Jump to content

dunnock

NRG Member
  • Posts

    423
  • Joined

  • Last visited

Everything posted by dunnock

  1. Thanks everyone for all the likes and comments The Lower Yards. I began with the crossjack yard and worked forward. I used Steele’s tables to calculate the appropriate size of rope and referred to AotS, Lees and Petersson for the run of the ropes. The crossjack is pinned and glued to the mast with CA for ease of working. The truss pendant is 0.35 rope spliced around the yard on the starboard side of the mast. It leads through a thimble spliced to the yard on the port side and ends in a long tackle block. The fall is 0.25mm and a single 3mm block is hooked to an eyebolt on the deck and the business end tied of to a cleat on the mast. The slings are lashed together with 0.25mm rope wound through each thimble as many times as would comfortably fit and then frapped around the front of the wraps. It is too fiddly to tie off each end with a seizing so they are tied off with a half hitch and fixed with dilute pva. The lifts are next. A single 3mm block is tied to an eyebolt on the cap. The running part is tied to the block at the cap runs through the block on the yard, back up to to the block at the cap and is tied off at the foremost pin on the after belay rack. Main and fore courses have a truss pendants (0.6mm) each side of the yard which are spliced on to the yard. The jeers (0.7mm rope) are also threaded up before the yard is lifted into place, pinned and fixed with CA. The lifts (0.6mm) are spliced to the yard arm and lead up through long tackle blocks on the mast cap, the small block on the yard arm and back to the long block. They are tied off to the timberheads on quarterdeck and forecastle. I had missed the timberheads on the forecastle because they didn’t appear on Caldercraft’s deck plans. Unfotunately I couldn’t position them as shown in the AotS belay plan because a 9 pounder is in the way. They were fixed slightly aft of where they are indicated but I think the run of the lifts is still fine. I am moving on to rigging the topmast yards at this stage leaving the further rigging of the lower yards till later.
  2. Lacking room to house a model the size of Indefatigable, I'm going to have to live it vicariously. I'm looking forward to following your build BE along with the other logs already begun. David
  3. Thanks Allen. I have both books that you reference and will have a go at clinkering the cutters when I get to them, leaning heavily on Beef Wellington's excellent description in his build of Jason.
  4. Thanks Ross and Andrew for your kind comments It's quite simple using a needle to thread the line back and forth through itself two or three times. The following photos should make it clear. To make it easier to see and photograph, I have used 1mm thread and a curved needle but it works with any size of thread and straight needle. It's best here to tighten up the loop around the yard or whatever else you are making the eye-splice for. A third pass through is ideal but not mandatory! The finished splice Secure it off with a dab of dilute pva. Have fun David
  5. The whole 9 Yards… Thanks for looking in and for the likes and comments. I made the yards according to the measurements in the AotS, although they mostly correspond closely with the Caldercraft plans. The central octagonal section was pshaped first using files and 400 grade sandpaper to finish. The round taper sections were completed in my Proxxon lathe starting with coarse 80 grit if a lot of wood needed removing, then 120 and finishing with 400. The sizes and patterns of cleats were taken from Lees rather than the plans. Lees describes stop cleats on the fore topsail yard rather than the sling cleats shown on the plans. I have followed Steele’s tables as closely as possible for the sizes of blocks. I would have liked to have used the correct pattern for the sheet blocks but I couldn’t find any commercially available. Perhaps next time I'll have a go at making them myself. Slings are made from served rope made into a loop with a false splice. A thimble is secured in the middle with a seizing before looping round the yard. I have adopted the kit pieces for the boom irons on the lower yards. The soft metal yard-end pieces are big and bulky. They were cut and filed down until they looked more in proportion. For the outer rings I used some brass pieces left over from HMS Fly which looked more in proportion. When it came to the irons for the topsail yards, I found that using the kit pieces was unworkable, they just looked too big and ugly, so I scratched them from brass rod and styrene tube painted iron grey with Tamiya XF-18. All horses and stirrups were made from 0.5mm rope stained with wood dye as described in an earlier post. The horses are looped around the yards using a false splice The stirrups are fixed at the correct length with a false splice and the the tail wrapped around the yard three times and fixed with dilute pva. The footropes will need some work once the yards are fitted and rigged to get them to lie correctly. David
  6. I like the idea of displaying Diana on keel blocks and was planning a similar presentation so it will be interesting to see how you progress with it. BE used a similar approach to display his model of Pegasus ... https://modelshipworld.com/topic/15526-hms-pegasus-by-blue-ensign-finished-victory-models-164-scale/page/9/#comment-489642 Regarding the main and fore masts, I also had the the problem of the diameter being too large for my Proxxon lathe. I made the section below deck to the diameter in the plan. A cheat but as this area can't be seen, I thought it acceptable. The mast above the partner is sized according to the AotS. If I remember rightly, I planed the main mast from 13mm dowel and sanded it in the drill until the top section would fit in the lathe. David
  7. Congratulations David, on starting your build of Diana. I'll be following along with interest. I'm with DavidEN on the gunports. I adjusted their position to miss bulkhead 3 but there are consequences further down the line. Particularly affected are the channels and positioning of shrouds, which in turn affects the quarter deck gun placements. David
  8. Thanks again for all the likes and comments. I made the jib a little while ago with all the lower yards, stuns’l booms, mizzen gaffs and some of the spare masts. I will cover these as we go on. The jib was made to the specification in the AotS as were all other yards and masts. The bowsprit cap was made from scratch because the kit part did not allow for the holes to be changed to the correct angle. It was also too narrow to fit a jack staff. I used the kit dolphin striker which was glued and pinned to the cap. Before fixing the jib, I added the 'lead' saddle for the spritsail yard which unfortunately doesn't show up well in the photo. This was simply made from a piece of paper (200gsm I think) painted iron grey. The heel lashing is 7 wraps of 0.5mm rope. I wasn’t sure of the order of rigging for the jibboom so followed the order given in Lees, starting with the guy pendants (0.4mm) followed by the horses and the martingale. The horses (0.75mm rope) are knotted with figure-of-eights every 10mm. The horses and pendants are left hanging for the moment. The martingale stay and back stay (0.4mm) are one piece and lead back, via a fall, to the port side of the bowsprit. The mizzen topgallant stay is made from 0.4mm rope and leads through a thimble in the main topmast head and finishes with thimbles and lanyard at the main top. According to Lees the royal stay wasn’t introduced until after 1810 so I have left it off. The back stays lead to the stool abaft the mizzen channel, the topgallant to a 2.5mm deadeye and the royal to an eyebolt. I realise that there is some inconsistency here in that there is a royal backstay but no stay. Maybe I should have left both off and I may go back to it later but I quite like it as it is. The main mast topgallant stay (0.5mm) leads through a 3mm block on the fore topmast head down to the forestay where it is tied off at the collar of the topmast stay lead block. I should have made the strop so that it stood more proud of the mast to improve the run of the topgallant stay but too late now. The royal stay leads through a 3mm block at the fore topmast head and ends in a thimble which is connected by a lanyard to another thimble fixed with a span to the fore topmast cross trees. I realised, too late, that the span should be tied into the inside of the cross trees before fitting the masts, so I have had to tie them to the outside. Back stays run down to the stool abaft the main channel. The foreamast topgallant stay leads through a 3mm block on the jibboom and runs back to the forestay collar where it is tied of with three seizings, The royal stay leads to the end of the jibboom where it is tied off. Backstays are set up in a similar manner and lead down to deadeyes on the foreward channel. I have looked again at the main and fore topmast shifting backstays and decided to re-rig them in a way more in line with the description in Lees. I’m puzzled when Lees says that the pendants were half as long again as the burton pendants. I interpreted this to mean that they would end high up off the deck which didn’t seem right and wasn’t in line with the drawing in AotS. I have rigged the pendants to come to within 90mm of the deck. The falls are set up as in Lees with a long tackle block hooked to the pendant and a single 3mm block hooked to an eyebolt in the channels. The main topmast shifting backstay falls are tied off to a belay pin but the foreward shifting backstay, according to the Caldercraft plan, is tied off to a shroud cleat and would lie across the shrouds. This seemed wrong to my eye so I have fitted a deck cleat, not shown on the plans, to tie it off which I think works better. The standing rigging is now complete and means another milestone in the build is reached just over two years from when it began. Thanks for looking in David
  9. Well done Andrew, that is a wonderful model and I love all the extra detailing which really brings it to life. David
  10. Thanks for your kind words Brian. MSW is a great source of information and support and is how I have learnt whatever 'mad skillz' I have but there is so much more that I have to learn. By the way, my wife thinks that I am mostly just mad! David
  11. Thanks very much Andrew. I bought the serving machine three or four years ago from Domanoff in Minsk. I bought it before the war in Ukraine and it may not be available for import into the UK now. There are other machines on the market, for example from Syren Ship Model Company or YouTubes on how to build one. David
  12. Thanks to all for the likes. Fitting of standing rigging continues and is complete to the level of the topmasts except for final trimming of the ends of stays. The shifting backstays on fore and main masts are described in Lees as being set up from a pendant half as long again as the burton pendant. A long tackle block is hooked into the pendant and single blocked hooked into the channel. My interpretation of the AotS drawing is that they are set up in a similar fashion to the other back stays at the upper end but with a long tackle block seized in the lower end. The falls are a singe block hooked into the channel. I can see the logic of the Lees version but I decided to go with the AotS which I thought looked better. The fore topmast stays are made from 0.8 and 0.7mm rope and both are served as before. A minor disaster struck as I was partway through serving the first rope when the winding handle of my serving machine broke in half. I repaired it by super-glueing the two halves together and then it was reinforced with a bit of brass sprue which I fixed with epoxy. The stays are threaded through the bees: the preventer stay to the aft port and stay through the forward starboard ‘sheave’. The stays end in a thimble connected by a lanyard to a thimble secured to eyebolts at the bow either side of the bowsprit. The topgallant stays are next which will require me to fit the jibboom David
  13. I have begun to add the topmast and top gallant stays. Beginning with the mizzen mast, I remembered why I was going to rig stays to each level of masting before adding the next. Luckily I had decided not to glue masts and mast caps in place so although more awkward than it ought to have been, looping the backstays over the mast head was not difficult. I used 0.6mm rope from Ropes of Scale on the mizzen backstays and 0.7mm for the stay. The stay was served to 30mm below the level of the mouse (I don’t propose to serve any ropes finer than this) and finishes in a thimble which is attached by a lanyard to another thimble tied to an eyebolt on the main top. Both stay and backstays are set up but not finally tensioned until all the masts are completely rigged. I started to rig the main topmast. The breast backstay and the first of the standing backstays are rigged using 0.7mm rope, again not finally tensioned, but I have run out of 5mm deadeyes so can’t continue until supplies arrive from CMB. Shifting backstays on the main mast are shown in both the AotS Diana and the Caldercraft rigging plans but Lees says that they would not generally be seen as they were only used when sailing. However, I am minded to fit them as I think that they do add something to the model. The topmast stay and preventer stay are fitted: the stay from 0.8mm and the preventer stay from 0.7mmrope. Both are served to 30mm below the mouse. The stays lead down through 5mm blocks fitted to the foremast and end in a long-tackle block. The falls are set up with a single 5mm block hooked to eye bolts in the deck each side of the foremast, the stay to the port and preventer to starboard. While waiting for more fittings, I have made a start on the fore topmast. The breast backstays are fitted first using 0.7mm rope with a 5mm block seized in the end. The tackles are rigged with 0.25mm thread tied to an eyebolt in the forward channel passed through the block of backstay and ending in a 3mm block. The fall is spliced to a second 3mm block hooked to another eyebolt abaft the first and is threaded through the upper 3mm block. The fall is tied off to a timberhead. It was at this stage that I noticed that I had rigged a shroud where there should be a backstay. I wondered about carrying on rigging with one backstay less but decided in the end to do the right thing as far as I could. It would have been impossible at this stage to remove the last two pairs of shrouds and replace them correctly so I did the next best thing and carefully cut out the 9th shroud all the way to the mast head where I don’t think (hope) that this fix will be noticed. Cutting out all of the ratlines and retying them was a step too far so the new ratlines were tied in to the existing ones. the offending shroud removed and ratlines restored but looks like a good clean up is required now. Thanks for the likes and for looking in David
  14. I haven't decided how to display them yet. If I mount them on the skid beams a lot of the upper deck detail will be hidden. I will probably hang one from the mainstay tackle pendants. I may mount one or two separately within the display case.
  15. The Vanguard Model instructions for the cutters only show them as carvel planked. I think that I'm going to have to do a lot of reading and trialing before I make a start on them.
  16. Thanks Allan. You've found me out! I've never built a lapstrake boat before and I'm putting it off for as long as possible. David
  17. There was quite a lot of filling and sanding to do on the hull as it turned out but I am reasonably satisfied with the result. The wales were added and the hull painted matt white. I followed BE’s treatment of the wash strake and rowlocks by adding a strip of spare seat support around the inside edge to both strengthen and give support to the wash strakes and tholes. Mast and davit steps were added, made from 6mm dowel. I doubled up on the thickness of the davit by cutting another piece from around the original. I cut a slot and added a blackened pin of 0.75mm brass rod to represent the sheave. I would like to have added the windlass but I had already fitted the thwarts according to the kit design, which didn’t leave sufficient space. (that was the rationale that I used anyway). Finally, I fitted the knees which although even smaller than on the pinnace, proved less troublesome when fitted last. A couple of coats of diluted matt varnish and the launch is finished. The boats are placed temporarily on the skid beams to see how they look. With the pinnace and launch completed, it’s time to return to the main ship and continue with the rigging of the masts. The two cutters will be left for later perhaps as a break during fitting the running rigging.
  18. Andrew and Dave, thanks for the really nice comments and all the likes on the pinnace. It gives me great encouragement for continuing with the launch, which is progressing quite nicely. The ribs and seating are installed in the same way as for the pinnace but installing the ribs from the stern forward. Adding the breasthook helped with improving the curve and strength of the bow section. I have left off the davit and its support for now because I am minded to beef up the davit which looks a bit thin as the 1mm pear piece supplied in the kit. That forward seat is definitely square despite the rather distorted view above! A bit more cleaning and tidying up to do before I paint the hull David
  19. Thanks for looking in and for all for the likes. With both pinnace and launch hulls complete, I continued to work on the pinnace. The ribs are fixed using Tamiya tape as 6mm spacers. Fixing the first ribs and getting them to look in line and parallel was the most difficult part of this stage. Beginning at the bow I think was the problem, so for the launch I will start with the stern ribs. The sternsheet bench was shaped more in line with the plans on page 117 of the AotS and I added some linings at stern and bow. I marked out the position of the thwarts on a piece of scrap and laid it along the boat and each thwart was trimmed as necessary. I was pleased that there were plenty of spare knees because they are very delicate and prone to damage when finishing the hull and the hull took a lot of finishing. More areas for attention showing up when painting the hull white. There are still places at the bow that I’m not happy with but I’m afraid it will have to do. When it comes to the launch, I will add the wales and paint the outside of the hull before fitting the knees. The forward and stern washboards were painted blue and ochre to reflect the colours used on Diana. The pinnace is now complete with the finishing of oars, anchors and boat hooks ongoing. Meanwhile I’m continuing work on the launch. David
  20. Thanks again for all the likes and comments. I have continued by planking the pinnace. After the first three strakes had been put in place, I had already broken a couple of planks and it wasn’t going well. Something wasn’t right and looking closely at the pictures on the original pdf of the instructions, I realised that the first strake didn’t start in the bow rabbet as I had thought, but just below. I removed and refixed the strakes and was able to continue the planking in a much better line. All planks were tapered at bow and stern and some required edge bending. I was able to use the broken planks for the final short spiled planks as there are only just sufficient supplied in the kit to complete the hull. In view of their delicate nature, a few spares would be nice. Nearly finished A bit more filler needed than I would have hoped. The launch was easier to plank but again it looks like the first plank doesn’t go to the rabbet and again I broke a couple. All planks except the first were tapered towards the bow and the last three towards the garboard were edge-bent. Again, I found that there are only just enough planks to complete the hull. I have none left over for the wales but can use some boxwood strip of similar thickness. Only 10 planks left and 12 required. I was able to recover the broken planks to finish off the hull but just as was fixing the last plank I slipped and put a hole in the bow. Luckily it wasn't a complete break and glued back easily. Sanding the hull is a delicate operation. With only 0.6mm to play with, some areas become worryingly thin. When the bulkheads are broken out, the shell is extremely vulnerable. I must try to use less glue on the bulkheads next time. Removing the excess needs a light touch using scapel and chisel and is helped by softening with a damp cloth. To try to give the hull a bit more stability I applied some diluted pva inside below where the gratings will sit and gave the outside a couple of coats of dilute matt varnish. David
  21. Thanks Andrew, Allan and Dave for your thoughts and comments regarding Diana's boats. Dave, the Vanguard boats come with both P/E brass and wood oars in 0.6mm pearwood. For the 32' pinnace they are 67mm long. The brass oars are 64mm. I'm not sure why they are different and the wooden oars different again from seemingly the same item offered separately on the Vanguard website. Hope this helps. David
  22. Thanks everyone for the likes and comments. As a change from fixing and rigging masts and Also while I’m waiting for further supplies of rope from Ropes of Scale, I am turning to making some of the ship’s boats. I started to make up one of the supplied boats in the kit but soon realised that they just wouldn’t do so as a sort of Christmas present to myself, I order a 32’ pinnace, 26’ launch, and 24 and 18’ cutter from Chris Watton. I have begun with the pinnace and launch, reasoning that the two larger boats might be the most straightforward. Well, if they are, I’m going to have fun with the other two. The bulkheads for the pinnace all slotted into the baseboard easily and without any sanding needed. The sternboard went on easily too. I added some extra support at the prow and the stern because both looked quite vulnerable. The launch however, required the slots in each bulkhead to be opened up a touch. Almost inevitably, when trying to fit the sternboard to the launch, the keel piece snapped. A drop of superglue was enough to fix it back in place and more support blocks at stem and stern will hopefully protect both. The forward and aft bulkheads were faired on each boat and the first planks have been fitted. David
  23. A lovely model Glenn. This and the other great little boats you have built have inspired me to make them my next project after my Diana is completed. David
×
×
  • Create New...