Jump to content

Garward

Members
  • Posts

    1,572
  • Joined

  • Last visited

Everything posted by Garward

  1. Deadeye from a kit are replaced: the bottom deadeye with a diameter of 5 and 6 mm from a pear covered with a black pigment
  2. The deadeye and chains installation on model of the Spanish linear ship of the second half of the 18th eyelid of Real Carlos (A sea museum in Madrid)
  3. Deadeye and chains arrangement on the real drawing of Montanes http://www.todoababor.es/vida_barcos/nav_74can.htm
  4. 14.4. Deadeye and chains installation The drawing from OcCre kit for the deadeye and chains installation (or as it isn't necessary to do).
  5. Thanks for a useful link!
  6. All necessary is listed practically !
  7. Hi, Gaetan! I think that about policy of NAVIGA, its rules and history it is better to you to look on their site http://www.naviga.org/index.php/en/?limitstart=0 NAVIGA include federations of a modelshipbuilding and modelshipsport from many countries, including Ukraine therefore the championships of Ukraine take place by the rules NAVIGA.
  8. Hi, Sjors! Successful travel to England, there is what to look!
  9. Wooden details are prepared for installation.
  10. The wooden detail is cut out by means of jig saw.
  11. Gall production. Metal details from a kit are replaced by the wooden.
  12. Hello, Paul, We have too yesterday, being the 1st of may and Workers Day, but also the second of May too the day off.
  13. If you use a varnish the varnish is more preferable to a covering of different parts of model, matt as you correctly speak.
  14. Hallo, Robert! Vielen Dank für die Bewertung! Many thanks for an assessment
  15. Hi, Tarjack, very difficult and very beautiful work! And the smell will disappear over time .
×
×
  • Create New...