Jump to content

muzzleloader

Members
  • Posts

    127
  • Joined

  • Last visited

Posts posted by muzzleloader

  1. It's been a while. Just spent a week visiting family on N.C. and two weeks visiting in Portugal.

     

    All I've done is shape the lower end of the mast and install the lower deck mast support.

     

    The lower deck mast support

     

    post-641-0-45184600-1468032679_thumb.jpg

    The mast fitted. I will have to enlarge the whole in order to fit wedges.

     

    post-641-0-66171200-1468033498_thumb.jpg

     

    The mast is a 3/4 inch pine dowel. 27 1/2 inches tall. This thing is larger than I expected.

    post-641-0-85211600-1468033756_thumb.jpg

  2. I have an old craftsman. I bought it used about 10 years ago. I find I always use it at full speed and use a vacuum instead of the blower (your going to vacuum all that dust up later anyway).

     

    Invest in some good blades. It really makes a difference. I use Olson Precision Ground Tooth blades. The ones the big box stores sell do not last. Even Olson's cheaper blades don't last as long as their good ones.

     

    Mark

  3. It's been awhile but I have not been completely idle. I started cutting the slots for the smaller deck beams and found I it easier to use a tool the size of the cutouts. So I made one. I used small allen wrench and a piece of wood. I don't have a grinder so had to use a cutoff wheel in the dremel.

    a 2 1/2 inch piece of allen wrench and some scrap

    post-641-0-85713100-1464625312_thumb.jpg

     

    after about 1/2 hour work

    post-641-0-61321000-1464625339_thumb.jpg

    The steel is usually fairly good so they hold a decent edge. There are a lot of places where a bent chisel can get into places that a straight one won't. And if you mess it up nothing lost.  

     

    Mark

     

     

     

     

  4. It's been several weeks since an update but I have not been totally idle. Until I started this update I did not realize how long it has been. I have planked the lower inside of the hull. Finished the lower deck hangers and the mast step.

     

              Planking below the first hanger and between the stringers

    post-641-0-55223000-1459036610_thumb.jpg

              These are vents there is one between each rib. 

    post-641-0-91093900-1459036727_thumb.jpg

              Damn. The keelson was too small. The keelson and first stringer have to line up for the mast step to fit correctly. So out it comes and the new one goes in. You can also see the 8-32 nuts imbedded in the frames.  

    post-641-0-44305700-1459036845_thumb.jpg

              And here is the mast step. The second one. The first one I tried building and then fitting it. This one I fitted the  individual pieces and then glued them together and did the final fitting.

    post-641-0-54325400-1459042454_thumb.jpg

              The lower deck hangers. The nails are the ones that come with kits. I got lucky and they are the right size.

    post-641-0-52179000-1459042117_thumb.jpg

  5. Now to catch up with the build progress.

    First checking and final adjustments to the top and bottom gunport sills.

    post-641-0-46493400-1455767765_thumb.jpg

     

    Next I planked above the wales.

    post-641-0-65107200-1455767970_thumb.jpg

     

    And the planking is done. Sanded to 320 but no finish applied yet. It's amazing how nasty it looks before it's done.

    The final fitting of the gunports will be done after the interior is planked.

    post-641-0-56207200-1455768490_thumb.jpg

     

    The visible ribs are finished. There is one coat of sanding sealer and so far and two coats of an oil finish. I'm using Woodstock Oil Finish. It's made for gun stocks but I'm not sure it's available anymore. I got this bottle over twenty years ago. This picture shows the difference with and without the oil finish added.

    post-641-0-59194600-1455768883_thumb.jpg

     

    Finally for today the stringers. All of them are made of two pieces side by side.

    post-641-0-47237400-1455769161_thumb.jpg

    post-641-0-68703800-1455769359_thumb.jpg

     

    That's it for today. Hopefully I'll get the planking below the first hangar done tomorrow. It depends on whether she who must be obeyed has anything planned.

     

    Thanks for looking

     

    Mark 

     

     

     

  6. Jason 

     

    Seeing the actual ship is a two edged sword. First: you can't cheat, and there are a lot of details on the modern ship that do not seem acurate to the original.

    For example the rebuilt ship has a hydraulic capstan under the original lower deck capstan. I wont be including the bathrooms. On the other hand there are a lot of things I would never see on the plans.

     

    Mark

  7. I got back from a trip to Lisbon yesterday and hit a gold mine while there.

    The plans for the Fernando e Gloria do not show any of the interior structure. I have the companion book to the plans about the reconstruction. It has some of the interior layout but they to small to by of much use. The book states that the plans are available at the museum. 

    So while in Lisbon we went to the museum to ask about the plans. They called Sr. Fernando and he came down to talk to us. When we explained what I wanted he smiled and took us to his office.

    He had five folders full of the original plans for the reconstruction. There are even prints of the spikes used to attache the deck planking (the gun and weather deck use different sized spikes).  He didn't have a copier large enough for the plans but let me take pictures of any thing I wanted.

    Four hours and over 100 pictures later I was one happy camper. Some of them are a little blurry (I was using our phone) but I can clean them up in the computer. 

    I would think every museum has the plans for the models they have on display if they are built by the museum. The museum in Lisbon has plans of almost all the models on display for sale. They also have a workshop where they teach classes a couple of times a year. If you live near a museum Ask.

    The Lisbon museum also has a nautical research library. I haven't used it yet but will in the future. 

     

    Thanks to all the MSW artists whom I have stolen ideas. jigs and techniques from.

     

    Mark

  8. Installed the garboard strakes and the next plank up on both sides. The pencil lines are the layout for the different thickness of planking.

    post-641-0-30268900-1452993773_thumb.jpg

    The holes in the keel are for bolts to mount the model. There are nuts inlet in the frames.

    post-641-0-64989500-1452993031_thumb.jpg

    There is also a board a over the keelson. I don't know what it's called.

    post-641-0-36155300-1452993113_thumb.jpg

     

    That's it for today. Thanks for looking.

  9. Well I messed up. 6 of the 10 gunports are wrong!! I think when I measured I did not allow for the thickness of the frame pieces. The red lines show where they are supposed to be. CUT EM OUT.

    post-641-0-99666200-1450751663_thumb.jpg

     

    I also cut the tops of the frames too short. I leveled them out and added a piece to the top. When the planking is added they will not be visable.

    post-641-0-65917600-1450751937_thumb.jpg

     

    Next it comes out of the build frame and I pull out the large files and sandpaper and get everything faired up.  I hope.

  10. The interior is sanded smooth and the keelson and first limber strakes and lower deck clamps installed. Now things are stiff. 

    I tried to install bolts in one of the frames but after sanding I couldn't see them so did not do the rest.

    post-641-0-09043800-1450316148_thumb.jpg

     

    also started the gun ports. The small light colored pieces are there to stiffen the upper works.

     

    It's nice to see some progress.

     

    Mark

     

     

  11. Dom Fernado II e Gloria was launched in Daman, India in 1843 and fitted out in Goa and took her maiden voyage to Lisbon in 1845. She remained in active service until 1878 then remained anchored in Lisbon until 1963 when she burned to the waterline during repairs. She remained sitting in the mud until 1993 when a five year reconstruction was begun. She was open to the public for Expo 98 and is on permenant display in Cacilhas south of Lisbon.

     

    D.Fenando was constructed of teak and the frame layout is different from the norms for Europe. They are doubled and the fore and aft are mirror images. All the frames are the same width with the gaps between frames all the same.

     

    The plans and a book about the reconstruction came from the Maritime Museum in Lisbon. I then scanned them joined the scans with Photoshop and imported them into Autocad. The book has some good pictures of the construction and plans not included with the regular plans. Unfortunatly the pictures and plans don't always agree. The photos show a frame in the middle of each gunport but the plans don't so I decided to go with the pictures because that is how the ship is actually built.

     

    The frames and made of Brazilian Cherry the decks will be maple and everything else will be whatever is in the wood pile.

     

    This is my first build log and I'm no writer (that's my fathers job) and our best camera is the phone of she how must be obeyed, so here goes.

    What you see so far is about a year of computer work and making sawdust.  

     

    post-641-0-85709600-1449884344_thumb.jpg

    These are the pieces of the No. 2 frame. All  the other frames are the same layout. The fore and aft faces are mirror images of each other. The pieces where ruff cut on the scroll saw and the joints where done with a sled on the Proxxon table saw.

    post-641-0-03841200-1449886254_thumb.jpg

    I don't have any pictures on the keel but is built up differently than usual. There is a false keel, keel and top. The rabbet is just an angle cut in the top of the keel then the top is placed on the keel. There are no notches for the frames. They are just placed on the keel and bolted down.

     

    post-641-0-98759200-1449886805.jpg

     

    post-641-0-56905900-1449887266_thumb.jpg

     

    post-641-0-00622100-1449887286_thumb.jpg

     

    Almost forgot, the section is from the boarding ladder aft to the capstan and includes the main mast.

     

    Enough for today. As always comments good, bad or indifferent are always welcome. 

×
×
  • Create New...