Jump to content

Recommended Posts

Posted (edited)

Table of contents


Pre-building

Log #1: research and preparation

Log #2: Unboxing and review


Hull Construction

Log #3: Frame assembly
Log #4: Transom, Fairing and Keel

Log #5: Bulwarks

Log #6: First planks

Log #7: First layer planks - pt 2

Log #8: Finishing and sanding first layer planking

Log #9: Starting the second layer planking

Log #10: Completing the first band

Log #11: completing the second layer planking

 

Hull painting

Log #12: Priming the hull

Log #13: Painting the hull

 

Bulwarks
Log #14: Bulwarks and Wales

 

———————————————————

 

 

 

Log #1: Research and preparation

 

This is the start of the Sherbourne build log, the kit won’t be arriving for another 2-3 weeks but anything that I should be aware of or extra parts I should get please let me know.

 

I will be replacing all rope with

Ropes of Scale and the kit blocks with Syren blocks. 

Edited by Isaiah
Posted (edited)
1 hour ago, Pitan said:


I stand to be corrected, but, I thought Vanguard uses Ropes of Scale?
Though the supplied standing rigging is black in this kit, and you may want brown?


I’m following your build as well.


It’s not Ropes of Scale. I think it might be Amati cord. Ropes of scale rope only comes in 6 metre lengths.

 

Good point about the standing rigging. Coal or black tar came much later so brown or pine tar would be better.

Edited by Isaiah
Posted
1 hour ago, Pitan said:

The kit supplies flat etched brass belaying pins.  Personally, I'd prefer round pins.

 

File the edges, paint them black and they look perfect imho.

Walter.

 

Current build: Thinking about it

Finished build: HMS Flirt

Posted

Looks interesting.
The kit has a hull cradle sized to support the hull at the frames (even before planking), but I can see other stages in the build where your jigs will be useful.

A modification of your cutting jig might be very useful when working on my mast and spars.  I wonder? Pondering ...

Posted
3 hours ago, Isaiah said:

I just realised I have to add blocks to the jig to fit in between the bulkheads. Otherwise the bulkheads won’t be able to slot all the way down.

 

Absolutely no need. The Vanguard system makes jigs etc. superfluous.

Simon.

 

Current builds 

 

  • HMS Speedy v2023 - Vanguard Models
  • Nisha - Vanguard Models
  • HM Gun Brig Adder - Vanguard Models

 

Previous

 

 

Posted
8 hours ago, Isaiah said:

Here’s a couple things I’ve made while waiting for the kit to arrive.


Crosscut jig, pre-bought ones are never as good.

IMG_3971.thumb.jpeg.bc1a6ddc7cab9c78eaf48a0fb041289c.jpeg

 

And an adjustable jig to hold the false keel and keep it straight. 

IMG_3973.thumb.jpeg.44488665646da19bb110158a015b5f04.jpeg

You will not need any of that :)

logo.jpg
Vanguard Models on Facebook

Posted
51 minutes ago, Isaiah said:

most other kits I’ve seen require keeping the keel straight while planking

You can prevent this by using filler blocks in some places, which also give the planking a greater surface area to adhere to. 

Posted
2 hours ago, Pitan said:

That looks like nice progress, Isaiah.
That hull should be nice and straight by now?

The hull had a slight twist along the length. I’ve currently got it under tension while the glue around all the bulkheads dries. Should work.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...