Hi guys, its been a while. I made the "anchor's rubbing protection" ?, as well the anchor chain holes we mentionned earlier. I glued the sleeping bags, the sides and the little design triangles.

After that, I hand painted the whole thing. I am very happy with the "water line" ?, because instead of using tape, which could potentially leak, I freehanded it. In my opinion, it couldn't have been better with tape.

To finish off, I glued on the catheads.

 

16946540581003119400858579144522.thumb.jpg.bfba8d66b087868a16046f243b46ab11.jpg

16946542949375311180865670450346.thumb.jpg.599408f183096a4726938f50163ea58a.jpg

 

16946546056693307944759450943877.thumb.jpg.07be26cfeccbc5ed24971b747dafc63d.jpg

 

16946541975407812701245819932060.thumb.jpg.7116450ad78f18d9d6420a605da20a37.jpg

 

16946544369991885722244580844245.thumb.jpg.52533623670f05c58c9679877120433b.jpg

 

16946546940937445153847100673146.thumb.jpg.3cde8b6be4895eace544bf7ea4679ebc.jpg

 

1694654736338955437540854042678.thumb.jpg.a25c318901653737a15007263ecf0077.jpg

Link to comment
Share on other sites

  • 3 weeks later...

The bow's decorations are finished. They where hard to do, because of the curves and the end loops you had to give the brass rods.

Speaking of them, as some mentionned in their build logs before, this kit doesn't have enough of 1 mm rods. I just commander them, and by occre's police, they should be free of charges. I don't know if there are other material issues you have encountered. If yes, let me know.

 

16959560751518565670416629429994.thumb.jpg.9c4c32916ae92460448215454a67b7f8.jpg

 

16959561705814826338255786231449.thumb.jpg.939822d5b946024499ede4bca4252296.jpg

 

After that, I painted the barge and the stern.

 

16959562984205485438411497093920.thumb.jpg.ee7855b5f79cad1fcacb077e988cc392.jpg

 

16959563324136552033586252776954.thumb.jpg.bc75945d80ae28789176fc24d32f8365.jpg

Link to comment
Share on other sites

Great work on the bow.   I struggled with that on mine.  Yours looks fantastic.  
 

I remember being short on one size of wood on my Beagle, I think it was the 2x4 mm sapelli  and Occre sent more no questions asked.   I made a mistake on my Diana and they even replaced those parts.   It does take 2-3 weeks to get the replacement/missing items shipped from Spain to the US, so be ready for the wait if you are in the US.  

Completed Build:   HMS Beagle - Occre

Current Build:         Frigate Diana - Occre  https://modelshipworld.com/topic/33530-frigate-diana-by-rossr-occre-185/

On the Shelf:           Santisima Trinidad Cross Section - Occre, NRG Half Hull, the US Brig Syren - Model Shipways and USF Essex - Model Shipways.

Link to comment
Share on other sites

Hi Patrick, 

 

Your build is coming along well and is looking great. 

 

Regarding kit materials I've found them to be variable.  The timber for the first and second planking I had enough to build two kits.  As you say, the brass wire is limited.  The 0.7mm brass eyelet (part B ) was in short supply so I got some brass wire from Amazon for a couple of pounds and made my own.  There are a couple of instances where you have to open up the eyelet to join it to chain and I found the one's supplied with my kit weren't malleable enough and would snap.  The one's I made from wire were fine.

 

Regards, Chimp

Current Build: ....

 

Previous Builds: HMS Beagle - OcCre,   HM Schooner Ballahoo - Caldercraft

Link to comment
Share on other sites

  • 1 month later...

Hi, its been a long time.

In the meantime I ordered 5 more brass rods, which weren't the right size. Luckily, occre agreed to send me an other package, for free.

 

16994002342395555713688270798981.thumb.jpg.32ce855947fff61dc6d3a90b0905b6bf.jpg

 

While waiting, I drilled the holes for the nails of the keel (is that the word? ), which turned out pretty good. The hard part was to carefully bend the sides to fit the curvature of the stern.

 

16994005773093409390090803179393.thumb.jpg.c46cae5e26e449340ff740b6aad65984.jpg

 

16994006458436022393767934047617.thumb.jpg.8657c17c0a584aac7d4c46ea9593a6e0.jpg

 

Next, I made the windows from leftover wood, because the kit supplied one woudn't fit, because of how flat they where. They still servent as a good guide, to get the size right. I then bended and glued the metal decoration piece.

 

16994008992911788533084670372165.thumb.jpg.036a607ef931557c78cb13bbfc213697.jpg

 

16994010238081578658255572443996.thumb.jpg.9b3f954aa840360c709d4d263eeacf85.jpg

 

To finish of, I drilled and glued the eyebolts arount the mast hole. I think I might have placed the one at the left a bit too close to the one beside it. After that, I started the trapdoors.

 

16994012369562853550883090008317.thumb.jpg.7bd7618667e89e68dd7de1ea447079dc.jpg

 

16994012903322580303262424859077.thumb.jpg.a48139c9f50797e6655598255a3f923e.jpg

 

bye guys, until next time. I will try to post more often.

Link to comment
Share on other sites

21 hours ago, Patrick B said:

I drilled the holes for the nails of the keel (is that the word? ),

Since you asked, technically, the part you're referring to is the sternpost. The keel is just the horizontal beam at the very bottom of the hull, while the sternpost is the vertical(ish) member that supports the rudder.

Link to comment
Share on other sites

  • 1 month later...

Hi everybody, some progress has been made during the holidays, and more is to come. The central trap doors are finished, as well as a crank, wich I still don't know the use. Since the pins where too far forward, I had to glue it at the back. I also covered the feet with a mahagony veneer I curved around, making them much better looking than the naked plywood.17038868578398233368138058869610.thumb.jpg.344dc7b35a8a98fc3268eb136ff5b380.jpg

 

 

I forgot last time to show you the bow figure, wich I painted with gold testor enamel paint.

 

17038871519377173839029456941815.thumb.jpg.ee327832adee8af38ef752471d8632dc.jpg

 

Then came the chainplates, very fastidius to make the end loops. I invented a method to glue the beam over all at once, consisting of placing a wedge under the cutting mat to elevate the deadeyes. 

20231223_141322.thumb.jpg.de9d8c987c8341277a730125d80433e9.jpg

 

17038882809995934390949889157351.thumb.jpg.47bf1c65549e8a00fb2ce02865d3252b.jpg

 

I haven't nailed them to the hull yet, I am waiting to place the mast in, to align them with it.

 

At first, I hadn't realise that the 3 deadeyes at the stern where supposed to be the small size. I realized that a bit too late. I had to open them and replace them. Now nobody could notice that this mistake was made.

 

17038907404007250586068046727479.thumb.jpg.4c698d0c0a8ac52a75e55bf2a951efdf.jpg

 

I attached some blocks to eyebolts on the deck, but made a small mistake. For one of them, the hole was upside down. I managed to take it out of the loop and put it back, without loosening the loop too much I think.

 

17038900777236809268391681141663.thumb.jpg.d18b481bc576bcaac970ef9e2d8b46f5.jpg

 

17038901939572987050098124375078.thumb.jpg.c72aa7ab80dd9a5fa52466c250fa54f0.jpg

 

The last part where the gun ports. I took some scrap 2 x 5 wood and oiled it to match the inner sides. I covered them with mahagony and painted them. I glued the hinges a bit off the center, to give the impression of real hinges. This is why I also added a small x-acto line to simulate a 2 part organ. You better be carefull with those, as they fly off tweezers easily and they give you only the exact amount necessary.

 

17038927124332386791440256465369.thumb.jpg.a232ea77559b1f8d9a7466d82b9adb7d.jpg

 

17038917569417430207732634597997.thumb.jpg.b9d72bdceb898c874ab87ce74953fb91.jpg

 

I did a 90 degrees bend, to compensate with the loss of space caused by the deadeyes placement.

 

17038918038891743615949543520387.thumb.jpg.5c7de810d9209474b8dae922828dd4b5.jpg

 

To finish off, I read somewhere that the gun port at the bow was only painted, to make it seem like they had more canons than they really had. In fact, it lines up with nothing, this door leads to a wall. Maybe this isn't true, I don't know.

 

17038924042526364918107024751557.thumb.jpg.54d8cd9126748d142a99ddf57f7821c0.jpg

 

17038925904877777217135598525968.thumb.jpg.eeffd40488a79b34aa030d6cb2ea41b6.jpg

 

I do not remember showing some pictures of, well, those. I don't remember the name of the entrances. I know some people put staircase on the hull that lead to them but occre doesn't seem to make us put them. Anyways, I glued mahagony strips there to cover the layer of the sides.

 

17038951344082791882829971136895.thumb.jpg.b4b0eed474439dfdb37fd1a34c242bc4.jpg

 

17038951813704971365722590738964.thumb.jpg.d1c09a98be5ec0f4d12f3679f5662801.jpg

 

 

One last thing, do you guys know how the canons on the HMS Beagle where rigged to the deck. Altough occre shows a way, it doesn't convince me that this was the way. Otherwise they would be moving back and forth on these ropes.

 

17038954054668815638326421995008.thumb.jpg.6f1cb09fda693c830fc952098a4c702d.jpg

 

 

Thank you all again for following me on this journey.

Link to comment
Share on other sites

On 12/29/2023 at 6:19 PM, Patrick B said:

One last thing, do you guys know how the canons on the HMS Beagle where rigged to the deck. Altough occre shows a way, it doesn't convince me that this was the way. Otherwise they would be moving back and forth on these ropes.

Companies like this don't care much about accurate details or rigging. That's a ludicrous way to lash down a cannon. One option would be to rig them at the gunports like any normal naval cannon. Guns could also be tightly lashed sideways, as in a severe storm or just for a ship that really didn't intend to need them very often (like Beagle). I went looking for a diagram for you and had some trouble, but this post on MSW shows one possible way to do it (click the link to see the drawing; the third illustration is what you're looking for).

 

 

Link to comment
Share on other sites

  Patrick, looking at your series of photos got me thinking on yet another way to strop a block to an eye ...  It seemed to work on a 4mm test block - it is an OcCre block that I worked on just a little to enlarge the hole and round the corners to make it look better.  The line was made with Chuck's 'Rope Rocket' and just 3 strands of brown Gutterman poly sewing thread.  'Could have used tan, but the batch was for Vasa to be rigged in brown.

 

image.thumb.jpeg.f35df96420474e176879f1a42d55b707.jpeg

 

image.thumb.jpeg.b46ff76107a11d1dab003efbc74cacbb.jpeg

 

image.thumb.jpeg.ce9edbe2358ba6f62a493d6e69f775f2.jpeg

 

image.thumb.jpeg.93417189d81991e78698f04420ecaea5.jpeg

 

 

Edited by Snug Harbor Johnny

Completed builds:  Khufu Solar Barge - 1:72 Woody Joe

Current project(s): Gorch Fock restoration 1:100, Billing Wasa (bust) - 1:100 Billings, Great Harry (bust) 1:88 ex. Sergal 1:65

 

 

 

Link to comment
Share on other sites

Thanks a lot Cathead, like you I struggled to find a diagram that put the canons parralel to the sides, like showed occre. This will be helpfull I'm sure.

 

I thanks Snug Harbor Johnny too for his idea, although these many twists seem harder than the half hitch I use.

 

I would like to use the most accurate knots in rigging my ship, but I struggle a lot with holding the knot itself, the working end and the block I'm trying to seize. Inevitably, I release one of the above, having only two hands. I cross my fingers that nothing will slip out of place and, with good luck I'm sometimes able to finish the knot.

Link to comment
Share on other sites

Small update here is a beam that will next be glued on the poop deck. The bend on the CNC machined plywood part was not fitting with my version of the ship. I tried straightening it But it broke in 2 different places. So I replaced it with some leftover wood.  Even after putting it in hot water it wouldn't bend. I decided to cut some slots to facilitate the process and mitigate the risk of breakage.

 

20240108_195800.thumb.jpg.c5f8a6d4e78f8bf396ffe6595a314263.jpg

 

In the end, I glued a small veneer strip from leftover wood to cover the holes.

 

20240108_200105.thumb.jpg.55f09ea7ab290cb417c9c2de326594a4.jpg

 

A bonus of that is that when I will dye it, it will come out the same color as the strips on the side, as it is the same wood as opposed to the plywood part.

 

I hope you guys had a merry holiday filled with time in the shipyard !

Link to comment
Share on other sites

On 1/12/2024 at 10:27 AM, JFMJr said:

Hello Patrick... My first build..Just starting the HMS Beagle...very helpful following build logs like yours. Looks great

2nd planking 1.jpg

2nd planking 2.jpg

 

Hi JFMJr, I'm happy to hear that my build log will be helpfull. Feel free to ask me questions, but keep in mind that this is my first ship, so I'm in no way an expert. Your planking looks neat, are you planning on making a build log? It still not too late. 

Link to comment
Share on other sites

  • 2 weeks later...

Hi guys, I have a question before gluing a piece in place. Do you know what was the purpose of the beam with a hole in it? I know it has two metal loops to attach some chain, but the hole seem a good place to put a flag pole. The instructions don't show you its purpose and I can't find anything on the internet. I'm sure someone here knows what it is, the time period associated with it, the history of it's name and the specific hole dimensions haha.

 

17065788707933331392943089615703.thumb.jpg.b626c407b5f21ab8166e79b652fbe9e9.jpg

 

17065789101233512559464705956754.thumb.jpg.37e1686f2a595c5947d7789e31afca08.jpg

 

Thanks, Patrick B

Link to comment
Share on other sites

The eyes on that piece are where they eventually suspend the anchor chains from (via some rope loops), but darned if I can tell why the wooden post has a hole in it. Can't be for a flagstaff, that would directly interfere with the rigging plan.

Link to comment
Share on other sites

  • 3 weeks later...
  • 2 weeks later...

Hi, I haven't posted in some time.

 

This is due to me procrastinating when I should take photos. In the last weeks, I worked on many different small thing on the deck. They didn't seem like worthwhile to make à post about. But when you add them up together, it makes a good chunk to show and talk about.

 

First, I made the rails with eyebolts and rope. It was quite tricky to get the knot at the right place for it to be tight. I also glued the back catheads after removing the char and making pulley holes in them. 

1710200595380171819452514194960.thumb.jpg.e6b2c0296384c2ab9ee2116f6e675ccf.jpg

 

17102006370356884712311247634461.thumb.jpg.6829f297e6e0f75eb63ccf3b9420bb54.jpg

 

17102006633281847860141789801991.thumb.jpg.0a07781f2beea7d5ee0352263d090de0.jpg

 

Then, I secured the launch to to deck, and I'm pretty happy about how that turned out. I was unsure about the rope placement after its knot to the eyebolt. I could have done concentric rings of leftover rope, but it looked weird. I chose to leave it clean after the knot.

 

17102010759625840677113004837840.thumb.jpg.a5104550be95730323dd7c04cf9ccec0.jpg

 

17102011508234375881429123914889.thumb.jpg.cff23bcffd6b9af675fa53d884c7b838.jpg

 

 As you might already have seen through the earlier photos, I made all the ladders, but I opted to leave them unpainted. I find it too Tricky to paint in all those tiny areas between the steps and I felt like this brass color fits the overall deck ensemble pretty well.

 

After that, I focused on the water pumps. I wanted to give an iron look but I failed and it looks too shiny and plastic. Still, it doesn't look too bad.

 

17102016857146518831904916757885.thumb.jpg.9359039c3d6dddfbb16c14e198a9ab71.jpg

 

17102017338323945537717209247766.thumb.jpg.211b9594480e6495e92ea7e20ead23cc.jpg

 

To finish off, I nailed the chain plates along the sides. To do that I placed temporarly the masts to get their angle right.

 

17102019438954351221927695595075.thumb.jpg.5644bb5f197326b22eddd65964ab72d5.jpg

 

 

I almost forgot, I also installed the chains at the stern, which drove me crazy. They were so fiddly and kept jumping off from my twizzers.  I lost 3 links and for a good 20 minutes I thought the carpet monster had stolen them but after a while, I found them at the complete opposite side of the room where I thought they were.  Those efforts were rewarded because in the end,  they look great.

 

17102025036591912744758837783638.thumb.jpg.5f226075706f2c6d7336bf7d6af468fa.jpg

 

17102025440517894996558968569814.thumb.jpg.1b6088e5b69295ecd5c3f7c026a9d06e.jpg

 

1710202580813872312177578755099.thumb.jpg.2b17782f3eb6b9331ccf726d984c375b.jpg

 

 

Thanks for following along guys. The next update will be about the storage compartments on the deck and maybe something else.

 

Patrick

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...