Jump to content

Recommended Posts

Posted

Thank you so much Ian, means a lot coming from a long-time follower. Frequent breaks are mandatory working at this scale. The tackles are coming along pretty good, using 2.5mm double blocks on the runners that are led through an eye bolt and tied to a dead eye on the channels and 2.5mm single blocks hooked to eye bolts on the deck.

 

Michael D.

 

 

20250426_115940.jpg

20250426_115843.jpg

Posted

The fore stay is finally in place, the mouse is made up using 1/8" rod pared down to the appropriate size, visually anyways, this was done on the drill bit in the pin vase, the lanyard is rigged but not yet tied off, I'll let it sit for a few days before that, also the lower tackles are just about complete, thanks for looking.

 

Michael D.

 

 

20250427_135846.jpg

20250427_104309.jpg

20250427_135621.jpg

20250427_135729.jpg

20250427_140017.jpg

Posted

Thank you, Frank, nice to hear from you. I ended up redoing the knighthead for the main lower tie to a four sheave, I used .4mm line for the ties and top rope and .2mm for the fall, the rams head measures approximately 4.5mm, 30" at scale, also I needed to install the Mizen lower stay collar and fabricate a 1.70mm 5-hole dead eye, 9.75" at scale to check the clearance at the railing, next Ill fabricate the parral before finally gluing in the lower main mast. Thanks for looking.

 

Michael D.

20250503_115005.jpg

20250503_114823.jpg

20250503_113043.jpg

Posted

Good day Michael!

She is getting more beautiful and beautiful and buytiful  with each stage completed , Great Job You made !

I like it very much!

All The Best!

Kirill

Posted

Glad you like it thus far Kirill, good to hear from you. A few different phases going on in this update, glued in the main lower mast, turned a new main lower course yard, this measures out at 187.7mm, 103'-6" at scale, fabricated the parrel, the pendants of tackle are .40mm line served with 3mm single blocks and the falls are taken to the main deck close to the bulwarks using 2.5mm double and single blocks and finally rigged up the parrel rope and tackle using a 2mm double and single block, that's it for this retina straining update and thanks for looking.

 

Michael D.

 

 

20250510_123924.jpg

20250510_124014.jpg

20250510_124119.jpg

20250510_124750.jpg

Posted

The main pendant tackles are completed and started rigging the fore lanyards, trying to rig these correctly using a throat seizing is fiddly to say the least, I think they look okay. I'll only do a few per side before moving on to the main shrouds so I can then set the lower main stay in place before finishing up the fore lanyards. Thanks for looking.

 

Michael D.

 

 

20250513_193945.jpg

20250513_194129.jpg

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...