comes off the mold; it still has to be sanded, sawn to size and re-stained in black.200.thumb.JPG.026e2147424d0f3f1951209ae7e1e84a.JPG

Edited by G.L.
Posted

Fitting the coaming. In the beam round the coaming the dove tails notches for the deck beams are already made.
201.thumb.JPG.fa8974a57e0136fb38a4839ce1280a29.JPG
At the front of the coaming is a shelf that serves as a pin rail. Making the pin rail.
202.thumb.JPG.fa62fba268d7fe64faa40094c5ee83b2.JPG

 

203.thumb.JPG.5e15e11486f6041199a1a02960a893dd.JPG
In front of the pin rails there are passage holes through the coaming for the halyards and sheet. They are protected against scouring with a piece of brass pipe.
204.thumb.JPG.58b9ea354f0581fec7589e2ea8b7c842.JPG

 

205.thumb.JPG.b5a965baeccddbe6d16843665b6ae8ff.JPG
Gluing the pin rail.
206.thumb.JPG.91df148c601499b97f792056e6875d52.JPG
...and re-fitting the coaming.
207.thumb.JPG.44bb160d6ffeeb9428c66a065c45af23.JPG
Now the coaming can be varnished. Note that there are also two extra pin holders in the coaming. In the photo you can see the starboard one.208.thumb.JPG.cfaad05bce6a35ba3b34bbc040c5927a.JPG

 

Thank you very much for reading this log, for your likes and for your encouraging reactions.

 

Till next week!

Posted (edited)

I start this week with finishing the coaming area. The attachment points of the coaming to the deck beams are reinforced with knees.
209.JPG.653629c80c366b518f390a6706735b45.JPG
At each side of the coaming come five short deck beams. The notches for the dove tails of the beams were already cut before the round beam clamp was glued to the coaming.
210.JPG.2b4413323bf475badbf082e95dfb2a08.JPG
The coaming with the port beams glued.
211.JPG.367426805d812aae046b90405b820495.JPG
Fitting the coaming on the model. I will wait to glue it definitively until all deck beams with accessories are made.

212.JPG.cb70cb72eec7521c97d66f94f91ee913.JPG

Edited by G.L.
Posted (edited)

13. Mast tabernacle
There are many bridges across the Seine, which is why it is useful that the mast of the clipper can be lowered and raised again by the crew. This is done by means of a hoist system with three sheaves in the mast base and two shaves at the bottom of the hull of the boat.
213.JPG.920af9d4aa4f15ab2785d2ea57f77b89.JPG
Making the two sheaves for the fixed part.
214.thumb.JPG.87cc67edd7640dc5bb34020ba7c3dbbe.JPG
The different pieces.
215.thumb.JPG.11fd5f1ec139faeb0bffdb8f66f48c2e.JPG
Assembling the pieces.
216.thumb.JPG.71bcf4e021bc7bf4a539e8222ddd874a.JPG

 

217.thumb.JPG.c3680b48c5fad5feb404bfb085562ea8.JPG

 

218.thumb.JPG.a9d27a6f468595f09beeb321ac0a7001.JPG
Fitting it in the hull
219.thumb.JPG.574fb8f217986bd01a2d0bc4f92917f3.JPG

Edited by G.L.
Posted

14. Step of the mast and peripherals
Assembling the step of the mast. There are two pairs of holes running through the mast step (which now have nails through). The top holes are for the pivot spindle around which the mast can tilt, the bottom one for the pin to lock the mast.
220.thumb.JPG.c52a52ffce0ea8a8e491941362250def.JPG

 

221.thumb.JPG.3eee0267d5a273cd5a8668aed19b9dc1.JPG
Fitting the step of the mast. Now that the bottom nail has been removed, you can see that the holes for the spindles have been reinforced with a piece of brass tube.
222.thumb.JPG.2bcb039c422a8596e29daa39fcd57bb6.JPG
The step of the mast and the mast erecting sheaves. The center board case is taken away to give a clear view.
223.thumb.JPG.db72e5b7bf87107190723e5805c11998.JPG
Overview:224.thumb.JPG.21aad7f0cbb2641b25fba4fe0beae39e.JPG

Thank you very much for reading this log and for your likes .

 

Till next week!

Posted

Great progress GL!

 

The word tabernacle comes to mind for the "mast erection" part. I don't know if that is correct or not.

 

Cheers!

Happy modelling!

Håkan

__________________________________________

 

Current build: Atlantica by Wintergreen

Previous builds

Kågen by Wintergreen

Regina by Wintergreen

Sea of Galilee boat, first century, sort of...

Billing Boats Wasa

Gallery:

Kågen (Cog, kaeg) by Wintergreen - 1:30Billing Boats Regina - 1:30Billing Boats Dana

Posted

I think Håkan is right, the term 'tabernacle' also came to my mind. In other languages, e.g. German it is als called a 'mast-stool'.

 

Otherwise I silently follow the evolution of this project. I find the choice of dark wood a bit sombre, but really like what you are doing with it !

wefalck

 

panta rhei - Everything is in flux

 

 

M-et-M-72.jpg  Banner-AKHS-72.jpg  Banner-AAMM-72.jpg  ImagoOrbis-72.jpg
Posted
On 8/5/2021 at 9:01 AM, Wintergreen said:

Great progress GL!

 

The word tabernacle comes to mind for the "mast erection" part. I don't know if that is correct or not.

 

Cheers!

Thank you, Hakan. Tabernacle sounds indeed a lot better than my term. I will edit my log.

Posted
On 8/5/2021 at 9:50 AM, wefalck said:

I think Håkan is right, the term 'tabernacle' also came to my mind. In other languages, e.g. German it is als called a 'mast-stool'.

 

Otherwise I silently follow the evolution of this project. I find the choice of dark wood a bit sombre, but really like what you are doing with it !

 

On 8/6/2021 at 8:08 PM, FriedClams said:

Very nice progress G.L.

 

Gary

Eberhard and Gary, thank you very much for your interest and your complements.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...