Jump to content

closehaul

Members
  • Posts

    150
  • Joined

  • Last visited

Posts posted by closehaul

  1. I started the rope coils on an improvised jig for six flemish hands and  24 draping coils at a time. All coils must first have a drop of CA glue to harden the polyester line for cutting then dabbed with white glue mix to hold them to form. The flemish hand coil laid nicely on the main deck using the white glue mix to secure it in place. Once the CA hardens completely on the line between each draping coil (bottom photo) they will be severed then wrapped around their waist with a couple loops tied off and coated with white glue mix. When it drys the top pins on the jig can easily be pulled out and the coil can be placed onboard its pin.  We'll see if this works out as good as it did for the Flemish hands in the next post.

    889404B6-0F1C-4AD9-8F40-BB065D9C213C.jpeg

    BA7C2D13-AAFB-4ADA-B719-194AD71CD4C6.jpeg

    FF9A28A5-8785-4254-B810-32C6509F24DD.jpeg

    93E6F518-B8D2-4B51-890D-3D06D5B568CB.jpeg

    07F054CF-A1D9-4C7A-B9D4-86332F96CDBE.jpeg

  2. The running rigging has been completed (bottom photo) on the main and mizzen masts which are identical to the foremast from the previous post except for the mizzen sheet which is configured with heavier blocks and bitts for the spanker's large sail displacement (top photo). I failed to mention that the main deck furniture has been affixed in its place per the sail plan as each masts' entire rigging from the forward companionway back to the main cabin has been completed. There remains only the ships' boats flags, pennants and rope coils to be done before Atlantic is off the blocks.

    655E0A4D-9315-4287-8044-7D228DC25103.jpeg

    A5D7F118-1343-47BE-8420-2152E4ECC5FD.jpeg

  3. I started the running rigging for the downhauls (1st photo) for the staysail, jib sail and jib topsail starting at the belaying pin, reeving the line through each block made fast to the bowsprit with 26 gauge brass wire then through each block fixed to the fore top mast and down to and belayed on the fife rail (for the jib top sail only) and port and starboard bitts aft of the foremast for the staysail and jib sail downhauls. Next the lines for the peak halliards (2nd photo) were belayed at the starboard bitt aft the mast through an eye under the fife rail then relayed up and reeved between the 3 single blocks at the mast and the two bridle single blocks on the gaff then down to and belayed on the fife rail. The throat halliard is belayed on the port bitt and is reeved through triple and double blocks vertically up the mast and down to the fife rail. The topsail sheet starts and ends at the fife rail and reeved through holes (to simulate sheaves) drilled at the tips of the gaff and topmast. The third photo shows the fore boom sheet, outhaul and topping lift. Note that the vertical line running between tips of the boom and gaff is not an existing line. I put it there to indicate the leach of the sail as a suggested option in the instructions.

     

    55E6FDA6-0098-4744-96E3-CC109767BB29.jpeg

    2A68B2A4-CBC7-4527-8EBC-57821532C2A2.jpeg

    FDA7C3E8-21AA-4DC1-988E-8B8229BDAA26.jpeg

  4. Ratlines and all standing rigging arrays are completed on the lower masts (top photo), bowsprit (2nd from top) and topmasts (3rd from top).  The fourth photo is the spring stays transversing all 3 masts. The fifth photo down is of the running tackle for the starboard mizzen topmast preventer backstay, belayed to the cleat. the choice of using the tan polyester rigging line is one I'm very satisfied with. It reaves very smoothly through the blocks and doesn't need beeswax. The only downside is that it needs the most judicious amounts of CA glue to hold the line snug together at the block's eye then serve it with the small whipping line where it can then be adhered to with white glue. I've found this process is quicker than waiting for the cotton thread to dry completely so I'll continue it throughout the running rigging.

     

     

     

    13A48229-42F0-459F-81D3-4FA36C0E6FCA.jpeg

    80783C92-C92A-4BE8-BEB0-B007D052FF4A.jpeg

    3EF6E4A1-65D8-4BF7-B1D7-8B914ECE3521.jpeg

    90F23BE0-B421-421F-B7E6-3CEAA62840F9.jpeg

    EA728226-32D1-42A7-8117-8871B17EB913.jpeg

    6AB29244-4400-40FE-B3B9-FEA4F88F6C26.jpeg

  5. On 5/6/2021 at 6:08 PM, Chuck said:
    • Nice work and progress on the model.  Its really coming together.

     

    On 5/6/2021 at 6:08 PM, Chuck said:

    Nice work and progress on the model.  Its really coming together.

    Thank you Chuck; Its been both exciting and challenging to build this famous ship and having fun researching and learning the methodology of model ship builds. I'm looking forward to my next build - thinking a plank and bulkhead design - upon completion of Atlantic.

  6. On 5/4/2021 at 10:58 PM, daschc01 said:

    Great work. I am starting on the same model soon I hope. May I inquire what paint color you used for the antifoul bottom paint. Thanks so much.

     

    Chris

    Thank you for the compliment Chris.  The paints used throughout the build are True North Precision Enamels. The bottom paint is USN Norfolk 65-A, Anti-Foul Red. The bottom paint was part of the Bluejacket paint kit ordered with the model kit.

                 

       Ange

  7. The ratlines are at their half way point of completion so I thought of augmenting this basic build log with a few details about the methods and materials used for the standing rigging. The first photo is the rigging of the top spring stays belayed between the fore and main mast. I know somewhere on the site there are detailed instructions on serving all different rigging situations and I have found some to be helpful but in some things like these spring stays I improvised. In the top photo note the alligator clip hanging off the serving thread (at bottom of photo with green tape covering jaws). It puts tension on it to eliminate the birds nest that resulted each time I tried to tie it off. At this point white glue mix is used to bind the top spring stay serving abaft the foremast and will easily then be tied off when it drys. The second photo is of the finished spring stays. The third photo is of the temporary backstay running rigging (tan colored line) that provides tension to the masts so they can be loosened to make working room when Atlantic's entire running rigging is later reeved and belayed. The permanent backstay running rigging itself will then be reeved and belayed when the standing rigging on all three masts is completed. The bottom photo are the three types of line to be rigged on Atlantic. The left spool is  100% cotton .025 dia. black thread. It is basically used for the shrouds. The middle spool is 100% polyester GutermannE121 tan thread, .020 dia. which is not supplied in the kit. It was ordered from a modeling craft supplier to substitute for the white line provided in the kit. I switched to this line because of my unsatisfactory results from staining the line tan (it came out with a reddish tint). It is used for all running tackle, downhauls, halliards and sheets. The 3rd spool from the left is 100% cotton .020 dia. black thread. It is used for stays, pendants and ratlines. All line types are 3-strand right handed rope. Lord willing, and if the Creek don't rise, all Atlantic's ratlines should be completed in my next post by Memorial Day.

    0F50CDFC-D4FA-4C96-B1C9-99E27204F7D2.jpeg

    9A0C2DE2-2A76-408E-93D4-88418D7A5D62.jpeg

    F30DDE1C-DB0F-4819-AAAB-81F8307D6B30.jpeg

    2EA61FA5-7BDA-42D7-B41E-7A74E8537244.jpeg

  8. The ratlines have all been made fast to the foremast shrouds and the final pair of shrouds have been rigged to the spreaders ends, up and around the top of the masthead along with a pair of jumper shrouds from the mast cap out to the ends of the spreaders. Shear poles  have been fastened to the top ends of the turnbuckles with CA glue and have been painted along with the chainplates and wire rods connecting them. This completes the standing rigging for the foremast. The main and mizzen mast are to be rigged in a similar fashion minus the jib and forestays naturally.

    DEEA8FBE-76C6-4AB8-A747-484AD4A1F888.jpeg

    2961EAB8-5AD2-4F1B-B666-03E61E26AD51.jpeg

    6F765F6D-A351-47B3-ACFC-0FCAFF619B32.jpeg

  9. Making progress with the foremast. Backstays and running tackle has been reeved and belayed on deck cleats (top photo). Both the double and single forestays have been made fast by belaying them under the bow grate ( 2nd photo). And the forward most shrouds are made taut and served to their turnbuckles which are wired to the chainplates. (3rd photo). With the foremast now stepped, minus  the remaining 5 pairs of shrouds yet to be rigged, I've been profiling the mast rake ( about 1.5 degrees abaft ) against the sail plan throughout the masting process. 

    FAAB3E17-7D9B-4DF4-B6DF-65024F6F42B7.jpeg

    CA73D0C8-4881-4D72-A03A-5961148FC895.jpeg

    2675D99F-30B7-42EF-A960-90E7A2C11D5A.jpeg

    139CF902-4688-4619-8309-F243AA4EC306.jpeg

    3A691D69-3836-42A4-8A9A-496CA93A9894.jpeg

     

    AD5359DB-93AB-44F9-86D8-5B3547AF000D.jpeg

  10. The blocks arrived this past week and were served onto the backstay runner pendants, then reeved with the running rigging lines through double becket blocks port and starboard. The foremast has been fitted into its hole in the deck. As more lines are being served throughout the rigging, I'm trying to figure out a rule of thumb as to which lines are actually served and which ones can be knotted . I've been using bowlines for fastening the gaff block pendants as shown back in post #76 but I'm thinking off severing these knots and serving the pendants to the gaff eyes instead. The instruction booklet understandably does not delve into it. I prefer severed eyes instead of knots for appearances alone even if it takes longer to finish Atlantic. So it looks like I'm in for the long haul. 

    B7C0F1E5-F44E-46CF-8DCD-66C61143B984.jpeg

    8AE3D3DC-C015-4A1C-BE05-E76B1A2D4B8F.jpeg

    B618F606-B7D2-4C87-BF4A-14F63AE65ECF.jpeg

  11. On 3/21/2021 at 8:27 PM, daschc01 said:

    I am curious as to what is your preferred thread or product for serving lines. I did one model *my first with cotton sewing thread and was wondering if you or anyone else had a good recommendation.  I will be starting this Atlantic model soon so I am following this build with interest. Great job and thanks for posting.

     

    Chris

    Thank you for inquiring Chris. The black line for serving actually was from the Admiral's sewing kit. Its 37% cotton 63% polyester. It is visibly much thinner than the rigging line supplied with the kit but I'm unable to decipher the spool label to determine its gauge. If any one reading this reply can augment the details on the label it would be most welcomed.

           Ange 

    9DC2D112-55E2-4B97-A6E6-01E54EA09EA5.jpeg

  12. While fastening block pendants to the gaffs I've come up short 8 of the 3/16" single blocks (they pulled a Houdini on me).  All 40 blocks in the kit had been correctly inventoried upon opening its packet, so while waiting for replacements I started serving the backstay block pendants and seizing the forestay rigging needed to step the foremast. The fourth photo down is the pendant line ending that was frayed then glued form a loop with 50/50 Elmers glue to water mix. Then the thinner serving line is wound around, tied off with a square knot and one last coat of white glue mix is lightly brushed on. The latest addition to the tool chest is the articulated clips and magnifier ( I welcome any correction of what it is actually called). It was helpful for making fast the gaff pendant blocks but was unmanageable for serving and seizing the standing rigging. Two pegs in a board worked fine after half a dozen attempts to get the hang of it. 

    4EBFE6C8-5CF2-4249-8C0A-A3A76A554CC0.jpeg

    94D89408-6B11-4AC8-B703-F82AA7F14AAA.jpeg

    2542C75F-2772-4CEF-B6A0-7D1F70E1D349.jpeg

    C77B5977-F397-4EDF-87D0-11FEBAEDAE0F.jpeg

    70BAA94F-9806-4768-BA24-CB5F8C746B10.jpeg

    181B8CEF-0AAA-4869-9264-C83B7616F7C5.jpeg

    9CCF1D72-D6C2-4897-8C56-E9F6B25EAB2C.jpeg

  13. The instruction booklet allows for the boom goosenecks and gaff jaws assembly using copper foil strips to simulate them as close as possible to the actual sail plan that shows them twice the size of the models' actual scale. It also recommends using pins to secure all booms and gaffs to the masts to substitute for the actual hinges portrayed on the plan (top three photos). I had to satisfy my curiosity to see that all spars were clearing the mast regardless of them being cut, shaped  and set according to the sail plan. The bottom photo is of all spars completely fitted with blocks, bridles, pendants and stirrups minus the halliard blocks and their bridles for the gaffs soon to be affixed.

    56F629DB-42F7-46F6-8575-DBE2A34F554A.jpeg

    F5CDE468-5FF3-4A43-9711-E7A0A495950C.jpeg

    BA6E5CDC-3B53-4306-AB5D-9709EDBA9D40.jpeg

    BF722214-4B84-40A8-9C85-58A9B83214D7.jpeg

    33EFBF4E-7328-4AE1-9972-95634839C4AB.jpeg

  14. On 3/9/2021 at 6:00 PM, allanyed said:

    Closehaul

    My sincere apologies if this comes across poorly, but is the material in the photo what the kit supplies?   The reason I ask is that it is quite different than rope.  You can see samples of rope from Syren (photo below) or any rope made on a rope walk thus my question.  Beeswax may knock down the fuzzies, but it will still not look like rope.   I hope someone comes up with a source for rope as I have pretty well concluded that otherwise I will be learning to make rope myself in the future.       

    Allan

    Thank you Allen, sorry for the delayed response, but just seen it as I deleted my post. That photo was the spool of white line supplied by the kit which I stained with Minwax wood oil stain. I unreeled the entire spool in my garage then applied the oil stain with a rag and after it dried a day wound it back on the spool. I see what you mean about the beeswax and to get a more realistic rope. I have back ordered that line displayed in this topic from craftysailor to achieve a better look on the rigging lines. Your input has been valued in my line selection for my build and should be on my build log in the not too distant future.

     

  15. The guys and dolphin striker have been cut from 3/64" dia. brass rod, set, glued, painted and will be rigged later after the masts are stepped. The second and third photo are the top fore and main backstay bridles fashioned from 26 gauge brass wire and also painted flat black. The trucks on the  3 topmasts are finished with gold paint in the 4th photo. Atlantic requires 8 single blocks and hooks for its ship boats davit rigging and 3 double blocks and hooks for each mast throat halyard tackle in which the blocks were drilled out to glue the hooks in that were also fashioned from the kits' 26 gauge wire and then painted brown on the blocks and black for the hooks. I have to apologize for the incompleted paint and finishing on some of these parts. Some have only an initial coat of paint while others require further smoothing of surfaces or redrilling the blocks' sheaves clean. When the rigging begins the photos will show the final finish on all parts.

    09E4280A-02BF-4498-AFC7-339277873FAE.jpeg

    95ED5B00-B3C1-463E-8BA3-4AB957C91F6D.jpeg

    1BFFE72A-D388-47AD-A5AE-5112830F0087.jpeg

    56FB1B9C-95BF-489D-A65F-1D425E141AED.jpeg

    93BDAA49-EF81-4737-99C9-D00FA3C099CE.jpeg

    442D6FC0-4E72-4E5E-9807-DED4A7470E76.jpeg

  16. The spreaders have been sanded to shape, primed and painted while the hounds have been reamed to fit the mast per sail plan. To ready about for rigging , all blocks and turnbuckles have been drilled, filled smooth and painted per instruction booklet. The bottom photo is of the gold trucks at the masthead. An 1/8" dia. hole punch cut the round out of the unused 3/64" thick basswood that was supplied in the kit for the transom bulkhead which I chose to carve out instead. Once the trucks are finished and drilled, the taped over mast caps will be gently slid down the topmast to the designated position per sail plan and glued in place.

     

     

     

     

    9980B5D1-7AED-4D10-AC3F-EC94CEF87A8B.jpeg

    0BE17E04-D0ED-4AE2-A440-9A16BCBCF2A9.jpeg

    415EA804-7523-4229-A81B-E35A79659D4F.jpeg

  17. The top photo is the spreaders glued with CA to the hounds and have yet to be sanded to the final shape. In the middle photo are the completed ships' boats and behind them the spreaders sanded to their final shape. The bottom photo is my forest of masts, booms and gaffs all sanded to shape, primed and painted with the first coat of depot buff enamel.

    9E76A80D-9487-4A24-9356-43F5B7DD5FFE.jpeg

    22DFF6B5-13C2-4D1C-A07E-9A3637D83A2C.jpeg

    00FA88E6-78F8-43AD-B2D5-50F13FD91602.jpeg

  18. The elongated scratch built anchor shackle was successful and its chain and crossbar installed on deck along with chain sections for the anchor winch. The square yards have been completed and stowed on deck as they were during the 1905 Kaiser's Cup race across the Atlantic. For turning the 3 masts I fashioned a tailstock using a 5mm ID roller bearing. The 3/16 in. dowel fit snuggly into it to get the required tapering for fitting the hounds and mast caps. The tapered sections of the mast are then hand sanded to insure a proper fit.

    7691A96A-D55E-4659-B181-91F27C69D9BC.jpeg

    F0DD6755-446F-42C8-8288-F622A4D85AFA.jpeg

    8A4AA3E2-AD26-40B1-9AFA-A47396F5AE57.jpeg

    3CD66BF9-6428-496C-BFE2-B3E737974CAE.jpeg

    54A907AC-9953-40F9-9358-502733822932.jpeg

    CC20594B-B6DC-49C1-8011-6752472F33E5.jpeg

    06612DF4-95F2-4189-9236-6721767B9881.jpeg

×
×
  • Create New...