Jump to content

Recommended Posts

Posted

C33B0792-3E55-454A-BC42-61493F37C479_adobe_express.thumb.jpeg.516bf9780ccf1196bf981ea171f9c895.jpeg

 

Slow start on the Pram. On the beginning, I was a little confused about the beveling of the transoms. I just couldn’t visualize it until I went through past build logs (that I had read earlier but didn’t have the question then). 
 

2FEC63BB-6D65-43D8-9C90-BAFDC657969F_adobe_express.jpeg.92134841ee295f1a050e8d714158f506.jpeg

 

586EF378-F65C-490C-A0DC-D933382D3AA3_adobe_express.jpeg.14ab9c37e60346527dc53a57be5cee43.jpeg


The bevel guide took a minute for me to figure out.

 

A59F0B82-E43E-4286-8495-B2FFE6A2FEF8_adobe_express.jpeg.12eb3513c5b4ad097ebbe6a503a25cee.jpeg
 


1BD6B278-222E-42EC-8BF4-84DB984053F8_adobe_express.jpeg.a0d6dbdd66548cc064554cd65da452d6.jpeg

 

 

Placing the stern knee on the lower stern transom, I noticed the knee extended further then the image in the instruction manual. I’m back to the trusted past build logs looking for the perfect image I need to see.

 

786BC2FC-CBD6-44BB-9680-7AE69F671CFF_adobe_express.jpeg.1c1243497ff7cdf76d8b272c12e9d503.jpeg

 

Now I need to purchase a bench vice before I begin to bevel the transoms and drill through the bow knee.

 

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

While I was waiting on the bench vice,I beveled and tried my best the rabbets on the planks that got them. Wanting to bend them but the transoms weren’t  ready for the build board. I was trying to scale the curve so I could make a jig to bend them when I heard a voice from my late father, “ if you keep touching it you’re going to mess it up.”

 

7F390025-9EFD-4FD9-8B95-CEC29620DE13_adobe_express.jpeg.5086ba524681a678142cea95ef36bf3a.jpeg

 

9EF16707-A1EC-4277-AD93-EE17A0E41B43_adobe_express.thumb.jpeg.62d099502852c161cd95a77ccda73a35.jpeg

 

Completed both transoms 

 

66256A8E-C9B9-4518-968E-C6927D9DEA11_adobe_express.jpeg.5c55caffd0c472d91e92adad454a2d38.jpeg

 

C46EC3BD-F98B-4A2D-9105-2BD47E808172_adobe_express.thumb.jpeg.8c5b66f5d9e8f3931713a018a81950b3.jpeg
 

7F3D8373-B588-4A1C-BE12-2B222247908B_adobe_express.thumb.jpeg.87ce938e0ff328d488e17099fb13b74d.jpeg

 

Soon after I glued the bottom planks I noticed the stern had an issue.

 

0D875EB8-47E0-4484-A495-A2C78978AA28_adobe_express.jpeg.aff2720b4104562365ba523d728a3b0d.jpeg

 

 

I cut both bottom planks and the keel plank loose from the transom. Then sanded the bevel and held the transom up until I got it clamped.

 

15B345D5-CF86-45F4-BEF6-3FC2A7C82D95_adobe_express.jpeg.36ee366626aeb53a53c4f2936da09fba.jpeg

 

 

7C8B103D-8EC4-465F-B2A8-48D142660162_adobe_express.jpeg.4ed771c8b840ce5793d0740c5ba9c700.jpeg


D09300EB-5993-4EF4-986E-CEBE8DD8FC41_adobe_express.thumb.jpeg.56456e420e413c5fc973e2dca6bfbd18.jpeg

 

Soaked and bent the next plank.

 

5E3C0BCF-18F6-40CE-BDED-DFC04CB129B1_adobe_express.thumb.jpeg.95b8351714349ab3a5d10b9362fcaf74.jpeg

 

 

 

 

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

  • 2 weeks later...
Posted (edited)

Hello from middle Tennessee. Planks are fitting well bending them in the jig. I have had some issues identifying which side of the plank to bevel or rabbet. I used mini wooden clothes pins to clamp the garboard and the second plank.

 

B6A5F24F-0085-4AB4-ADE7-C861D24AD371_adobe_express.thumb.jpeg.170302d1cdd730b1947153cffe5543e5.jpeg

 

Then on the sheer plank there wasn’t enough room for the clothes pins. I drilled small holes in reg. size clothes pins and pulled a rubber band through using a small wire. I looped one end through the other to make an adjustable clamp.


1934863A-7CC2-4671-8BBF-5DFE347BAF54_adobe_express.jpeg.f745019bd6711556d90287421a07c85c.jpeg

 

F0668E11-1804-4775-B399-1E4BF4B410CE_adobe_express.jpeg.2f46fcbb16bdf1776cfc035ea18e66e1.jpeg


5999186B-95BC-427B-B781-706A501F7228_adobe_express.jpeg

 

I noticed a misalignment when looking over the Pram after all the planks were installed.

 

69B4EB42-5229-421B-9D1F-BDC8F1389A3E_adobe_express.thumb.jpeg.b4e27b8afc9f2eba94221a5a892115ad.jpeg
 

 

After placing the skeg and bilge keels the hull was removed and the dagger board case was assembled and installed. The first frame was #3. I used the tick strip given in the manual to place it. After marking for frame #2 placement I used a scrap stick to measure both sides to square it to #3.

 

E80427FE-7584-491F-AFC3-E5A83ECCCAA3_adobe_express.jpeg.11abebaa9bf0e11890dd8a30c5556018.jpeg

i decided to bend the inwales like I did the other planks and then cut them in the appropriate position of the boats curve.

 

6A48EB40-C9C8-4D0D-8085-7B7A4AB567B5_adobe_express.jpeg.0d6a58ab9e269a5a8ed1766c65b787af.jpeg

 

I fitted both stern and bow quarter knees.

 

20B369F1-CECE-4501-AD10-8F1F8CE9D4DB_adobe_express.thumb.jpeg.fc265e856f821c213da8913c3d690a53.jpeg

 

After placing the first pair of thwart frames, I thought it would help me best to fit the thwarts as I go. After one pair was installed, I placed the thwart on the pair and slid the other under so I could mark were I needed to glue it.


6FC8FF07-E969-48E5-9706-56C201C8573C_adobe_express.thumb.jpeg.0336e3082df387c8d77cb90687d15274.jpeg


I repeated this for the other frames.


D3D64D2C-EC6B-4E01-A225-619188BBD573_adobe_express.jpeg.d71df8e68903efc498bbf58e3a7b1a40.jpeg


90A965DB-A056-445A-AAD7-ACD4AC925A12_adobe_express.jpeg.8d74fbecf919e70056735ae9d70f968a.jpeg


ECB17A3D-AABA-4FD8-B067-FAF974D53FB5_adobe_express.jpeg.26d5f77b18309fdb76cc792d7e51d330.jpeg

Not excited about the instructions saying to boil the small floor cleats. I again turned to my bending jig for an option.

 

DC839257-CCEB-43F8-A422-E6FB94B90691_adobe_express.jpeg.b55a5c77a01cbf530f95fa9c145e7d7f.jpeg

 

68F4D31A-2B4D-4352-A321-EBC4EF46089F_adobe_express.jpeg.b5af7e58b2058f9fe8a6d3464696a908.jpeg
 

And that brings us to the present. 


73ADF24D-3BCC-4550-AAF1-F8DDFA2EC85F_adobe_express.thumb.jpeg.3112289ce87ed944b2d8fc75de92352a.jpeg


 

 

 

 

Edited by Bryan Woods

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

Very nice work, Bryan, and an excellent build log as well. I look forward to following your progress.

Bob Garcia

"Measure once, cuss twice!"

 

Current Builds: 

Hms Brig-Sloop Flirt 1782 - Vanguard Models

Pen Duick - Artesania Latina 1:28

 

Completed: Medway Longboat 1742 - Syren Ship Model Co. 

Member of the Nautical Research Guild

 

 

 

Posted
1 hour ago, BobG said:

Very nice work, Bryan, and an excellent build log as well. I look forward to following your progress.

Thank you for the encouraging words!  

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted (edited)

Hello builders, we all think of different ways to accomplish our needs. Here  is a small example I’m going to share.

 

56AFB18D-F496-4CAF-B4DD-CB4DA47BD4EC_adobe_express.thumb.jpeg.2d1b8d0c489051af8d1a7787391f4418.jpeg

 

I cut the shape of the molds on the build board in a small box to make a stand for the work inside the hull.

 

E01DEB49-CDF4-4999-B221-6E7D635EC10E.thumb.jpeg.03793c5629b9e37e16c960fdedaa874a.jpeg

 

I’ll be honest the steps after the planking have had me out of my comfort zone. I left off bending and cutting the floor board cleats. I was supposed to use 3/16”x 1/8” stock. I looked, picked ,soaked ,bent, cut and glued the 3/64”x1/8” stock.

 

E87F7FF7-2E6A-4E45-B0A3-BF4B484982E6_adobe_express.thumb.jpeg.bcf9fa7ed72f1fd0575306c47998223f.jpeg

 

7E5D2B72-075F-410E-A678-53A54C323FDE_adobe_express.thumb.jpeg.b1ddf655df1fdcbd695c2707180962c0.jpeg


I wonder how  that’s going to work for the floor boards? I can’t wait to see.

 

CC7AB5E2-42A2-44CC-AF23-9CC4425E1FDE_adobe_express.jpeg.89441cdb36c0809079b76284110ad7c4.jpeg

 

I’m going to temporarily stick the floor boards on so I can see if I can recover without backing up.

 

C4A67E34-87ED-40F9-B494-E33829F3C795_adobe_express.thumb.jpeg.97d6dcbafc2abf8460e178438c07b80e.jpeg 
 I had to shorten all the boards for them to rest on the half size cleats. I think I can live with the change. Now wondering what I’m going to use for the rub rails. 
 

F722BF44-656F-4F85-B925-7014B8FB8774_adobe_express.jpeg.14d623a97606cb7c794845de66114266.jpeg

 

I’m no different than everybody else wondering why both boards for the mast step have holes. I just glued them both and plugged the bottom with a cleat that helped me place it between the frames.

 

D7F940B9-D518-47E6-A078-DC3EF89DEAAA_adobe_express.thumb.jpeg.158123f8b0549c5678435498d1609fce.jpeg
 

 

53FC06BE-69F6-410C-B59B-23A7DC2C9628_adobe_express.jpeg.fedd37c9b9ae08bc889b5d6c393b6342.jpeg

 

929C63C9-6222-4398-9AC8-AC40035C2C3B_adobe_express.jpeg.8f66797271f94cafd3553e4a6ce64af6.jpeg

 

8848BDF5-131D-4E6C-946B-9A001D465B91_adobe_express.jpeg.8e7553087c405d831b6b2c8bdff2bed8.jpeg

 

Not my favorite tool but careful biting one tooth of the saw to slowly cut through the inwales.

 

9EBDDD9C-9CA6-4B1A-BF19-5F19E8813CFF_adobe_express.thumb.jpeg.d8c6c3c3b39d2fd90872dfcf1bea7d3f.jpeg

 

67DAA5E0-697C-44BF-BC5A-4F2B2031B985_adobe_express.thumb.jpeg.f3503a67900ad08de870daa18971f59c.jpeg

 

BB30610F-FA86-4DB9-8BF3-B4BF01BE2A28_adobe_express.jpeg.cc799b6065df9ef2be0ad9ad558292d4.jpeg
 

I used two of the sides of a plank sheet to make the rub rails. I put the factory cut edge down and the uneven edge at the top so I cut it down level.

 

197F8CCF-CD99-40F0-85AE-CF26ECE46EDF_adobe_express.thumb.jpeg.3a1455ed8d8a32b0d0c3095e205b8df7.jpeg

 

E25E5A63-264D-489A-BC7D-3A2CCFAF214D_adobe_express.thumb.jpeg.0aeca393b503eaa9ce07c4a7a26dc7e4.jpeg

 

The hull is ready for some color.

 

94717A82-A474-4E65-BC19-041603D32EBD_adobe_express.thumb.jpeg.4374e860a0ae2c79cff50200cf7dd390.jpeg

 

 

That’s all the progress for the last week, I did find a decade old Mindwest display cramped between other materials at my local country hardware store.

 

5ACF8CC6-6D19-42B7-A5F1-075FABB026AC_adobe_express.thumb.jpeg.e05cb7962a1bdd900e3328691c6d0cff.jpeg

 

They had no idea they even had it.

 

 

Edited by Bryan Woods

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted
5 hours ago, BobG said:

Your model is looking great, Bryan. Nice work!

Thank you, Bob.

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

  • 2 weeks later...
Posted (edited)

Back with a little more progress. There was about a week of painting. Here’s the outside of the hull with her coats.

 

780093C7-8EE8-457C-8F2B-2C20709766FE_adobe_express.thumb.jpeg.5847e4e06ff58f14d7a6a77697564d79.jpeg

 

The smallest width of painters tape I could find locally was 3/4” and was hard to make the curves clean.

 

046610AA-A235-4B14-9B6F-17E7098A7509_adobe_express.jpeg.9ed29c910b0a34ec09d9e24fe6889275.jpeg

 

This made taping for the inside easier.

 

33343D41-3961-4AB5-9158-19099BEBEF47_adobe_express.jpeg.c02684b9c1b2572683226b8592a50886.jpeg

 

Tiller was next.

 

1FE7F034-57CB-430D-93E6-2EB3854E9C77_adobe_express.jpeg.fa463bc00c8f5d1f83c2ea448d8255cd.jpeg

 

I settled with a slightly bent rod instead mushroom headed one.

 

The rudder. This is where I strayed away from the instructions. I had my doubts about my ability to assemble tiny hinged brackets square enough to connect with receivers on the stern transom. So, here’s my way.

First build both gudgeons. I slid the 1/16” rod inside tube and rolled it under my knife not using a lot of pressure. As the tube cut into, I slid it down the rod. The first one I let come off. It was a task getting the rough cut tube 3/16” long back on. So I tried to keep them together as best as possible.

 

9AD240B2-BE8C-4FC6-81AC-B391AB518423_adobe_express.jpeg.e3a1c6c364c99b00a2956caf6b68d846.jpeg

 

A7316D28-73DD-45BB-9B10-62A76A8F2C23_adobe_express.jpeg

 

 

Instead of nails I cut tiny specks of copper wire and just glued them over the holes.

 

479DBE5C-8CE8-4C48-B7CC-406BA141EDDA_adobe_express.jpeg.29c713091c9be93772fa8192bfbda363.jpeg


90299BED-3D14-4C7D-9FA9-27F7D987D998_adobe_express.thumb.jpeg.a73c55af3619bc59bbec367bef743d03.jpeg
 

CE72C6EA-CF81-4869-99B1-54240CAC0CE4_adobe_express.jpeg.2470355c093d3fa3c46ba3bdf0bc01d8.jpeg

 
After checking and double checking the placement, I glued both complete assemblies to the rudder.

 

A7DE84CA-9788-47DA-B35E-C483726FB499_adobe_express.thumb.jpeg.a6eab7186addcd153cae96fa278d7548.jpeg

 

963D40F8-84ED-4603-99A3-15815CBC897A_adobe_express.thumb.jpeg.deadb3cf881850278ffc58b5299459f4.jpeg

 

4976D0BF-0AA7-4747-9E79-8FB55657DC64_adobe_express.jpeg.982d966a5d6d2435afc21783530abdb1.jpeg


More nailing.

 

A6FAC978-741A-440F-8E9A-F652E002527E_adobe_express.jpeg.d27444a141b9c7b07847f68f18f0c3c8.jpeg

 

Good thing most of the people that will see my model, besides the ones in this forum, will probably have less than great eyesight.

 

AA50DB35-0E12-40B6-BFED-7B7215F595D0_adobe_express.jpeg.6bdd9d85e2a5ee36e0d6947a287bb9c6.jpeg

 

Mast, boom and gaff corners were planed down. Then I spun them with one hand as I ran sand paper up and down.

EDA9CBB1-F8FA-41A5-806B-345ACCCB72EB_adobe_express.jpeg.5f2ff83f2527ff69ec660dce4aff271a.jpeg
 

9BD50455-AF12-4DAB-A208-F784AD9B7D4E_adobe_express.thumb.jpeg.6e2cc86a048dc0bc0c303fbaad48b42e.jpeg
 

Here are a few metal tools that came in handy.

 

6049EE0D-8D18-4ABE-86E1-7A9F8678F7F7_adobe_express.jpeg.6da92cb108fb20e5d4ea02cf2329b280.jpeg

 

Reading that the chafing pad was usually made of copper, I thought mine could be too.

 

A4F7A312-EF8E-4742-BC83-B56F4749DA77_adobe_express.jpeg.611f2100a1e4bae4976fc42dbedc9a0e.jpeg

 

7C49367F-20AD-4A87-BE96-275CA7ABCF30_adobe_express.jpeg.2dd02c90ea73cd1bec11f7d5c7051a48.jpeg

 

FEBE89D8-934B-49B2-95E4-2C1E3454FB01_adobe_express.jpeg.1b433f8390932b78a2873af60ab0a3de.jpeg

 

F68C4ED6-587D-4C86-8E58-3203E53B600C_adobe_express.jpeg.9b22a32275dbbddd39c3eae08506fc06.jpeg


To sum up my progress.

 

8E44F543-E193-4F70-9EDC-BBD4C1A0B711_adobe_express.jpeg.d1f3046c743a83066ef37332b91075d0.jpeg

 

And enjoyed every minute!

 

93875497-A1E9-4FBD-9D30-EA99FF8080E4_adobe_express.jpeg.ef072b09e6aed1fa6f5a73459e67bddd.jpeg

 

IMG_2579.thumb.jpg.0850584c5b32bbadae8863ade53033ee.jpg

 

 

 

 

 

 

 

 

 

 

 

 

 

Edited by Bryan Woods
Remove Duplicate photographs

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

Nice job.  You used a lot of unique techniques to get this far in your build.  It is really turning out to be a nice model.

Ryland

 

Member - Hampton Roads Ship Model Society

            - Ship Model Society of New Jersey

               - Nautical Research Guild

       

 

Current Build - Armed Virginia Sloop, 18th Century Longboat

Completed Build - Medway Longboat

Posted
6 hours ago, Ryland Craze said:

Nice job.  You used a lot of unique techniques to get this far in your build.  It is really turning out to be a nice model.

Thank you Ryland, you could say I’m an improviser.

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

I had some  time this week to venture into another “new to me” part of the build.

 

90E7435D-94AF-4ACF-AAAA-052648EED7E4_adobe_express.jpeg.561e459970006f3b7fb14e4fec1c3d97.jpeg

 

EB00F6B5-79DD-410F-91D7-64AD83E288F8_adobe_express.jpeg.63ae59f9b0ea361383a88a316bff3df3.jpeg

 

3B4CF4A8-70EF-429F-B1AD-8434370DB9FA_adobe_express.thumb.jpeg.327d60a396b7f83e3f92c6e56c781d6e.jpeg

 

 

4A21EEF5-F5D6-4BA0-8A68-E7803226C1C9_adobe_express.thumb.jpeg.5340ae8b25ac23ec3e9884af837858b5.jpeg

 

77098B8A-1DB0-422C-A277-E2FDAA875452_adobe_express.jpeg.6d2fd7a13e7b38d3250c48dbd1e5fca3.jpeg
 

DF94A110-6F00-4455-8972-A36A49AA7748_adobe_express.jpeg.612765f19adccd5c6c1c80796f7d212c.jpeg

 

02069B90-2778-408D-A1FD-0B6B56D5F317_adobe_express.thumb.jpeg.8adf933bccfa2f14b1bc13818bc785d5.jpeg

 

6B97ADD3-CEF6-49BB-B947-C63FC7CC1279_adobe_express.thumb.jpeg.ff83123e8aae002caa4817ca85ca3098.jpeg

 

45F63340-6DE1-465D-A736-2CA9314EC769_adobe_express.jpeg.46adc26538c0192137936ffcbd9a8823.jpeg


05B40B8E-26DC-4496-A582-2842789D9876_adobe_express.jpeg.9edde3ad8f1672504603eda7f589005c.jpeg

 

4A6F9061-625D-482E-B42F-97A9174B0025_adobe_express.jpeg.49ce15e0d16a6e9272a4a9456cc6832e.jpeg

 

 

 

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

I installed magnets in base to help steady it. I really didn’t want to glue it on.

 

76E6B14A-44D4-4EB0-839E-403468EF3A4E_adobe_express.thumb.jpeg.c0d6f9054204776ba3920134bec3a007.jpeg

 

60C0C3BD-73C4-4A90-8BE0-B9E5662FCA78_adobe_express.jpeg.4159e6e26d62113d2b9bbc4eaaad16e1.jpeg

 

96E3D020-5E3D-47B6-9DF3-6E0D85B3013A_adobe_express.thumb.jpeg.71ce3925cd616c104b7123798ad1ddea.jpeg
 

7CB5F4BB-EE9D-4CDD-8F2A-3FF86E95CD49_adobe_express.jpeg.b642df02f3eae150478de5176ffb8a8a.jpeg

 


63F82B53-89D4-4AB7-BAEA-8BABBE4A62F1_adobe_express.jpeg.a474e63dd99b70a137669b34f137b773.jpeg


247B7C6D-D7E9-42C6-9DA7-2EFCF707E367_adobe_express.jpeg.b929727804e70e4657160b493a92e8b8.jpeg


F8DF42E5-3B33-4D09-AF62-121A4D188CC6_adobe_express.jpeg.1612186860a65b9021d6869e8012ca92.jpeg
 

82DCCC6C-25AB-4D33-9802-DF6E6A8A7B1E_adobe_express.thumb.jpeg.05516d4f4b374b3c0aeeab0c49a90452.jpeg


I had trouble trying to tie half hitches with the thread being conscious of the small amount given. I use clove hitches often. They made it a lot easier to be conservative with the thread.

 

38FAFD69-E463-40DD-925E-FE85B78306D9_adobe_express.jpeg.2c461045a9ce629d2f7f1d2f75c14b66.jpeg


1ECE88D2-6526-4E45-A929-40F5A0563CE9_adobe_express.jpeg.953fda6a99ccd3306165407e2f14d668.jpeg

 

2E449F40-3326-4C42-A34E-9B01021A3EC5_adobe_express.jpeg.f6161a3f23882805f511395bc6963464.jpeg


The back stays went smoother.

 

EFF18DF2-E7D1-415A-B7E0-2580B558DD91_adobe_express.thumb.jpeg.30a83186da4ee16d31ebcab7d44942c4.jpeg

 

After gluing the lines  at the stay straps near the mast head, I tied the clove at the bottom and slid it up into position, pulled tight and glued.

 

28151743-E5E1-4E42-A8C5-1D57A399504B_adobe_express.jpeg.0b7a043cf6599e663a6807c95a1d7321.jpeg


Hoisted the sail

 

022AE9C9-C40D-4A4F-85E5-52BC7AD364F2_adobe_express.thumb.jpeg.9f25580a59366ea34077ce0bb5d24b00.jpeg
 

4692AAC5-33B5-48A1-A1D4-BFC4CCD84FA1_adobe_express.thumb.jpeg.ddf8558e311543ffc11e4b48a8e1c5f5.jpeg


And completed my second model boat!

 

A1902359-6900-4E7A-8CC1-660778AA32D0_adobe_express.thumb.jpeg.a1319ba82c2f4ec1e506c0dab79a72fd.jpeg

 

293E98BF-BE12-463D-A888-E8FF2BB41D7C_adobe_express.thumb.jpeg.e3d9ab1e4ab2bb1ecb3601d1cb596ebb.jpeg

 

EC1CEF9D-51E1-4307-8582-AF3404CE3739_adobe_express.thumb.jpeg.1cd3608cd82be23aa97fa8a138f91dd9.jpeg

 

73CB9C4C-E982-4736-841C-19C0A42376A0_adobe_express.thumb.jpeg.bc06dfdd1bdf314e1c5d987a2809964f.jpeg

 

FB4E4DA4-0B00-4759-B7FE-ED0D9C630807_adobe_express.thumb.jpeg.8cd437dec1400b76dc6fdee92269eeff.jpeg

 

2407DE93-27AC-4C9B-95BE-752E1E55B81B_adobe_express.thumb.jpeg.ade17b9445064e1a1049710f80585168.jpeg

 

0C7D1187-7D5F-4449-AE72-AF1CBFF95E4F_adobe_express.thumb.jpeg.5aa9449f85d21f579c3b21f1d375c51e.jpeg

 

C9479271-6D06-4C53-8C29-28E9ACA58852_adobe_express.thumb.jpeg.435cc8de1014c1441becf9ee9cefa4a2.jpeg

 

EE2657C6-0D70-4205-BF2D-05CB9167E798_adobe_express.thumb.jpeg.8a0be08fbb83130753a798028771f213.jpegBefore

 

Before I start Muscongus Bay lobster smack I’m going to build the Catspaw Dinghy Lines Model by the wooden boat store.

 

2CE101E9-7577-4A7C-B2CE-8D1ED690CF9D_adobe_express.thumb.jpeg.0e49e03d7bf03e565169b9870e91c546.jpeg


 

8EDB689E-0A46-492F-A2D8-E3A197F76BE2_adobe_express.jpeg

BC7008A2-A5CB-42F6-AA6D-881C53794E29_adobe_express.jpeg

0537EEDD-E3F8-4EC3-84FC-7B632224082B_adobe_express.jpeg

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Posted

Re:  Name of knot.  That's called a wonhelova.  😁  Not sure the language that's translated from.  It's the knot I use most often. 

 

Nice looking models.  I only hope my 'first time sail' works and looks this good.

 

You've got a good start on a nice little fleet. 

 

Looking forward to following your next build.  

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

Robert Chenoweth

 

Current Build: Maine Peapod; Midwest Models; 1/14 scale.

 

In the research department:

Nothing at this time.

 

Completed models (Links to galleries): 

Monitor and Merrimack; Metal Earth; 1:370 and 1:390 respectively.  (Link to Build Log.)

Shrimp Boat; Lindbergh; 1/60 scale (as commission for my brother - a tribute to a friend of his)

North Carolina Shad Boat; half hull lift; scratch built.  Scale: (I forgot).  Done at a class at the NC Maritime Museum.

Dinghy; Midwest Models; 1/12 scale

(Does LEGO Ship in a Bottle count?)

 

Posted

Congratulations!  Nice job on this model and an excellent build log for future builders of this kit. 

Ryland

 

Member - Hampton Roads Ship Model Society

            - Ship Model Society of New Jersey

               - Nautical Research Guild

       

 

Current Build - Armed Virginia Sloop, 18th Century Longboat

Completed Build - Medway Longboat

  • 2 weeks later...
  • 8 months later...
Posted

Any word of wisdom on the tiller metal work?  The "gentle tap" required to create a mushroom on the end of the wire is extremely oversimplified.  So far, I've split the wood on both tiller extensions (easy enough to make more) and bent the wire on the main tiller. I think simply gluing heads on the ends might be far easier.

CaptJoe

Seattle/Tucson

Current build: Norwegian Sailing Pram

Completed build: Grand Banks Dory

Posted
12 hours ago, CaptJoe said:

Any word of wisdom on the tiller metal work?  The "gentle tap" required to create a mushroom on the end of the wire is extremely oversimplified.  So far, I've split the wood on both tiller extensions (easy enough to make more) and bent the wire on the main tiller. I think simply gluing heads on the ends might be far easier.

 Captjoe, the plan was for it to mushroom but if I remember right, it just bent. It didn’t fall off:-) I did probably drop a dot of CA to keep it there. I didn’t try to build the hinges so it could move. 

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

  • 4 months later...
Posted (edited)
On 6/9/2024 at 9:09 AM, William OBrien said:

Going back to the beginning of your build. My instructions say cut a "Gain," into the garboards, any idea of what that is?

I’m not very experienced with the nautical terms but my understanding it is the tiny groove you cut so the next plank seals against it. I think with the model the intent is for only half of the bottom of the upper plank to show where it meets the lower one. If I remember at the bow and stern they are almost flush with each other. At the time I was building this I didn’t know what it was either:-) so I probably didn’t say much about it:-) 

 

Just looking at my pics, it looks like I just sanded a bevel. There is a log here that show where one rigged his plain to cut a gain and it may have been this boat.

 

Here’s his log title, I couldn’t figure out how to link it:-)

 

Norwegian Sailing Pram by modeller_masa 

Edited by Bryan Woods

Current builds: 

Le Martegaou- 1:80 - Billing Boats


Back on the shelf: 

Gretel - Mamoli

Nonsuch 30 - 1:24 - Model Shipway

 

Completed builds:

Mini Oseberg no 302 -Billing Boats

Sea of Galilee boat

Lowell Grand Banks dory,         Norwegian sailing pram

Muscongus bay lobster smack

Peterboro Canoe- Midwest

Captain John Smith’s shallop - Pavel Nikitin

Chesapeake double kayak

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...