-
Posts
40 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Events
Posts posted by ollagynot
-
-
-
-
-
The outboard planking is now complete from the wales down, and the inboard planking is complete from the lower deck clamps down. I have chosen to leak a portion un-planked to expose the frames. Next I will be the treenails. I had cut the lower deck beams some time ago, I have them just "dry fit" in their spot in that last photo. Thanks for all the likes so far!
Tony
-
-
- Canute, Captain Poison, Pete38 and 7 others
- 10
-
-
I have completed assembly and dry fit the keelson, a little fairing to be done. I am also looking into some different wood for the planking.
I do not see pillars in the cross section plans, but I see pillars of varying numbers on other builds? I am curious where other builders got their ideas. Any additional info on the pillars, spacing/design would be appreciated. I would like to mill holes for them before installing the keelson.
Thanks,
Tony
-
-
I finally finished the last of the frames today, now all nine of them are done! Moving on to cleaning up the notches for the keel and keelson.
I am very happy with how they turned out. Most of the joints are pretty tight, only two or three that have a small gap. I am also happy with the wood choice (maple), the frames are surprisingly strong.
I will also be looking for jig ideas in the other build logs before I begin assembling everything.
Tony
-
-
-
-
I saw your Columbus and Pennsylvania today at the fair. The Columbus is coming along very well and the Pennsylvania was beautiful.
Tony
H.M.S. Triton (Cross Section) by ollagynot - FINISHED - 1:48
in Cross Section Build Logs for HMS TRITON
Posted
Taking a break from treenails to do a little work on the lower deck.
Used the mill for the notches in the deck beams and the table saw for the carlings.
Thanks for all the likes,
Tony