  1. Following a two day AWOL from the shipyard, I was able to spend 6 hours in the shipyard today, as I took a day off work as we had new carpets fitted. I was amazed how much work I got done today.

     

    I completed fitting the brass profile to the forward section of the starboard side of the hull and then installed the forward channel and chain plates.

    post-7550-0-37794700-1426622828_thumb.jpgpost-7550-0-16706800-1426622859_thumb.jpg

     

    I then drilled the gun ports with a 2mm drill and dry fitted all the unpainted cannons.

    post-7550-0-91220900-1426622888_thumb.jpg

     

    With time still on my side I was also able to complete the assembly for gun port lids, noting I still have to fit eyelets 8 of these lids before I can fit and rig. All being well I can turn my attention to the port side next week where I have it all to do again.

    post-7550-0-09529500-1426622914_thumb.jpg

     

    When looking at the main mast channel I noted I may have a slightly hidden gun port when I rig the lanyard. I'm hoping the angle of the lanyard will not obscure the cannon too much.

    post-7550-0-28013200-1426622946_thumb.jpg

  2. Not going to be able to spend much time of Pegasus this weekend, as we're having to get house ready for new carpets due to be fitted early next week, plus yesterday I won two tickets from Epson to see the Man Utd v Spurs home game tomorrow, Epson are one of Man Utd main sponsors.

     

    I was planning to start planking the gun deck today, but the first task was to check the fit of the various deck items.

     

    The companionway hatch bottom edge had to be curved to follow the camber of the gun deck, picture showing all is OK following a bit of filing and sanding.

    post-7550-0-70870600-1426344260_thumb.jpg

     

    Also I had to curve the bottom edge of the three grating assemblies.

    post-7550-0-69922900-1426344290_thumb.jpg

     

    I then checked the fore mast bitts alignment

    post-7550-0-32005800-1426344324_thumb.jpg

     

    There was a bit of work to enable the lower capstan to sit nicely in the gun deck opening, dry fitted the quarterdeck to check to overall alignment of both capstan assemblies.

    post-7550-0-89029600-1426344385_thumb.jpg

     

    With both the upper decks dry fitted I decided to check the fitting and alignment of the three masts.

    Main  Mast

    post-7550-0-35916800-1426344414_thumb.jpg

     

    Mizzen Mast

    post-7550-0-43872000-1426344433_thumb.jpg

     

    Fore Mast

    post-7550-0-87791700-1426344451_thumb.jpg

  3. Hello David

    I am tending to work from left to right top row first, then mid row and finally bottom row. I just have 4 middle row gun port lids to fit, which I forgot were not fully prepared.

     

    I am going to complete all the starboard lids from stern to midships, I then have the foremast channel and chain plate to fit plus the brass profiles from mid ship to bow before I install the remaining gun port lids.

     

    I then have it all to do again on the port side. and hope to have it completed toward of end of next month when I can start with the production of the masts and yard assemblies

  4. Hello Jerry

    I'm using a method suggested by Shipyard Sid.

     

    Before the gun port lid is fitted to hull a length of thread is fed through the two eyelets, free of ca glue

     

    I then apply ca to the back edge of the lid and hinge and position the gun port lid and hold for a few seconds whilst the glue grabs. I then leave alone for 24 hours to ensure the glue is fully cured.

     

    Next I drill the two holes in the hull and feed each end of the thread into these holes and secure with a dab of ca. The thread is then cut in two, between the eyelets and each thread is then tensioned in turn against the eyelet and held firm with a small dab of ca, no knots or splices are used!!!!, The excess thread is then trimmed and I move on to the next lid.

     

    Once the gun port lids have been assembled it doesn't take very long to install and rig.

  5. I have been installing and rigging the gun port lids. The actual installation and rigging is not too bad, what seems the most time time is fitting the eyelets to the gun port lids prior to the installation

     

    I have also been fitting the rigols to the hull as well.

     

    Pictures of current state of play, I'm waiting 24 hours to allow the glue to dry before i complete the rigging.

     

    post-7550-0-71942300-1426105892_thumb.jpgpost-7550-0-97862600-1426105915_thumb.jpg

     

     

  6. I added a few more strengthening planks to the underside of the two half's of the lower gun deck near the bitts and mast holes but didnt take any pictures.

     

    I then marked out the lower gun deck fixing points and then glued into position, using map pins to secure the deck as the wood glue cures.

     

    The complete lower gun deck pin and glued

    post-7550-0-10553500-1425818693_thumb.jpg

     

    Close up of the bow end, the deck planking is visible through the companionway opening.

    post-7550-0-81205000-1425818739_thumb.jpg

     

    Picture showing midships

    post-7550-0-81604100-1425818779_thumb.jpg

     

    Not much more work planned for today as I will leave the lower deck deck glue to cure properly before I start with the deck planking next weekend, I may make the companionway coaming later today, using a simple box joint again.

     

     

     

     

  7. Build log index on page 1 of this log has been updated for easy reference to each build step undertaken, hyperlink link provide below.

    Build log index

     

    I did manage small amount of time working on HMS Pegasus today.

    The first task was to plank the lower deck which may be seen through the main gun deck companionway opening.

    As this is a small area I did not bother with any special effects (caulking, treenails, etc.) or any shift patterns.

    post-7550-0-30151800-1425750671_thumb.jpgpost-7550-0-85148900-1425750695_thumb.jpg

     

    HMS Victory, with all guns out, is protecting the HMS Pegasus from unwanted invaders. As can be seen I'm currently rigging the gun port lids on HMS Victory.

    post-7550-0-15800900-1425750719_thumb.jpg

     

    As the gun deck is quite thin I decided to add some strengthening strips under the center line in the unsupported areas using some 5mm wide by 1mm thick strips.

     

    Underside view

    post-7550-0-68302500-1425750741_thumb.jpg

     

    Top View

    post-7550-0-67138500-1425750771_thumb.jpg

     

    I understand, for this build, each plank length for a 3 butt shift pattern needs to be 66mm long, with a 22mm offset between each run. I have therefore drawn the necessary guide lines on the deck prior to fitting, looking for the best place for the deck plank joints with respect to the gun deck openings.

    post-7550-0-63333500-1425750814_thumb.jpg

     

    Once the two half's of the gun deck has been installed I will fit the first deck plank over the joint to add additional strength. I plan to adhere to using 66mm long planks over the center line,

     

    Picture showing a drawing on the 3 butt shift arrangement and center line. For the sharp eyed you'll note I did draw one line in the wrong place!

    post-7550-0-48364900-1425750840_thumb.jpg

  8. Fitted the first channel tonight. It was much harder task to fit the chain plates than I was expecting.  I even managed to knock of the gun port lids - I now know it is better to get the channels fitted to hull before the gun port lids.

    post-7550-0-92548400-1425415771_thumb.jpg

    post-7550-0-49614700-1425415804_thumb.jpg

     

     

    I have also drilled some of the holes in readiness installation of the remaining cannons which I have dry fitted

    post-7550-0-07693800-1425415847_thumb.jpg

     

    Picture of work in progress

    post-7550-0-04360200-1425415872_thumb.jpg

     

×
×