Jump to content

Recommended Posts

Posted

Moved to scratch build forum.

Jeff

 

In progress:
Medway Longboat 1742 - Syren Ship Model Company -1/2" scale

USS Constitution - Model Shipways - Scale 1:76

HMS Granado - CAF Model - 1:48

HMS Sphinx - Vanguard

Posted

Hi Richard,

 

Here's the instructions on how to upload photos:   

 

Mark
"The shipwright is slow, but the wood is patient." - me

Current Build:                                                                                             
Past Builds:
 La Belle Poule 1765 - French Frigate from ANCRE plans - ON HOLD           Triton Cross-Section   

 NRG Hallf Hull Planking Kit                                                                            HMS Sphinx 1775 - Vanguard Models - 1:64               

 

Non-Ship Model:                                                                                         On hold, maybe forever:           

CH-53 Sikorsky - 1:48 - Revell - Completed                                                   Licorne - 1755 from Hahn Plans (Scratch) Version 2.0 (Abandoned)         

         

                                                                                                                                                                                                                                                                                                

Posted

Please do go with the jpgs.  I agree, most folks will not open the attachments.  When I attach a jpg here , it takes the same as a pdf, a second or less.  

Thanks!

Allan

PLEASE take 30 SECONDS and sign up for the epic Nelson/Trafalgar project if you would like to see it made into a TV series.   Click on http://trafalgar.tv   There is no cost other than the 30 seconds of your time.  THANK YOU

 

  • 3 weeks later...
Posted

My take on porthole construction:

 

1. I like the approach of previous posts that used templates for the construction of framing about the portholes (see photo)

2. First I cut the sill slots on one frame only. 

3. I trim the next frame (base of sill using the template to determine where to cut.

4. Temporarily setting the outside frame against the sill base, I mark the cut positions, remove the frame and perform the sill cuts. 

5. I set and glue one frame spacer into position and clamp (see photo). 

6. After the glue is set in step 5, I glue the short frame upright over the middle of the sill  and the final spacer into position. I use home made clamps fabricated as described on p.44 of "The Anatomy of Nelson's Ships" by Longridge. I find these clamps to be the most versatile.

 

There is some conflict with the frame positions on the building board, but I chose to use the positioning dictated by the templates which conform to the NMM plans.

 

 

 

 

20201010_145627.jpg

Porthole 2.jpg

thumbnail.jpg

  • 1 month later...
  • 4 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...