-
Posts
1,553 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Events
Posts posted by G.L.
-
-
-
-
-
-
-
- Jolley Roger and Canute
- 2
-
-
-
-
- John Allen, Mirabell61, tarbrush and 1 other
- 4
-
-
-
- tarbrush, John Allen and mtaylor
- 3
-
-
12.10
To give the hatch the same curve as the roof I glue it together on top of the roof. A piece of paper between both prevents that the hatch is glued on the roof. When the glue of the hatch is dry, I sand it and make the hatch rails. On the front side the pincher is holding the front plank in place while the glue is drying
-
-
-
12.7
I glue the bottom-, top front- and top middle beam between the 2 sides and fill the so formed front frame with planks. The width of both top beams was almost double as it should be. When the glue was dry, I sanded the topside of the deckhouse arched with the band sander as can be seen on the picture.
- John Allen, mtaylor and tarbrush
- 3
-
-
-
- KORTES, russ, John Allen and 1 other
- 4
-
- mtbediz, tarbrush and John Allen
- 3
-
12.2
I add also the a small rail with 3 holes for belaying pins, connecting the jib boom support with the knight head.
The belaying pins are made on the lathe of a spar of beech.1. I first cut the thin part of the pin.
2. With a round file I shape the body of the handle.
3. I then cut off the pin from the spar and turn it around with the thin part in the chuck and I round the upper side of the handle with a flat (triangle) file.
4. The result.
5. The pins in the rail.
-
- tarbrush, mtbediz and John Allen
- 3
HMS Triton cross section - FINISHED - by G.L. Scale 1:24
in Cross Section Build Logs for HMS TRITON
Posted
Raw hatch and grating