Jump to content

Recommended Posts

Posted
3 hours ago, Glenn-UK said:

I think the handle looks OK. Should I paint the quoin black, thoughts anyone?

I like the contrast of the black handle and bare wood of the quoin. However you are the captain in charge, so ignore me and go with what you think will suit best. Judging by your previous builds, whatever you choose to do will look great.

 

I am currently trying to figure out the fittings and sizes for my ships guns, so seeing the work you are doing with yours is proving really informative.

 

Regards

 

 

Geordie

 

Current build: HM Gun Brig Adder

 

Posted (edited)

Build Log - Day 12 (15th – 18th Nov 2025)

 

Task 31 – Second Planking Preparation

Before commencing with adding the planks there was a bit of background work required. I had decided to use a 4-butt shift pattern for the second planking. With reference to the information contained in Longridge's book Anatomy of Nelson's Ships I created the following plan contained in the attached pdf file.

001 4 Butt.pdf

 

This a sequence that repeats and works as follows:

a) First plank has been positioned with the reference bulkhead

b) The second plank start point is then 2 bulkheads to the right of the first plank.

c) The third plank start point is then 1 bulkhead to the left of the first plank.

d) The forth plank start point is then 1 bulkhead to the right of the first plank.

e) the firth plank start point is then 2 bulkheads to the left of the first plank.

f) Repeat the above sequence a) to e)

 

When looking at both @James H and @DelF build logs it appeared that the first three planks were not tapered around the bow. I test this out and concluded I could follow suit without any issues.

 

When looking at the kit supplied Lime planks there is quite a bit of colour variation between them. Therefore as I proceed to fit the planks I need to colour match the planks with the bulwark as far as it practical, noting this becomes less of an issue below the waterline as the hull will be painted white.

 

Task 32 – Adding the first plank

After selecting the first plank it is test fitted in the rabbet and a line is drawn so it follows the curve of the stem post.

 

Following the information provided by @Chuck lateral bending method I set about working out the central point of the U-shaped bend. The plank brushed with water and clamped. A hairdryer was then used to apply heat.

 

The first planking layer (right and left sides) was then glued to the hull.

 

Task 33 – Adding the next two planks

It was then a case of cutting planks to the required lengths for the 4-butt shift pattern and gluing them to the hull.

 

Task 34 – Garboard Plank

Noting that 24 planks / side would be required, and as 3 planks had already been fitted below the bulwark I thought it would make sense to add the garboard plank which would then leave 20 planks to fill the gap. This would make it easy to split this area into 4 planking bands, width 5 planks per band.

 

I took my time to get the required shape around both the the stem and stern post. I also worked out the required plank start positions for the 4-butt shift pattern, based on pattern created by first three planks.

 

Photos

In the photo below I an checking if three full width planks can be fitted around the bow, not colour matched.

002.thumb.JPG.8b9c9a9cd8f85dc54764e93fb22e11b8.JPGIn the next photo I am checking the colour match of first plank with the bulwark, it looks good.

003.thumb.JPG.8d0c5bd56228c9ff7da57720122aeef6.JPGThe next photo shows marking the plank for rabbet so it follows the curve of the stem post

004.thumb.JPG.8d340da0b32c6826e905eb2c35576841.JPG

The next photo shows the central lateral bend point, which is where the widest gap is

005.thumb.JPG.41213a66cbb465493c478698a103ebb2.JPGLateral bending of the first plank (left and right)

006.thumb.JPG.38e774c3a096c752b184cf084d5a20a3.JPG

First plank has now been fitted, and the 4-butt joints can be seen

007.thumb.JPG.94e0e8874e01e73fd505eb6b41c0671d.JPG008.thumb.JPG.ce5f355f0674da8a7313acc4a1a78c59.JPGChecking the second plank fits, also checking it is aligned with the required bulkhead line.

009.thumb.JPG.3ee0380f134fffb7fafa897563e5f2ec.JPG Cutting planks method. This tool give a nice shape cut. I do give the cut edges a very light sand.

010.thumb.JPG.2ee1f8e8a16b54943ae51cb014ee97aa.JPG

Second planking layer completed, I am using acetone and water to clean the planks to remove excess glue. The 4-butt pattern can be seen.

011.thumb.JPG.417f2e7e588cce40f391b60c69454a4b.JPGThird planking layer completed, so far so good.

012.thumb.JPG.2ce0a8b6d5e8f1331e983f796b588e9a.JPG Garboard plank - stem post

013.thumb.JPG.25c6a05f7cda0c88cd136cf491455a92.JPG

Garboard plank - Stern post

014.thumb.JPG.90be0599b0d055af96e2a1170d8f416d.JPG

Edited by Glenn-UK

Glenn (UK)

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   1 member

×
×
  • Create New...