Jump to content

Jobbie

Members
  • Posts

    220
  • Joined

  • Last visited

Posts posted by Jobbie

  1. I’ve now completed the rigging for the lower yardarm on both masts. Both the foremast’s main and topsail braces run through blocks down along the main-stay. They get very close to each other but don’t rub on each other when rigging according to the plans. 
     

    I don’t particularly like the way these port and starboard braces run through double blocks together above the windlass because their working load wouldn’t be parallel to the pulley’s axle. But I’ll leave it to match the plans as a reference for other builders of this kit. 

     

    All the rigging except for the spirit-sail yard is now complete. Coils of rope need to be placed on the pin-rails where ropes are lashed and the anchors both need suspending on their cat-heads….then this project’s complete. 

    IMG_5213.jpeg

    IMG_5215.jpeg

    IMG_5216.jpeg

    IMG_5214.jpeg

    IMG_5217.jpeg

  2. There’s a rather confusing, not clearly described or drawn part of the running rigging plan on sheet 6. I believe I’ve worked it out, so I’ll share it here to possibly aid other builders.


    The lifting tackle (tyes) for the top-sail yards (the two middle yards) start off with the port and starboard ropes being tied to the upper forward-most cross-trees. From there they drop down to the yard, pass in opposite directions through a double block in the middle (K; 5mm double block), then back up to the cross-trees. Then they pass through two separate blocks tied to the cross-trees (H; 3mm single block) and down through a truck: a hole drilled through a section of square wood that’s been lashed to the aft-most top-mast back-stay. (6th deadeye from the front on the fore-mast, 7th deadeye from the front on the main-mast. 
     

    I used 1.5mm x 1.5mm walnut, cut into 3mm lengths for the 4x trucks.  

    From there, the top-sail yard tyes terminate at a block (J; 5mm single block).
     

    A second block is lashed to the chain-plates. The final hauled rope on each side passes through both blocks and gets tied off: Forward inner bulwark cleat for the fore, aft-most belaying pin on the quarterdeck for the main.

     

    I’ve probably confused you more, haven’t I?

    IMG_5027.jpeg

    IMG_5029.jpeg

    IMG_5028.jpeg

  3. Oh, Great Oracle, a question….
    Main topgallant backstay.

     

    My plans for Caldercraft’s 1:64 HM Brig Supply show the stay (highlighted in yellow) terminates on the fore-mast’s top.

     

    C. Nepean Longridge’s Anatomy of Nelson’s Ships book only really relates to HMS Victory. It shows the main topgallant stay terminates at a v-shaped stirrup lashed to the foremast trestle-trees which support the fore-top. 

    Would there be a different termination method on smaller logistics vessels such as the Supply?

     

    Also, for bonus points; the main topmast’s backstay (highlighted in blue) show the line passes through a block at the masthead, then passes through the top to terminate at the deck. As there’s no hole in the platform behind the masthead, how would I do that? Drill a hole?

    IMG_4925.jpeg

    IMG_4935.jpeg

    IMG_4934.jpeg

  4. I’ve now completed the top-mast’s shrouds. I’ve been using some leftover Artesania Latina black 0.25mm rope for the ratlines, but I’ve finally run out of it. So the fore topmast’s port’s ratlines are done with the Caldercraft supplied natural 0.25mm rope. They’re soon to be dyed black with Indian ink. I’d done a test; one of the lower ratlines was natural colour, then dyed black. I honestly can’t remember which one….So, that’s good!

     

    On to the topmast’s backstays. 

    IMG_4920.jpeg

    IMG_4921.jpeg

    IMG_4923.jpeg

  5. On 9/4/2022 at 2:36 PM, Acker said:

    Not sure but I think I may have uploaded the last set of photographs without reducing them to the regulation size (1600 x 1200) -  if that is so then my apologies to the moderators.

    I found sheet 6 (running rigging) difficult to understand and even after checking out other Supply builds (thanks Dfell and Kiwiron) I still found myself making my own interpretations of some of the rigging. I hope I have not strayed too far from what would be found on a real ship of the period. Part of the sheet 6 was completely incomprehensible to me - see photos below...

    IMG_0671.thumb.JPG.9d51503f4644e7d43cf5f8fd3e431631.JPGIMG_0672.thumb.JPG.89e2178898561aea4c6d040974451fee.JPGIMG_0673.thumb.JPG.b359ec6d2ef106457fac2beea7159cab.JPG

    Funny...I found your build of the Supply while looking for guidance of the self-same rigging! Your build looks very nice indeed. Well played, that man!

  6. Because there’s virtually no weight to the driver-gaff, its running rigging appeared too loose. So I’ve added two extra ropes down to the quarterdeck to keep it under tension. They’re not in the plans but they don’t look too out of place. (I hope.)

     

    The three blocks for the gaff’s tackle are supposed to be all mounted behind the main mast-head. The rope’s run down the mast would be fowled by the the top, so I relocated the lowest block to the rear of the top. I made it a double block to accommodate both the upper and lower gaff’s tackle in the same manner. 

    IMG_4722.jpeg

    IMG_4723.jpeg

  7. I’ve attached the gaff-booms before I rig the main shrouds. 

    Advice sought:

    The plans show the support rope for the driver gaff passing through three blocks at the rear of the main mast-head before dropping vertically down to be lashed on a cleat at the base of the mast. 
     

    But the main-top’s in the way. Should the rope pass through the right-hand side lubber’s hole? (Where it will rub.)

    Or down behind the top? (Where it will rub.)

    or should I drill a small hole in the main-top behind the mast for the driver gaff rope to pass without impediment?

     

    (Edit) Solution: Duh…I’ll just move the lowest of the three blocks to sit at the rear edge of the main-top. 
    Simple. Sometimes you have to hit the “submit” button before nutting it out. 

     

    IMG_4713.jpeg

    IMG_4714.jpeg

  8. Caldercraft 1:64 HM Brig Supply.

    With the fore-mast’s lower shrouds and rat-lines completed, I’m thinking about how I’m going to suspend the fore-yard. 
     

    Referencing a drawing from the book “The Anatomy Of Nelson’s Ships”, I’m trying to improve on the kit’s accuracy. 

    But I’ll simplify it a fair bit because it’s not the Victory…

    So I made elm-cleats out of Evergreen styrene and glued them to the fore and main-top. I left them open at the top end. Then I wound 0.5mm thread around the tops using 2mm rod as a spacer, then dropped them into the open cleat before closing its top off. Rinse and repeat three more times. (I’ll paint the styrene black later.)

     

    From these rope coils hang the jeer-strops: Thicker rope to which the jeer-blocks are attached at the bottom.

    These pass  through the lubber’s hole.
     

    Rope around the yards pass through the block’s pulleys and take the weight of the lower masts. 

    The ropes will be lashed to the deck and tied off by the cleats around the base of the masts.

    IMG_4679.jpeg

    IMG_4695.jpeg

    IMG_4687.jpeg

    IMG_4694.jpeg

    IMG_4689.jpeg

    IMG_4696.jpeg

  9. I was planning on wrapping the anchor cables twice around the winch, then through the main deck’s forward hatch, but only 500mm of 2.5mm natural hemp is supplied for the anchor cable. 
     

    So I’ve had to simplify the anchor cable’s routing method.

     

    A clove-hitch at both ends of the cable to prevent unravelling, then two in the centre with a cut in between. 2x 250mm lengths per anchor. A simple bight at the anchor’s ring that’s been west-country whipped, then only once around the winch. I’ll drill two holes through the deck behind the winch and push the cables through. 
     

    Shrouds;
    The plans recommend a piece of wire with two 90° bends 15mm apart be used to space the deadeyes apart before lashing them. So…yep. That happened. More west-country whipping. 
    (Ten years of being a Scout leader has paid off.)
     

    The quarterdeck ladder’s been mounted: the last of the deck fittings. 
    Huzzah!

    IMG_4597.jpeg

    IMG_4598.jpeg

  10. The chesstrees and crosstrees were cut out of the parts frame. I took the opportunity to remove the last two remaining kit parts from the frames: The ladder sides for the quarterdeck. 
     

    After a bit of work, the trees were fitted near the topmast’s uppers, resting on the “hounds”; the point where the mast changes from an octagonal taper to a smaller diameter square. 
     

    The topgallant masts rest on the chesstrees with a fid in the same way the topmasts rest on the mast’s tops further down.

     

    I’m really enjoying myself. It’s been too long. 

    IMG_4579.jpeg

    IMG_4581.jpeg

    IMG_4582.jpeg

  11. Well, after Caldercraft advised me they were going to send me the 5x missing deck cleats, I waited three months. 
     

    Nothing arrived. 
     

    I re-sent the email, asking if they were in the mail. My email enquiry received no response. 
     

    So I just bought some from my local supplier. AU$2.95. My wife tells me I should have just bought them months ago. Yep.
     

    So… Five months later… I finally have the parts I need. Time to progress the build. 

    IMG_4570.jpeg

  12. I’ve had a response from Caldercraft regarding the errors in the plans:

     

    I have now had a chance to look through the information that you provided and, as you say, there are a couple of human errors on the plans/parts list which we have now corrected with your assistance.

    Errors 1 and 2, with regard to the incorrect part number (#137 should be #138) on plan sheet 2 has now been corrected and positioning of part #137, previously missing, has now also been added to all plans.

    Error 3, the incorrect quantity of cleats, #85, being provided/shown on the plan sheets has now been corrected.

     

    We are always grateful to customers reaching out to us with potential errors in order to put things right;  with the greatest will in the world, it doesn’t matter how many times we proof read and check over plans/manuals something always gets through!  Despite the kit of Supply being on sale for many years, from the serial number it appears your kit was manufactured in 2014, to my knowledge this is the first time these issues have ever been raised.

     

    We are more than happy to send you the 5 additional cleats in order to allow the kit to be completed as intended.”

     

    Very pleased with their response. 

×
×
  • Create New...