Jump to content

Recommended Posts

Posted

Shocking! I just realized that I started this model in May 2010. Hmm, perhaps it is time to get her finished. 

Main things to finish are three more small boats, boat davits, stairs for the port side, fit the remaining boats and some other bits and pieces. 

I found the stairs quite tedious to make. I couldn't used the supplied stanchions as is so I cut of the top and soldered rails to the remaining piece - not easy to maintain the correct angle while trying to hold the pieces and solder at the same time. But I think they are acceptable - at least from a distance. 

I have uploaded some overall pictures of the model. It's not easy to get good pictures without a wide angle lens which I don't have. 

Have to start thinking about where to put her when she's done - that's going to be a head scratcher.

 

/Lars Peter

IMG_0603.JPG

IMG_0604.JPG

IMG_0605.JPG

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

Posted

WELCOME BACK, my long lost friend

  • 1 month later...
Posted

Rowing boat 4 of 4

I still have 3 small boats to finish for my AV. 2 small motor boats and 1 rowing boat. I started on one of the motor boats which is currently being painted. I'm currently waiting for some small disposable pipettes to arrive as I'm having trouble transferring paint from the small paint can to the airbrush. It just results in a big mess!

 

So I decided to finish the last rowing boats. It is a small plank on frame structure. Everything is glued with CA and accelerator to be able to secure the mahogany planks. The first picture shows the planking in progress. The boats is around 4 inches long. 

IMG_0653.thumb.JPG.c5de8f5964302d0c5a306c6f638c00e5.JPG

Once planked I did a rough sanding and covered everything with filler. The bottom will be painted. Once dry I sanded everything as smooth as possible with some 240 grit sand paper.

IMG_0655.thumb.JPG.d51be2b7fa26b51f882751b9363705a6.JPG

I covered the stern with mahogany strips and turned my attention to the inside. First job was to remove the top of the frames and approximately half of the keel. Access is limited so I decided to use my Proxxon drill with a diamond burr. It worked out great for removing the remaining plywood and CA residue.

IMG_0656.thumb.JPG.0d43124739c73dcc8c64aa690d043683.JPG

Next up is to cover the vertical parts of the frames with mahogany strips. I remember this as quite a fiddly task. 

 

To be continued ...

 

/Lars Peter

 

 

 

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

Posted

Work continues on the rowing boat. The inside of the boat is more or less done. The bottom of the hull has gotten a coat of mahogany stain as the 1x1 mm strips of mahogany were of a different color. Everything else has gotten a coat of satin varnish. I'm considering staining the bench seat in back also as the wood was of a lighter color. Is may not look like much but more than a 100 small pieces of mahogany have been used for the inside of the boat. 

IMG_0657.thumb.JPG.cb9009a5c73fd922d01222bf921d6572.JPGIMG_0662.thumb.JPG.6fc408098d91670c5337c81cc8b67d62.JPG

The first of the small motor boats has now been painted. There is quite a bit of bleed through of white paint I will have to remove. I will then stain it in some areas and give everything a coat of varnish. I broke the top of the rudder when I removed the masking tape. So I will have to do a bit of touch up here as well. The top of the rudder will also be painted black. Only thing remaining is to add the hardware.

IMG_0660.thumb.JPG.a5544a9b6a74f0721cecfd9a8360d376.JPGIMG_0661.thumb.JPG.18732fe67c07c269500ed3ef0f6d7d80.JPG

Only the last motor remains to be build which bring the total number of small boats for my AV up to 11.

 

/Lars Peter

 

 

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

Posted

Just a quick update.

 

I have completed the first small motor boat.

2101054533_2020-02-2718_56_05.thumb.jpg.1364e68a1af7f4fde3f65720540483ef.jpg

The next picture shows the size compared to one of the large motor boats already in place on my AV. It is simply a scaled down version.

1544651970_2020-02-2718_57_53.thumb.jpg.4aef718bcc96c8b633dfa06bc29ee263.jpg

The last rowing boat is waiting for paint and then I have one last small motor boat to make - almost done 😊

 

/Lars Peter

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

  • 2 weeks later...
Posted

Rigging small boats

I have started hanging the small boats from their davits, starting with the first rowing boat. This is time consuming work, took me around 3 hours for the first boat. A total of 8 blocks are needed per boat.

 

First picture shows the attachment of the line to carry the weight of the boat.

IMG_0676.thumb.JPG.6e6eb40369a6d810adaded3c3226afed.JPG

Next picture shows the two slings that will hold the boat to the davit.

IMG_0680.thumb.JPG.04f7a8b4f85da232004cbd6eca8078a2.JPG

The slings are tied to the davit.

IMG_0681.thumb.JPG.4c7b8c2103baa6c4c71b9387d44de5bf.JPG

Boat in place.

IMG_0682.thumb.JPG.5dca4a43a12dcdc94281cba8b1af5777.JPG

The last picture shows the blocks for for the slings. I'm not sure where the lines for these should be tied off so for now I just tied them to the railings.

IMG_0685.thumb.JPG.102aeac44ad4d26258c03d48f78808f8.JPG

Only 5 more to go 😩

 

/Lars Peter

 

 

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

  • 2 weeks later...
Posted

The starboard side of my AV is now more or less complete - just have to fit a few life preservers. 

The three small boats are in place in their davits and the stairs are complete.

 

IMG_0686.thumb.JPG.7c22f333bfa6205bc926cb90ec06a4fe.JPGIMG_0687.thumb.JPG.8b96b07ab80f3e60c490f7ffa032950e.JPG

Now I can start all over with the port side 😄

 

/Lars Peter

-------------------------------------------------------------------

Current build: Amerigo Vespucci 1:84 (Panart)

Current build: BB Mary Ann 1:33
Finished: BB Jylland 1:100
Finished: Church ship Danmark 1:75 (restoration project)

  • 1 year later...
Posted

sorry i missed the update, i have been so engrossed in my own AV project,  she looks great, lol perhaps i should have stuck to the original colours

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...