Jump to content

semorebutts

Members
  • Posts

    664
  • Joined

  • Last visited

Posts posted by semorebutts

  1. No call into work today either?!? So the mast continues with the the 3rd of 3 fazes starting today. 

    I start with the crows nest. With The joints taped shut I dab some thin glue on the inside. Then add the wheel with medium glue. 

    IMG_1826.thumb.JPG.47324561e94764875d6544612649e1f4.JPGIMG_1831.thumb.JPG.b1213e6d5757af4e972218e3e4641376.JPG

    a few pieces start to go onto the mast also. 

    IMG_1832.thumb.JPG.cd763d9aff1d642dd050d5c0ac941bdb.JPGIMG_1834.thumb.JPG.eb9a0c44bc82f443d8a4ac83c7fad1e8.JPG

    thats all for now. 

  2. I tried the pva glue technique that Danny had mentioned and it worked like a dream, Thanks Danny!

     Today I continue to construction of the main mast.  The first thing to do is make sure the two pieces to be joined are plumB.  It took 30 minutes of fiddling but finally, its plumB. 

    IMG_1815.thumb.JPG.e2d098b267f6262d68a9b1432d694bf9.JPGIMG_1816.thumb.JPG.639bcaa0dd7905e06030ba6aea28dbdb.JPG

    looks plumB enough for me!  Now to touch a tiny drop of glue without moving it out of plumB  and letting the  capillary action do it's thing. 

    IMG_1817.thumb.JPG.ba82bc0082bfa23404bc2fdce8d48ef0.JPG

    next come these two pieces. I do not know what they are called.  Joices? braces? Rafters?  Whatever they are they are now glued in place. IMG_1820.thumb.JPG.708b7cabd605568c97b628f9064b024b.JPG

    Hmmmm. Not called into work yet?? Thats odd. :huh:  So I am going to cautiously continue. 

  3. It's a gluey mess Cog! trust me, Glue everywhere!

     Danny I actually slid the yard into the hole of the donuts shaped piece and glued it like that.  I figure it's better than nothing and will provide somthing for me to wrap rigging EZ line around. but there's no way I'm good enough to do it like the directions call for.

  4. CDW  I Asked myself the same question so I checked. Rigging line and a flag attaches to it. Here is a picture. 

    IMG_1795.thumb.PNG.f577b6a3629b90fe0132e69bdddc5580.PNG

    I continue with the mast. First I finish up the piece I've been working on. 

    IMG_1765.thumb.JPG.6dc7585ac08878d3b88be003cd261bb5.JPGIMG_1766.thumb.JPG.561a19d6be26f3181f14252409a56753.JPG

    now I lay out the 2 pieces together and adjust them till it's perfect. Then without dislodging it I just touch a drop of thin glue to the joints.  

    IMG_1791.thumb.JPG.dd151f85416b4b74488438cd01355b84.JPGIMG_1792.thumb.JPG.d63d6323871cc7d470f76e7c3b262aec.JPGIMG_1794.thumb.JPG.13c86b69c585bdecd4e480320c6fe1b6.JPG 

     

  5. Ugh. Just when I think I will get alot of progress done I get called into work! Again! 4 saturdays in a row! 

     

    Heres what I got done before he called me. I laid it out as square as possible. Then touched a drop of thin CA to each joint. 

    IMG_1746.thumb.JPG.80dda3a7b3900d5f71beeac22b4d64de.JPGIMG_1748.thumb.JPG.2ce6c63bb57d0fc3e707592f15bd7f37.JPGIMG_1749.thumb.JPG.03e6ef36e983301188029991f3e02318.JPG

    the bottle of CA is leaking. Theres a gluey mess!

    IMG_1751.thumb.JPG.4a79028da7052cd87e848f1c8eec198a.JPG

     

  6. Today I just laid out the next step on the main mast. 

    IMG_1728.thumb.JPG.82ca986764aa4a2c9bef7a674b62bfb4.JPG

    I lost yet another important piece. Inside The spot I circled where the 3 scribed pieces meet there is a piece that helps all 3 join together. I lost it though :default_wallbash: my only chioce now is to just put an big ugly blob of glue there. 

    IMG_1729.thumb.JPG.f64c6733ac6c581afd1e5293456d54e7.JPGIMG_1730.thumb.JPG.74a49448d420b6a2e86052b7395a60ad.JPG

    sorry no actual progress was made today. 

×
×
  • Create New...