Jump to content

shipmodel

NRG Member
  • Posts

    908
  • Joined

  • Last visited

Reputation Activity

  1. Like
    shipmodel got a reaction from CiscoH in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  2. Like
    shipmodel reacted to michael mott in Skipjack by michael mott - 1/8th scale - SMALL - 19 foot open launch   
    Thanks for all the likes today.
     
    I reached a milestone today and got the main bearings roughed in.
     
    First I machined up the keeper blocks. and some studs.
     

     

     
    Assembled them in order to ream them for the 1/8th shaft.
     

     
    I thought it best to use the hand reamer rather than setting it up in the mill for the machine reamer.
     

     
    After thinning down the area on the upper crankcase it all went together quite nicely. and the shaft rotates easily.
     

     
    I am still deciding whether to fabricate the crankshaft or machine it from solid bar, either way it will be tricky.
     
    Michael
     
     
  3. Like
    shipmodel reacted to michael mott in Skipjack by michael mott - 1/8th scale - SMALL - 19 foot open launch   
    Ed hopefully the next set of pictures will clarify my description. Mark well it is not a complete machine job there is some soldering however I did not want to anneal the brass that has the bearings braces so opted for soft solder which will be more than adequate for the oil pan.
     
    The first picture shows the material being removes that will become the hollow areas'some parts were machined by the numbers and the bulk was just milled away by eyeballing it.
     

     
    Next the 1/32 thick sheet was annealed and curved over a steel bar.
     

     
    It took a while to get it fitted cleanly, the flat area on the middle bearing wall is to allow the oil to pass through to equalize both chambers.
     

     
    The next picture shows the assembled parts cleaned up a bit getting ready to do the soldering.
     

     
    Resting the upper part of the crankcase to see the overall scope of the whole engine.
     

     
    In the next picture you can see the central cross member.
     

     

     
    There is still a fair bit of cleaning up to do but I am generally pleased with the progress.
     
    Again thanks to all who have looked in and pressed the like button.
     
    Michael
     
     
  4. Like
    shipmodel got a reaction from popash42 in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  5. Wow!
    shipmodel got a reaction from EricWilliamMarshall in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  6. Like
    shipmodel got a reaction from aviaamator in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  7. Like
    shipmodel got a reaction from EricWilliamMarshall in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hello again and, as always, thanks for the likes and comments.
     
    This time I turn to the details of the foredeck.  Although the basic structure and planking has been completed for a while, it was never attached to the hull because various components under the deck had to be completed first.  These included the guns that were done last time, the anchor bitts, and the post with sheaves for the foreyard halyard and tie system.
     
    Here is the system on a contemporary model.  This is the one for the main yard, but the pieces are the same: a post attached to the deck with a number of sheaves for the halyard line; an upper ramshead block with matching sheaves and a transverse hole for the tie which comes down from the masthead; and the halyard line running between the two.  As you can see, the line goes through the deck and must pass through a series of holes or a scuttle of some sort.  There are no clear photos of this detail that I could find.
     
    1
     
    I also had to figure out how to install them fully rigged, since it would be quite difficult to get to the posts once the upper decks were in place.  Even RC Anderson recommends fully rigging them, then tensioning the system with the tie and not the halyard.  Here is what I came up with.
     
    I started with the ramshead blocks.  I made these up with false sheaves rather than trying to build them up since they would be rigged and the sheaves hidden under the running line.   A series of five holes was drilled in a sized piece of hardwood in two matching horizontal lines using a Dremel drill press.  Then a thin grinding bitt was laid against the wood to cut a channel from one hole to the other.  You can see where I am starting the process in the right side hole with the others in later stages of carving.
     
    2
     
    These channels were carefully deepened and straightened, then angled at the ends of the cut until they approximately replicated the curve of the sheave that is not there.  This was done on both sides of the workpiece.  Now the blocks will accept the line which will look as though it is running around a circular sheave. 
     
    Once all the slots were cut and cleaned up, the block was parted off to length and taken down to the ramshead shape with a sanding drum.  Here are the two for this model.  I do see that the tops of the blocks need some further shaping to match the one in the earlier photo.
     
    3
     
    In a similar way the posts that will go under the foredeck and quarterdeck were cut, pierced, and shaped.  The one on the right is an early example, before my technique was perfected, and which would be replaced if it were not going to be hidden under the foredeck.  The cut at its base is so it can fit over the knee of the anchor bitts, which brings it to the starboard side of the centerline.
     
    4
     
    And here are both sets, which were made up at the same time to maximize consistency.  You can see how the posts will be secured with brass rods into the deck for strength.
     
    5
     
    Here is the foreyard set fully rigged.  Sharp eyes will notice that there are only 4 loops of the halyard line and not 5.  When I went to install the set initially it really seemed too large for the ship.  I went back to my photos of contemporary models and found that the 5-sheave blocks were used on the largest three-deck warships.  This small frigate would not have needed such lifting power, so I took the finished pieces to the table saw and sliced off one side of all the pieces to eliminate one sheave.  This had the happy result that the scuttles in the decks did not have to be quite as large.  More on this later.
     
    6
     
    The next detail for the foredeck was the railing to keep sailors from falling into the waist and to house the ship’s bell.  I wanted to build and install it now so I could secure it from beneath the deck with metal pins before the foredeck was put on the model.  Here is a photo of a fairly fancy one from a model of a French ship of a somewhat later period.  Although this one is continuous from port to starboard, Budriot shows two gaps which will be used later to house spare spars and topmasts, so there is a long central section with two short sections flanking it.
     
    7
     
    I decided that my railing would have balusters set in channels for the body of the railing, with posts that went up through a caprail and ended in shaped timberheads that could be used to secure rigging lines.  The first task was to make a fairly large number of identical balusters without spending days turning them on a miniature lathe, which I don’t have.  I opted for the mill-and-part-off method that has worked for me with support knees, shingles, and other repetitive parts.
     
    On the left is the baluster shape that I selected from internet images, then the cross section of the workpiece after milling channels with the Preac table saw and rounding off as needed with a carving bitt.  On the right is the side view of the workpiece with the parallel channels cut by the saw.  Note that the grain runs vertically.
     
    8
     
    Here the individual balusters are being parted off the workpiece on the Preac.  It is set up with the tall vertical fence and the thinnest, finest blade that I have.  The workpiece is being fed into the blade and is supported by a sacrificial stick held against the miter gauge.  This support stick is taller than the blade height so the end remains attached and I can push the workpiece through repeatedly, taking off identical slices.
     
    9
     
    Here are four of the balusters set into upper and lower channels ready for the end posts and caprail.
     
    10
     
    And here are a set of completed railing sections ready for installation.  Note that four of them are angled slightly to match the round-up of the deck.  
     
    11
     
    However, when I went to install them I realized that I had made a major mistake.  I made the railing about 40 inches tall in scale, enough to keep a man from falling over it into the waist.  This looked terrible against the size of other fittings.  I went and rechecked my dimensions to find that the railing is really only 18-24 inches tall.  Proof, once again, that if it doesn’t look right, it is probably wrong.
     
    Instead, a new workpiece was shaped and short balusters were parted off.  Here you can see the relative heights of the old and new railings. 
     
    12
     
    You can also see that the new workpiece did not cut as cleanly as the old one.  I gave them a few coats of finish and, when dry, took off the wood fuzz with a thin pointed grinding bitt.  Here is the final set of railings, the upper ones for the quarterdeck and the lower ones with the belfry for the foredeck. 
     
    13
     
    So here is the foredeck ready for installation on the model.  You can see not only the railing and the scuttle for the halyard, but some additional features whose construction is pretty straightforward:  the smokestack for the galley stove, a small grating for the galley, a set of riding bitts with sheaves (also quite low to the deck), the mast coat, eyebolts for hooked rigging blocks, and that curious rigging fitting with ten cleats set onto the deck.
     
    14
     
    And here it is, installed.  Newly added are the catheads for the anchors, which are secured to the deck with headed bolts and the timberheads around the low bulwarks, secured with metal pins.  You can also see how the ramshead block was led up through the scuttle.  It was a tight squeeze but it made it, and then the scuttle was mostly closed off with wood battens to help keep the lower deck dry.
     
    16
     
    Next time, the gangways and quarterdeck, including the whipstaff.
     
    Be well
     
    Dan
     
     
  8. Like
    shipmodel got a reaction from JerryTodd in USS Saginaw 1859 by catopower - FINISHED - 1/8" scale - paddlewheel gunboat - first ship built at Mare Island   
    Hi Clare -
     
    No need to fake the elevating screw mountings.  You obviously have the skills to drill the holes in the cascabels.  For my Swan 42' model I had to drill 0.012" holes through 0.040" brass rod.  Here is how I did it -  maybe it will work for you. 
     
    First, cobble up a simple wooden board with glued on battens that will snugly hold the cannon barrels (see photo below).  Chuck a high speed drill bitt into a Dremel.  Start with one that is smaller than you want the final hole to be.  Check that the bitt spins exactly on its axis and does not wobble.  If it does, rechuck it in another spot. 
     
    Dip the end of the bitt into household oil. Holding the barrel firmly in its jig, bring the drill bitt into contact with the metal where you want the hole to start and make a small depression.  Re-oil the bitt (do this at regular intervals and any time the bitt seems to be working too hard).  Take your time and back the bitt out occasionally.  I did not have to go through much metal, so I did it with a hand-held Dremel, but you could do it with your Sherline or a Dremel drill press. 
     
    Once the first hole is made you can expand it to final size with a large bitt.  This hole should go much faster and easier than the first.  Now you can feed a miniature screw rod through it to make a very realistic elevating screw.
     
    Hope this helps.
     
    Dan
     

  9. Like
    shipmodel reacted to michael mott in Skipjack by michael mott - 1/8th scale - SMALL - 19 foot open launch   
    Set up the table of offsets to machine the curved inner surface of the oil pan, and after two hours of cranking the block back and forth the shape slowly emerged. I lowered the cutter .010" for each pass.  Next I will cut away the negative areas where the cranks will rotate and either side of the bottom of the crankcase then flip it over to finish off the bearing recesses. then a brass shell will get soldered onto the cross members, creating the hollow shape.
     

     
    I made it this way because I was stumped as to how to get the inside shapes of the oil pan, I suppose I could have set up a boring bar and scooped out the recesses the only issue with doing it that way was being able to have an opening underneath the central bearing beam to allow the oil to move about in the bottom and equalize rather than being isolated to each recess. the other advantage to making it this way is is that I will be confident that the wall thickness will be consistent.
     
    Thanks for the likes.
     
    Michael
     
     
  10. Like
    shipmodel reacted to michael mott in Skipjack by michael mott - 1/8th scale - SMALL - 19 foot open launch   
    Thanks for all the likes and encouraging comments.
     
    I had to make another cutter to make the recesses in the main flanges
     

     
    I have already drilled the holes to accept the camshaft bearings they are larger because I need to be able to clear the raised cams.
     

     
    An overall shot of the progress to date.
     

     
    A close up of the new cutter, I needed a long reach with a small diameter cutting edge to fit next to the body of the case. it is hardened drill rod the diameter at the cutting face is .086" The bolt holes are .060 and the case it tapped ready for the 0x80 bolts.
     

     
    Michael
  11. Like
    shipmodel got a reaction from CharlieZardoz in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  12. Like
    shipmodel got a reaction from archjofo in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  13. Like
    shipmodel got a reaction from tlevine in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  14. Like
    shipmodel got a reaction from druxey in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  15. Like
    shipmodel got a reaction from dvm27 in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  16. Like
    shipmodel got a reaction from seargent spectere in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  17. Like
    shipmodel got a reaction from Wintergreen in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  18. Like
    shipmodel got a reaction from texxn5 in Licorne 1755 by mtaylor - 3/16" scale - French Frigate - from Hahn plans - Version 2.0 - TERMINATED   
    Looks good, Mark.  Smooth and symmetrical.
     
    Dan
  19. Like
    shipmodel got a reaction from mtaylor in Licorne 1755 by mtaylor - 3/16" scale - French Frigate - from Hahn plans - Version 2.0 - TERMINATED   
    Looks good, Mark.  Smooth and symmetrical.
     
    Dan
  20. Like
    shipmodel got a reaction from tarbrush in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  21. Like
    shipmodel reacted to mtaylor in Licorne 1755 by mtaylor - 3/16" scale - French Frigate - from Hahn plans - Version 2.0 - TERMINATED   
    Thanks for the likes and comments. 
     
    Finally... happy dance time again.  At least a small one..
     
    It took me several tries but the top transom is done and in place along with the stern timbers.   I used some pen blanks as I didn't have any stock of cherry, boxwood, or pear thick enough.  The final ended up in yellowheart.  Thankfully, it will hidden by the planking. 
     
    I cut the curve (which doesn't quite match the deck camber per the plans) on the top and bottom.  Spot glued the waste back on and then the cut the curve of the stern.   A soak in alcohol and the piece emierged.   Notches were cut into the timber for the deadwood and frame timbers.  Everything was then finessed into postion per the plans.  The photos I contrast corrected helped a lot.  Then the stern timbers were cut and matched to size and finessed into position.   The further outboard the timbers go, the longer they get.     I've checked and rechecked as these two bits are critical to the stern being right. 
     
    I still have a lot more work in this area, but at least I know I won't be scrapping this one out because the stern was a hopeless cause.  Just a small amount of fairing needs to be done before planking but I feel the rest of the framework should be added first to give it some strength.  Those timbers are bit fragile as they are now.
     
    Here's the pics.   Sorry, I forgot to take pictures of the process.  As always, you click on them for enlargement.  
     

     

     
     
  22. Like
    shipmodel got a reaction from hexnut in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  23. Like
    shipmodel got a reaction from yvesvidal in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  24. Like
    shipmodel got a reaction from dgbot in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
  25. Like
    shipmodel got a reaction from WackoWolf in Queen Anne's Revenge 1710 by shipmodel - FINISHED - 1/36 scale   
    Hi again, and thanks for the likes and compliments.  
     
    It is going well, I think.  I am trying to create the look of a working ship, rather than one fresh off the building ways.  
     
    Now that the foredeck is installed, I turned to the waist.  With the cannon rigged out they can be covered by the gangways.  But first I decided to put in the ropes that go through the hull and belay below the gangways.  It would have been much harder to do them with the gangways in place.  These are the main course tack that goes through the chesstree, and the two sheets that go through the sheaves in the hull.
     
    These lines will be some of the larger running rigging ropes and, because of their locations, some of the more visually prominent ones.  They have to be good quality and look like miniature rope.  I could have laid them up on my ropewalk, but I have a few spools of treasured Cuttyhunk Irish linen line (which is no longer available for any price).   The Zane Grey and Natural colors are too white, but a quick run through Minwax wood stain in Ipswitch Pine color makes them look the right shade.
     
    1
     
    Even examined closely this gives them the look of miniature rope.
     
    2
     
    I fed the line through the hull openings.  The larger line (C-21) was used for the tacks which belayed to cleats, while the smaller one (C-12) was for the sheets.which belayed to the staghorn kevil.
     
    3
     
    Although each line is tied off properly, they were all further secured with dilute white glue.  When dry the ends were nipped off and hidden by separate rope coils.  I make these on a simple jig.  A block of soft wood - basswood in this case, but it could be balsa - has several holes drilled in the top face and one or two holes in the front face in the same line.  Removable brass pegs fit into the holes and everything is given several coats of clear finish to keep glue from sticking to it.  Then matching lines are wrapped around the pegs with the ends friction fit into notches in the jig.
     
    4
     
    As I wrap I randomly make larger and smaller loops and even the occasional figure eight.  When I have the look that I want, the coils are painted with dilute white glue.  Actually, they are first wet down with water, which helps the dilute glue to penetrate the line rather than having it sit on the surface.  When the glue is dry the top peg is removed and the coil peeled up from the jig and trimmed.  Using dilute glue means that the coils are flexible while still holding their shape.
     
    5
     
    The coils are hung over the belaying points, teased into position where they look like they are hanging with the force of gravity, and secured with white glue.
     
    6
     
    7
     
    In the photos you can see the supporting knees for the gangways.  These were made as before by cutting and shaping a stick and then parting off individual ones.  After locating and installing the forward and aft ones, the gangways were glued in, then the middle two knees for each gangway were installed.  In the photo you can see the ropes that feed through the hull.  I left what I hope is more than enough to reach to the sails, but we will see when the rigging is installed.
     
    8
     
    The final fittings in the waist were the four ladders from the gun deck up to the gangways.  They were wider at the base than at the top, and were built up as has been detailed before as a stack, then parted off.
     
    9
     
    After individual ladders were parted off they were cleaned up, stained and installed.
     
    10
     
    Now that the waist was complete, I turned to the quarterdeck.  The railing that was built up last time was installed, then the whipstaff.  For those not familiar, this is an obsolete steering device that predated the wheel.  It consisted of a rotating fitting called a rowel set into the deck through which a staff passed before it hooked into the end of the tiller arm.  Moving the staff port or starboard turned the rudder.  It was not very efficient, but then most steering was done with the sails during this time.
     
    10a
     
    A hole was drilled in the deck and a piece of pear cut and sanded to fit.  The fore/aft slot for the rowel was carved into the pear piece, as were indentations for the staff clearance athwartships.  The rowel was turned from maple, and the hole drilled to allow the staff to have a sliding fit.  I set the staff at an offset angle and glued it in place.
     
    11
     
    You can also see the ladders from the quarterdeck to the poop deck on the roof of the captain's cabin.  These were made up as before, just a little taller than the gangway ladders.  Similarly, the post with sheaves for the lateen halyard was made like the fore and mainyard halyard fittings.  Along the bulwarks are staghorns and pinrails as drawn by Budriot.  I am not completely sold on the pinrails, which do not appear anywhere else on the ship, but they are certainly needed for belaying points.
     
    The four 4-pounder cannon were rigged and installed like the 6-pounders on the gun deck.
     
    12
     
     Now the deck fittings that were made up almost a year ago could be installed.  These were the companionway house, the officers' bench in front of it, and the two small binnacles.
     
    13
     
    The ship is now ready for rigging, which will start next month.
     
    14
     
    Until then, happy Thanksgiving to all and to your families.
     
    Dan
     
     
     
     
×
×
  • Create New...