Jump to content

Chuck

Administrators
  • Posts

    9,065
  • Joined

  • Last visited

Reputation Activity

  1. Like
    Chuck got a reaction from Seventynet in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  2. Like
    Chuck got a reaction from Rustyj in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  3. Like
    Chuck got a reaction from PaddyO in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  4. Like
    Chuck got a reaction from AnobiumPunctatum in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  5. Like
    Chuck got a reaction from KentM in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  6. Like
    Chuck got a reaction from VTHokiEE in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  7. Like
    Chuck got a reaction from Mike Y in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  8. Like
    Chuck got a reaction from Archi in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Just a quick follow up....All of the coamings and hatches and partners are now glued onto the model.   Not much to see but here are the details.
     
    The mast partners went in first.  Really important was to get them down the center line so your masts arent slanted or crooked.   It is best to use a dowel or even any strip of wood near the same diameter as the masts to also check the rake of the masts to determine the position of the partners.   I dont have a picture of that but you guys mostly know this already.
     
    The main mast partners needed to have the pump tubes made before I could glue it on the model.  I am only making the pump tubes below deck at this time much like Greg did on his model.  I used a 1/4 x 1/4 cedar strip and marked it out to become octagonal.  I used the 7-10-7 template provided on the plans.   You can see it in the picture below.   Then I drew lines down each side so I could begin shaving the corners.  I just use a sharp #11 blade to carefully shave the corners down to the lines.  Just before the lines actually.   Then I use a sanding stick to finish it off.   Some of you may have some machines that could do this more accurately but this works just fine.   
     

    You will notice a small length of 19 gauge black wire I inserted into the top end.  This will be inserted into the holes laser cut in partners.   The pump tubes are not vertical...so when glued into the bottom of the mast partner I created the slant for these using the plans as a guide.
     

     
    Then it was just a matter of gluing the main mast partners onto the model.  You can barely see these pump tubes under the partners but here is a bad photo showing them entering the well below deck.  We will make the top half of the pumps much later and the same holes on the mast partners will be used to register them so they look continuous through the deck.  So dont make the wire too long on the top of the tubes.  Make them short enough so some room remains to do the same when we add the top of the elm tree pumps later.
     

    The other gratings and hatches were added down the center line permanently.
     
    The last remaining issue was the capstan partners.   We need to make the capstan drum below deck.   This is easy enough.  Its just a round drum that tapers.   I started with a 3/8 x 3/8 strip of cedar.  Then I converted that into an octagon just like we did for the pump tubes.  I have provided another 7-10-7 template for this strip so you can proceed to make it an octagon. 
     
    Here is a photo after I rounded it off and tapered the octagon.  I just dis this by hand but you can chock it in a hand drill or if you happen to have a lathe....have at it.  The length can be taken from the plans as well as the diameter at the bottom so it fits in the capstan step below deck.
     

     
    Once completed I glued the capstan partner onto the center line of the deck so the drum sits in the step nicely.  You might also notice that I made the drum a certain length so there was still room in the hole of the capstan partners.   This will allow me to register the actual capstan above deck after we make it.  Hope that makes sense.
     

     
    Thats it for now as I am off to the beach for a few days to recharge....and decompress.   I will be back sometime next week ......or maybe not....
     
     
     
  9. Like
    Chuck got a reaction from Archi in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you Jim...
     
    I have completed all of the hatches, gratings and partners to be placed on deck.  You have seen how the gratings were made.  The two hatches are pretty similar.  The only difference is they have cover boards rather than gratings within in the coamings.
     
     The photo below shows the laser cut coamings assembled.  There is no need to remove the laser char from the lap joints at the corners.  In fact it probably isnt a good idea at all.  They are precision cut so you end up with a perfectly squared up coaming the correct size.  You can and should sand both sides of the sheet before removing these laser cut parts to clean the char from those sides.  Just glue them up using the same right angle jig provided earlier.   Then sand the char off the top of the completed coaming being careful to keep the round-up consistent. 
     
    You can see the smaller hatch completed.  The larger one shows the three cover boards also laser cut waiting to be glued into position.  But this you will also note the ledge created on the inside of the coaming that the cover boards will sit into.  These are laser cut for you and can be glued on the port and starboard insides of the coaming.
     

    This photo shows the three coverboards in the coaming.  They are pretty thick, but only so they are flush with the center of the coaming to allow for the round-up.   The round-up along the sides of the coverboards should be sanded flush to the top edge of the coamings along the P & S sides.  I know some folks like to show one or two coverboards off the coaming.  You can do this if you want to.  But then you should sand that roundup into the bottom of the coverboards as well.   But I will show them all in place like the contemporary model.
     

    To finish off the hatches...round off the corners using the right angle jig like you did for the gratings.   Trim them down to the top of the deck planking.   The bolts were added using black fishing line in the same way.   The iron ring for handles were made just like those on the lower platforms.  Exactly the same.
     

    Also shown in the photo above are the mast and capstan partners.   These are completely laser cut for you.  They have etched lines to show the separate sections.   All you have to do is sand them clean and round off the corners as described earlier for the capstan partners only.  Soften the top edges as well.  Add the fishing line bolts and the eye bolts on the main mast partners.  Now some of these can be glued onto the model.  They are all ready to go so you can start planking the decks.
     
    BUT there are a some like the main mast partners and capstan partners that need some extra work.   I will describe that next.   For example the elm pump tubes below the main mast partners and the capstan drum as well.
     
    More to follow...but here is a photo with the all of the hatches, coamings and partners simply test positioned on the model.  They are not glued into position yet.   I did however glue the smaller grating and coaming on the forecastle deck in permanently....those are all finished up.  Its getting there!!!
     

  10. Like
    Chuck got a reaction from Katsumoto in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  11. Like
    Chuck got a reaction from yvesvidal in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  12. Like
    Chuck got a reaction from GrandpaPhil in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  13. Like
    Chuck got a reaction from Trussben in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  14. Like
    Chuck got a reaction from JeffT in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  15. Like
    Chuck got a reaction from yvesvidal in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Just a quick follow up....All of the coamings and hatches and partners are now glued onto the model.   Not much to see but here are the details.
     
    The mast partners went in first.  Really important was to get them down the center line so your masts arent slanted or crooked.   It is best to use a dowel or even any strip of wood near the same diameter as the masts to also check the rake of the masts to determine the position of the partners.   I dont have a picture of that but you guys mostly know this already.
     
    The main mast partners needed to have the pump tubes made before I could glue it on the model.  I am only making the pump tubes below deck at this time much like Greg did on his model.  I used a 1/4 x 1/4 cedar strip and marked it out to become octagonal.  I used the 7-10-7 template provided on the plans.   You can see it in the picture below.   Then I drew lines down each side so I could begin shaving the corners.  I just use a sharp #11 blade to carefully shave the corners down to the lines.  Just before the lines actually.   Then I use a sanding stick to finish it off.   Some of you may have some machines that could do this more accurately but this works just fine.   
     

    You will notice a small length of 19 gauge black wire I inserted into the top end.  This will be inserted into the holes laser cut in partners.   The pump tubes are not vertical...so when glued into the bottom of the mast partner I created the slant for these using the plans as a guide.
     

     
    Then it was just a matter of gluing the main mast partners onto the model.  You can barely see these pump tubes under the partners but here is a bad photo showing them entering the well below deck.  We will make the top half of the pumps much later and the same holes on the mast partners will be used to register them so they look continuous through the deck.  So dont make the wire too long on the top of the tubes.  Make them short enough so some room remains to do the same when we add the top of the elm tree pumps later.
     

    The other gratings and hatches were added down the center line permanently.
     
    The last remaining issue was the capstan partners.   We need to make the capstan drum below deck.   This is easy enough.  Its just a round drum that tapers.   I started with a 3/8 x 3/8 strip of cedar.  Then I converted that into an octagon just like we did for the pump tubes.  I have provided another 7-10-7 template for this strip so you can proceed to make it an octagon. 
     
    Here is a photo after I rounded it off and tapered the octagon.  I just dis this by hand but you can chock it in a hand drill or if you happen to have a lathe....have at it.  The length can be taken from the plans as well as the diameter at the bottom so it fits in the capstan step below deck.
     

     
    Once completed I glued the capstan partner onto the center line of the deck so the drum sits in the step nicely.  You might also notice that I made the drum a certain length so there was still room in the hole of the capstan partners.   This will allow me to register the actual capstan above deck after we make it.  Hope that makes sense.
     

     
    Thats it for now as I am off to the beach for a few days to recharge....and decompress.   I will be back sometime next week ......or maybe not....
     
     
     
  16. Like
    Chuck got a reaction from realworkingsailor in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  17. Like
    Chuck got a reaction from Tobias in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  18. Like
    Chuck got a reaction from Archi in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  19. Wow!
    Chuck got a reaction from mtaylor in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  20. Like
    Chuck got a reaction from Tossedman in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  21. Like
    Chuck got a reaction from CaptMorgan in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Thank you guys...we leave tomorrow.
     
    Yes I am headed out to the north and south fork of Long Island.   Gonna check out some maritime stuff including some museums that have small boat collections.  Still researching that block island Cowhorn.  There is supposed to be a nice one in the museum there.  I will be online using my phone though....me always needs some MSW time....lol.
     
    Planking has started...today.
     
    The facstle is completed.  Nothing to really add except that I followed the planking scheme provided on the plans.   You can see that here.  You guys may of course change it.  I cut these from a 3/64" sheet following the plans rather than use strips.  There is quite a pronounced curve to these and they are small enough so it wasnt a chore.  I basically traced the plan sheet.  Tweaked and sanded to suit.  I used a #4H pencil to simulate the caulking between the planks.
     
    Progress below.  One plank at a time.  The outermost planks are the hardest but not terrible.
     



     
  22. Like
    Chuck reacted to chris watton in Chris Watton and Vanguard Models news and updates Volume 2   
    Page for the launches are now live:
     
    24′ and 26′ Launches (3D printed hulls) – VANGUARD MODELS
     
    26 foot – 123 long x 37 mm wide - £29.00
    24 foot – 112mm long x 34.5 wide - £27.00
     
    Each mini kit has three 3-d printed parts and one sheet of 0.8mm pear laser cut parts.
     
    I am very happy to have started to produce these, and the forthcoming boat types. I remember the choices always being pretty slim (to put it mildly) for pre made hulls, usually having to settle for some generic type that was always too much of a compromise - and I also know that many have trouble, or do not like the plank on bulkhead mini kits. I am hoping these will help fill a gap...
  23. Like
    Chuck reacted to chris watton in Chris Watton and Vanguard Models news and updates Volume 2   
    Little update.
     
    I will soon have a new 24 and 26-foot launch for sale later today. These have 3-d printed hulls, windlass and stern davit, and a 0.8mm pear laser cut sheet containing knees, thwarts, oars etc. Both in 64th scale for now.
     
    I have also commissioned a 22- and 24-foot cutter, 22-foot yawl, 28 and 32-foot pinnace and another launch, so ultimately, I shall have complete pre made hull sets (along with the laser cut wood parts to go with them) for all of my kits, including future developments, as an alternative to the plank on bulkhead versions.
     
    Also almost ready are the new Nelson figures. This will be available in 72nd, 64th, 48th, 32nd and a few in 1:16th scale. These have a separate base.







  24. Like
    Chuck got a reaction from mtaylor in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Yes but why in the world would you risk that.  To many ways for that to go wrong.  So rather than do that I drill them on each side separately and you dont have to go all the way through.  I am just cautious like that.  Especially when you can only see one side at a time.
     

     
     
  25. Like
    Chuck got a reaction from GrandpaPhil in Sloop Speedwell 1752 by Chuck - Ketch Rigged Sloop - POF - prototype build   
    Just a quick follow up....All of the coamings and hatches and partners are now glued onto the model.   Not much to see but here are the details.
     
    The mast partners went in first.  Really important was to get them down the center line so your masts arent slanted or crooked.   It is best to use a dowel or even any strip of wood near the same diameter as the masts to also check the rake of the masts to determine the position of the partners.   I dont have a picture of that but you guys mostly know this already.
     
    The main mast partners needed to have the pump tubes made before I could glue it on the model.  I am only making the pump tubes below deck at this time much like Greg did on his model.  I used a 1/4 x 1/4 cedar strip and marked it out to become octagonal.  I used the 7-10-7 template provided on the plans.   You can see it in the picture below.   Then I drew lines down each side so I could begin shaving the corners.  I just use a sharp #11 blade to carefully shave the corners down to the lines.  Just before the lines actually.   Then I use a sanding stick to finish it off.   Some of you may have some machines that could do this more accurately but this works just fine.   
     

    You will notice a small length of 19 gauge black wire I inserted into the top end.  This will be inserted into the holes laser cut in partners.   The pump tubes are not vertical...so when glued into the bottom of the mast partner I created the slant for these using the plans as a guide.
     

     
    Then it was just a matter of gluing the main mast partners onto the model.  You can barely see these pump tubes under the partners but here is a bad photo showing them entering the well below deck.  We will make the top half of the pumps much later and the same holes on the mast partners will be used to register them so they look continuous through the deck.  So dont make the wire too long on the top of the tubes.  Make them short enough so some room remains to do the same when we add the top of the elm tree pumps later.
     

    The other gratings and hatches were added down the center line permanently.
     
    The last remaining issue was the capstan partners.   We need to make the capstan drum below deck.   This is easy enough.  Its just a round drum that tapers.   I started with a 3/8 x 3/8 strip of cedar.  Then I converted that into an octagon just like we did for the pump tubes.  I have provided another 7-10-7 template for this strip so you can proceed to make it an octagon. 
     
    Here is a photo after I rounded it off and tapered the octagon.  I just dis this by hand but you can chock it in a hand drill or if you happen to have a lathe....have at it.  The length can be taken from the plans as well as the diameter at the bottom so it fits in the capstan step below deck.
     

     
    Once completed I glued the capstan partner onto the center line of the deck so the drum sits in the step nicely.  You might also notice that I made the drum a certain length so there was still room in the hole of the capstan partners.   This will allow me to register the actual capstan above deck after we make it.  Hope that makes sense.
     

     
    Thats it for now as I am off to the beach for a few days to recharge....and decompress.   I will be back sometime next week ......or maybe not....
     
     
     
×
×
  • Create New...