Jump to content

archjofo

Members
  • Posts

    1,403
  • Joined

  • Last visited

Posts posted by archjofo

  1. Hello Friends,

    thank you for your encouraging comments.

    At the bow of the French corvette, a small seawater pump was installed. Through a water pipe with a suction sieve, water was pumped up.
    In the area of the underwater hull 3 more suction sieve were installed.

    post-763-0-05958400-1417725912_thumb.jpg

    This suction sieve I made out of brass sheet 0.3 mm.
    To prepare, I show the following Series:

     

    post-763-0-92046000-1417725992_thumb.jpg

     

    post-763-0-93108300-1417725972_thumb.jpg

     

    post-763-0-92046000-1417725992_thumb.jpg

     

    post-763-0-23895300-1417726010_thumb.jpg

     

    post-763-0-14799100-1417726043_thumb.jpg

     

    post-763-0-50540000-1417726059_thumb.jpg

     

    post-763-0-63027900-1417726084_thumb.jpg

     

    post-763-0-09129600-1417726104_thumb.jpg

     

    post-763-0-60008000-1417726156_thumb.jpg

     

    post-763-0-31036900-1417726186_thumb.jpg

     

    post-763-0-95778800-1417726214_thumb.jpg

  2. Hello,
    it has been some time since my last update to my building report.
    So I made in the meantime other small but important details. So the timberheads received post covers in roof form.
    Another detail to protect the hull from the anchor flukes was added.

     

    Here you can see some pictures.

    I hope that you like it,

    post-763-0-58787400-1417244983_thumb.jpg

     

    post-763-0-45603700-1417245101_thumb.jpg

     

    post-763-0-51839800-1417245326_thumb.jpg

     

    post-763-0-75080400-1417245390_thumb.jpg

     

    post-763-0-78984700-1417245447_thumb.jpg

     

    post-763-0-52652200-1417245174_thumb.jpg

     

    post-763-0-52922200-1417245272_thumb.jpg

  3. Hello,

     

    thanks for the nice comments.

    Another small detail has been made ​​for the French corvette.
    It is a roller on the Main deck .
    This is fixed in front of the main mast on the open Main deck .
    The making of this steering roller (height approx. 8 mm) was performed in three parts, which I turned on my little lathe. The roller was made of brass.
    post-763-0-15586200-1414951509_thumb.jpg

     

    post-763-0-25547700-1414951527_thumb.jpg

     

    post-763-0-78920100-1414951543_thumb.jpg    

    For what purpose this roller was used precisely, is what I can only guess.
    Because it is in the context with the guide rollers (tourniquet), I see a connection there with the messenger.
    I also hope on the expertise of one or the other on the forum that explain this more detailed

    post-763-0-62167000-1414951559_thumb.jpg

     

    post-763-0-88754700-1414951576_thumb.jpg

    To be continued ...

  4. Hello colleagues,

    thank you for your encouragement.

    Lately, I was not very productive. To this end, my scanty results:

    Various works: boarding ladders port side, eye bolts with rings for the deck and inboard.

    On the port side still had to be mounted the boarding ladders. This I had made ​​some time ago and given to appropriate explanations.
    post-763-0-71824000-1414785164_thumb.jpg

     

    post-763-0-24393100-1414785176_thumb.jpg

    For the open battery deck I made still eye bolts with rings, as well inboard of the gun ports, a total of 60 pieces. Also here is to note again that these differ in the size of the eye bolt on the outboard side.
    post-763-0-04816900-1414785188_thumb.jpg

    To be continued ...

  5. Hello Friends,

    today I show some news of my little naval shipyards.
    :)

    In the quarter galleries were still glued the window. The tiny windows were made ​​of acrylic glass. I have fixed this with Micro Kristal Klear.
    As a consequence I had to install wooden strips on the quarter galleries yet. These are just decoration.

    post-763-0-68102700-1413630465_thumb.jpg
     
    post-763-0-98967800-1413630485_thumb.jpg
     
    post-763-0-20279200-1413630506_thumb.jpg
     
    Soon it continues here again.
  6. Hello,

    your positive comments are always pleased me.

    With other fittings on the outboard walls I want to continue my report.

    In addition to various eye bolts with rings were also fittings to customize for the fore-channels.
    One of these fittings is used to hook the lower-studding-sail-boom.
    The other is for the mooring of the flying-jib-guys.

     

    I hope you enjoy the pictures.

     

    post-763-0-32545300-1412876116_thumb.jpg

     

    post-763-0-34290400-1412875719_thumb.jpg

     

    post-763-0-03151600-1412875979_thumb.jpg

     

    post-763-0-31994100-1412875732_thumb.jpg

     

    post-763-0-01689500-1412875763_thumb.jpg

     

    post-763-0-72693500-1412875781_thumb.jpg

     

    post-763-0-27726000-1412875794_thumb.jpg

  7. Hello,

    many thanks für the nice comments.

    In between, I will still show you how the portholes of the ventilation hatches are constructed.
    The glass body with a diameter of 1.3 mm were punched out with a specially prepared punch pliers from an acrylic glass plate.
    Then they were glued with Micro Kristal Klear in a brass tube piece.

    The brass tube piece has an outside diameter of 2.5 mm.
    post-763-0-62433200-1412450532_thumb.jpg

     

    See you soon ..

     

     

  8. Hi Mark,

    thanks for your kind words.

     

    Here is a little update, with other metal fittings for the outboard walls of the French corvette.

    I hope you enjoy the pictures.

    This can happen sometimes.

    post-763-0-09188100-1412092491_thumb.jpg

     

    Here's a look into my sorting box with various fittings.
    In this case also the support for the anchor and the boat davits are seen.

    post-763-0-47358100-1412092534_thumb.jpg

     

    Here you can see a scupper valves.

    post-763-0-72977500-1412092510_thumb.jpg

     

    The eye bolts to mount outboard.

    post-763-0-46383400-1412092559_thumb.jpg

     

    Drilling the bolt holes with a diameter of 0.3 mm drill is a very delicate affair. For one of these fittings 8 holes are to be performed.

    post-763-0-02115300-1412092589_thumb.jpg

     

    Finally, an overview.

    post-763-0-62102300-1412092611_thumb.jpg

     

×
×
  • Create New...