Jump to content

Recommended Posts

Posted
28 minutes ago, aydingocer said:

Thanks a lot once again Glenn. So if I see correct you have tied them directly on the bowsprit itself, not to the blocks.

001.JPG.412e87d86da20a7dc71b963e4b998b86.thumb.JPG.0e3d6b75298a0a896828973ec5dbef83.JPG

I added 4 blocks to the end of the bowsprit. All the other rigging was looped with a hitch type knot.

 

The first photo shows the 4 blocks and other rigging at the end of the bowsprit

001.thumb.JPG.fa431e130a57c5d8421cbcafb029915a.JPG

The next two photos shows the block rigging. The top block was used for the red arrow (stay). The left and right blocks (yellow arrow) were for the braces. The bottom block (green arrow) took the rigging line that sets the position of the yard along the bowsprit. Hope that helps

002.thumb.JPG.3b4aedebc96d6463bd86be59f0262e90.JPG003.thumb.JPG.1f308cca8d181543c9e0f6eda3435bce.JPG

Glenn (UK)

Posted
5 minutes ago, Glenn-UK said:

I added 4 blocks to the end of the bowsprit. All the other rigging was looped with a hitch type knot.

 

The first photo shows the 4 blocks and other rigging at the end of the bowsprit

001.thumb.JPG.fa431e130a57c5d8421cbcafb029915a.JPG

The next two photos shows the block rigging. The top block was used for the red arrow (stay). The left and right blocks (yellow arrow) were for the braces. The bottom block (green arrow) took the rigging line that sets the position of the yard along the bowsprit. Hope that helps

002.thumb.JPG.3b4aedebc96d6463bd86be59f0262e90.JPG003.thumb.JPG.1f308cca8d181543c9e0f6eda3435bce.JPG

All clear! Thanks a lot!

/Aydin

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 125: 3 hrs / Total 272 hours

Photos 779-780: Bowsprit rigging complete (from Rigging Plan Sheet #3) before starting with the ratlines.

IMG_2206.thumb.jpeg.0ca3458b8cdb81a39d54a19449cfcafa.jpeg

IMG_2207.thumb.jpeg.5a0af25fcf9eeffc7b4e3861aa797549.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

Thanks for sharing your build, it is nicely done!  I have a question about the stay you show in the photos in post #331.   The upper most stays did lead through a block at the end of the jib boom as you show  and is as described by James Lees in The Masting and Rigging of English Ships of War for your era but would the line be a tarred line (dark) or untarred, (tan)?  It seems lines that were tarred did not usually run over sheaves but maybe that is an incorrect statement.  I have noticed this on other builds lately and have not been able to find or remember seeing any information on tarred lines running over sheaves in blocks or bees or other instances. 

TIA for any contemporary based information anyone can share.  

Allan

 

Edited by allanyed

PLEASE take 30 SECONDS and sign up for the epic Nelson/Trafalgar project if you would like to see it made into a TV series.   Click on http://trafalgar.tv   There is no cost other than the 30 seconds of your time.  THANK YOU

 

Posted
14 hours ago, allanyed said:

Thanks for sharing your build, it is nicely done!  I have a question about the stay you show in the photos in post #331.   The upper most stays did lead through a block at the end of the jib boom as you show  and is as described by James Lees in The Masting and Rigging of English Ships of War for your era but would the line be a tarred line (dark) or untarred, (tan)?  It seems lines that were tarred did not usually run over sheaves but maybe that is an incorrect statement.  I have noticed this on other builds lately and have not been able to find or remember seeing any information on tarred lines running over sheaves in blocks or bees or other instances. 

TIA for any contemporary based information anyone can share.  

Allan

 

Thanks, that’s for Glenn to answer I guess. 

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

Build days 126-128: 4,5 hrs / Total 276,5 hours

 

Photos 781-782: Pendants complete, before starting the shrouds. Spent a total of 4,5 hours spread into three days. Some photos showing their preparation and in place.

IMG_2209.jpeg.59ffbf4413204e8c4cf1ca1b33eee90c.jpeg

IMG_2213.jpeg.25b7e249d5d5a34bdcec265e41409cb5.jpeg

 

IMG_2210.thumb.jpeg.74088218c0b2953e3070bf515e6865d6.jpeg

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 5 weeks later...
Posted

Build day 129-132: 9hrs hr / Total 285,5 hours

Photo 783: It's been a while since my last post. Continuing with rigging. Lower shrouds complete after 9 hours of work spread into 4 build days.

IMG_2304.jpeg.562c13621146f03ecf698fcb6a11c79b.jpeg

 

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 3 weeks later...
Posted (edited)

Build day 133-138: 11hrs / Total 296,5 hours

 

Photos 784-792: More progress after 11 hours of work in 6 build days. With this work I have completed

- Catharpins and futtock shrouds,
- Upper shrouds.

I used mini clamps and crocodile teeth to help align the threads while I am knotting. 

 

IMG_2310.thumb.jpeg.12d9df19dd1791195d25b5f797da40d3.jpeg

IMG_2315.thumb.jpeg.a2677206cbb4de923e330643fc53b0a2.jpeg

IMG_2316.thumb.jpeg.7bf3d91830d99fcbcc450ed4bd76f12f.jpeg

IMG_2317.thumb.jpeg.22c2764e1886d23355394d0d31cd8bc1.jpeg

IMG_2319.thumb.jpeg.a9c2197a7d0fbae12e6c5a5419ff65ae.jpeg

IMG_2324.thumb.jpeg.f7bd95e20d486dd807f6e6eb57b8aa01.jpeg

IMG_2340.thumb.jpeg.58182dfb1ffef44bd8f9ddf34a2592d3.jpeg

IMG_2341.thumb.jpeg.c71349d82077a9482d4d07c930442241.jpeg

IMG_2342.thumb.jpeg.33586875a38642564337e03bdb1ca3dc.jpeg

 

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 1 month later...
Posted (edited)

Build day 139-141: 3,5hrs / Total 300 hours

With the first build days of 2024 I am setting the milestone of 300 hours 🙂.

I know I have not been very active with this build lately but winter time comes with its own busy days - work and holidays.

 

Photos 793 - 797:

 

Next job is to rig the ratlines. I made the guidelines on a piece of paper as suggested in the instruction manual, to help with aligning the ratlines at a spacing of 6mm. Then I secured the paper to the shrouds from the top with a tape.

 

IMG_2423.thumb.jpeg.6265a0d553edb3aa8d7cb2c6a81ac81a.jpeg

 

I know I am not an efficient user of threads, I need a lot of slack to work comfortably. I am sure the amount supplied  (on the left) will not be enough for me so I bought myself a roll of the same size from the shop.

 

IMG_2427.thumb.jpeg.3d60230457bfca8141583b18c1c0e3fb.jpeg

 

Some photos of progress. I started from lower mizzen mast. Then I will continue with the lower ratlines of mainmast and foremasts, before moving on to upper ratlines. I made the knots as described in the plan and once all the ratlines are done, I secured the knots by applying a diluted PVA glue with the tip of a tiny paint brush.

 

IMG_2428.jpeg

IMG_2430.jpeg

IMG_2431.thumb.jpeg.3b104ee3bfff0e7710d00da2deff8494.jpeg

Thanks for watching!

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 1 month later...
Posted

Build days 142-148: 13,5hrs / Total 313,5 hours

Working time to time from Jan 17th to Feb 25th, after 13,5 hours spread in to 7 build days, the ratlines are finally ready. Next step is to add the details (shroud cleats etc)

 

Photos 798: For documentation, one photo showing the status:

IMG_2510.jpeg.437510b294adae1a7e7ccb2681c345c5.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 149: 0,5hr / Total 314 hours

Photo 799: Preparing the shroud cleats for installing on the lower shrouds and some of the top shrouds.

IMG_2512.thumb.jpeg.2c0c8b4e04b84c14c226d2810f276dbf.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 3 weeks later...
Posted

Build day 150: 1,5hr / Total 315,5 hours

Photos 800-802: Started tying the shroud cleats to the shrouds, using 0.1mm thread. 12 of them done in approximately 1,5 hours.

IMG_2542.thumb.jpeg.be59301a636c3cac66589e7ffc8bcb5a.jpeg

IMG_2543.thumb.jpeg.92f7d9f800b18fd8bb4bb23010359936.jpeg

IMG_2546.thumb.jpeg.73dcf5f26557722cfe56104fa8d91c64.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 151: 3 hrs / Total 318,5 hours

 

Today I did about 3 more hours to finish all the shroud cleats. So it tool altogether 4,5 hours

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 152: 1 hr / Total 319,5 hours

 

Photos 803-807: Lower main stunsail booms had been pending for a while. Before moving to yards' installation, I decided to get them out of the way. I tapered them using my hand drill usual way until they dry fit nicely in their places.

 

IMG_2551.jpeg.2df0cb2bf5880eda3cb2cd65689e2ee5.jpeg

IMG_2552.jpeg.c3c388c2c68927299ef82d97508daf82.jpeg

IMG_2553.jpeg.5335930cdb71ac4c212dc247c51e203c.jpeg

 

Dry fit:

IMG_2554.jpeg.c9d5028d65efcdd6e9536727767237fe.jpeg

IMG_2555.jpeg.5c9a27bbd87ddd688da834b1d2bec286.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 153: 0.5 hr / Total 320 hours

 

Yard installation starts. I am installing them in the order I had numbered. The first one happens to be the Mizzen Topgallant Yard. I fix the yards to the masts using a nail, then rig it to the place.

 

Photos 808-809:

IMG_2563.jpeg.398aece0e8b6157b19d9782d427d68db.jpeg

IMG_2564.jpeg.35a4ee6e94c70b478a6c66ca2a92351b.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 154: 4 hrs / Total 324 hours

 

Yard installation continues. Some use just threads, some use parrel beads on thread, and some use parrel beads with parrel ribs on thread in order to tie them to the masts. They are instructed in the plans.

 

Photos 810-812: The next 3 photos show some details how I installed parrels with parrel ribs and then their place. I have already used nail and glue to mount the yards and reinforced them with a black thread. This makes rigging the thread with parrels to their place much easier as you don't worry about actually holding the yard with them. 

 

IMG_2565.thumb.jpeg.5f644a3e31afd975ab6e6ad83db694c7.jpeg

IMG_2567.thumb.jpeg.4ab9852323ab9f84e1bd75348a8277f9.jpeg

IMG_2569.thumb.jpeg.30ab9ac6487f9fb67c30479983a14142.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

 Photo 813: Mizzen gaff with parrel beads around the mast. (Behind you see the stern ensign post, which I accidentally hit with my hand and broke, waiting to be repaired  - what a disgrace 😆)
 IMG_2570.jpeg.c47e0476e7d893fcd48176edb241872e.jpeg

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Photos 814-815: Here is how I worked with threads, which use only parrel beads: Fix the thread on the yard in one end and add as many beads as you need from the other end. It was much easier to work this way than installing an already prepared thread with beads, in which case the beads kept dropping while trying to get the thread ends back and forth through intricate spaces. 
IMG_2574.thumb.jpeg.afd8be7970ad1d703bc2ff25a1a14871.jpeg

IMG_2575.thumb.jpeg.92c577284b6e737afe1603906c89cf33.jpeg 

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Photos 816-817: I wanted to try hanging weights in the center of these threads to give them a more realistic curved shape. I soaked them with water using a brush to help somewhat maintain their shape once they have dried (the 2nd photo). They will stay there as long as they can. I hope it helps. 
 
IMG_2576.thumb.jpeg.3cf4de8f051d10b5d3c671b76eea5f7a.jpeg

IMG_2578.thumb.jpeg.a3168c44ae0fc8e7ae7e27bdb116e3d3.jpeg

 

That's all for today! Thanks for watching!

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

Here is my rigging progress. Not quite done, but getting there!

 

Fit masts
Rig lower shrouds
Rig upper Shrouds
(IN PROGRESS) Fit the yards (not rigging them yet)
Fit the crossjack sling to the crossjack yard (at this point for accesibility)
Rig the mast stays
(Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
Add the Crowsfeet to the mast tops
Rig the back stays
Rig the yards
Fit Sheets and Tacks
Fit the Main Stay Tackle (but do not lash them yet)
Rig the Yard Braces
Fit the ship's boats
Lash down the Main Stay Tackle and Fore Hatch Tackle

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 2 weeks later...
Posted

Build day 155: 5 hrs / Total 325 hours

 

Installing Crossjack Yard and Main Yard. Below I share the process of rigging the thread structure for mounting the Main Yard, as good as I understood from the plans. Last two photos show the yards in place with their thread fittings. I used nails here, too, to mount them strongly in place.
 
Photos 818-823

IMG_2601.thumb.jpeg.109cab8c2b33b657208f7e6337632c2e.jpeg

IMG_2602.jpeg.e46a42832bde199c057c772d13fd787e.jpeg

IMG_2603.thumb.jpeg.c687e706e098f95bca456b09e8faa343.jpeg

IMG_2604.jpeg.c5e2b413703be0710e059ec1488e3bf2.jpeg

IMG_2605.jpeg.876ed7b293824f577f75c6ece91fdb34.jpeg

IMG_2606.jpeg.c290ba801d2d77a480011882e3e29b05.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 3 weeks later...
Posted (edited)

Build day 156-157: 1,5 hrs / Total 326,5 hours

 

1,5 hours of more work and fitting of the yards are complete. Now I can tick the 4th item in my  checklist:

Edit: I have Crossjack Sling also in position. So, 5th item is also ready.

 

Fit masts
Rig lower shrouds
Rig upper Shrouds
 Fit the yards (do not rig them yet)
 Fit the crossjack sling to the crossjack yard (at this point for accesibility)
Rig the mast stays
(Omit Main Stay Tackle and Fore Hatch Tackle at this stage)
Add the Crowsfeet to the mast tops
Rig the back stays
Rig the yards
Fit Sheets and Tacks
Fit the Main Stay Tackle (but do not lash them yet)
Rig the Yard Braces
Fit the ship's boats
Lash down the Main Stay Tackle and Fore Hatch Tackle

 

A photo for the record:

Photo: 824

IMG_2681.thumb.jpeg.8a462ac381f8f91b3650970a2db5cf78.jpeg

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 2 weeks later...
Posted (edited)

The order of steps recommended in the instruction manual slightly differ from the numbering in the Plan Sheets. I have now studied the plans and instructions once again in detail before moving forward and came up with my updated reference task list. I don't want to make irreversible mistakes at this moment. Hence I will go with this order:

image.thumb.png.9e6bd2c5754b350c86f509b60335c65b.png

 

 

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

Build day 158: 1,5 hrs / Total 328 hours

Today I started to work on the stays, completed the parts I marked with a red X. I have added several photos showing the steps in detail.

 

Photo 825:

IMG_2724.thumb.jpeg.70f06cc98c2c9f31a25f72bdcaf5f6ba.jpeg

Photos 826-837: The "upper" stay (indicated with "G" type thread in the plan screenshot)

IMG_2709.thumb.jpeg.dbd19eeb2da2e15c693db754ead2c972.jpeg

IMG_2710.thumb.jpeg.6dfe0a5f18268b402ce8c779c21b1026.jpeg

IMG_2711.thumb.jpeg.86d69b6de374b1deba545d07f37d4808.jpeg

IMG_2712.thumb.jpeg.0b93e7bce230b8f0345308e387eff9f2.jpeg

IMG_2713.thumb.jpeg.e215423ed2a0812a147b203ca42aabfb.jpeg

IMG_2714.thumb.jpeg.9d9eebac36d5dfda6fb85406c7fb9505.jpeg

IMG_2715.thumb.jpeg.6b6f7a560b9be83d97e2c3abde9ed614.jpeg

IMG_2716.thumb.jpeg.bebcef1841fd7f437d03ede26400b355.jpeg

IMG_2717.thumb.jpeg.a0a6dae4fc3414bdf867f9e556c49c93.jpeg

IMG_2718.thumb.jpeg.5f5e157b605903cf8dee2435f11a7919.jpeg

IMG_2719.thumb.jpeg.15ac9ed64b412aab1c3aa3b1bf0f0289.jpeg

IMG_2720.thumb.jpeg.d240e7ce3d494b0251f1e137b05d42f7.jpeg

Photos 838-840: The "lower" stay the (indicated with "H" type thread in the plan sceenshot)

IMG_2721.jpeg

IMG_2722.jpeg

IMG_2723.jpeg

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted (edited)

Build day 159: 1 hr / Total 329 hours

Photo 841: With the below, Mizzen stays are complete (except the Crowsfeet which come later). 

IMG_2726.jpeg.7f65115a3b2e1fb2babe04e65706c299.jpeg

 

Photo 842: I noticed the instructions for how to loop the thread around the masts too late for Mizzen stays. I had made them my own way (check the photo above), though not looking too bad. I hope to follow the instructions for the Fore and Main stay collars.

IMG_2727.thumb.jpeg.9f17d6ad806d9c904c37479008383e45.jpeg

Edited by aydingocer

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

  • 3 months later...
  • 3 weeks later...
Posted
On 8/20/2024 at 3:27 PM, Clark said:

Anything new?

I know I haven't been around for a while. I injured a finger beginning of the summer and it is still recovering.

Can't wait to resume!

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Build day 160: 1 hr / Total 330 hours

 

Hand is better, now resuming my build little by little. Moving on to Main Mast Stays after having completed the Mizzen Mast Stays.

Moving top to bottom, next it is the Main Topgallant Mast Stay:

 

Photos 843-845: Rigging the collar around the mast

IMG_3320.thumb.jpeg.7ce7fc151a635b81ed58495d0f946247.jpeg

IMG_3321.thumb.jpeg.a0bad381cb10a91c55cb5b76e241760f.jpeg

IMG_3322.thumb.jpeg.b3d04073d0bff7dda779ef4109bcdbed.jpeg

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Posted

Photos 846-851: Rest of the rigging, with a snapshot of the plan to give you an idea what I am doing:

IMG_3323.thumb.jpeg.209ec209717d89f7a928257943a1e95a.jpeg

IMG_3324.thumb.jpeg.1ce33a85d7a9ad22860585c9e6966c75.jpeg

IMG_3325.thumb.jpeg.5ab3b807ba37acec70f110b4e899e3d8.jpeg

IMG_3326.thumb.jpeg.984259b7acb2bc1bb7e35fd1eb1d7be3.jpeg

IMG_3328.thumb.jpeg.95576974cfd585a7da8fbe41148c8e96.jpeg

IMG_3330.jpeg.3f01ccc96cb04fecb4e14ea2b5dcdd70.jpeg

 

Current :

HMS Sphinx by Vanguard

-------------

Completed:

Orient Express Sleeping Car by Amati

Bluenose II (Artesania Latina)

Istanbul Tram - Occre

Bluenose II - Artesania Latina

Bosphorus Sandal Fishing Boat

Riva Aquarama - Amati

Titanic - Mantua

Bosphorus Fishing Boat - Tersane Model

San Juan Nepomuceno - Artesania Latina

Bluenose - Billing Boats

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...