Jump to content

Recommended Posts

Posted

Fitting the Bowsprit Collars.
The first heart on is for the Inner Bobstay, followed by the Starboard and Portside Bowsprit shroud hearts. Two cleats on the Bowsprit prevent it sliding down.
Then comes the Forestay Collar and Open Heart.
Forward of this by around 9mm at scale is the Outer Bobstay Heart. This requires four cleats to be fixed to the Bowsprit.
Finally butting up against the outer Bobstay is the Fore Preventer Stay Collar and open Heart, which sits just behind the Jibboom chock.

Image

Using a needle to thread the lashing line between the two eyes of the heart strop. For this I am using 0.1mm Morope.
Image

 

Image

 

Image

What you see here is a deviation from the kit plans which show 6mm closed hearts for both Forestays, and 5mm deadeyes for the Bobstay and Bowsprit shrouds.
In accordance with Steel I have used closed hearts for the Bobstay and Bowsprit shrouds, but he also mentions the use of deadeyes. Lees suggests that deadeyes were used up to around 1840, so I reckon either is acceptable.

Image

 

Image

Before fixing the stop cleats I think it advisable to just check how the lines will sit so the stays etc are mocked up to get an idea.
I made the cleats from some 1mm square boxwood strip.

First time out of its case for Pegasus in a while.

Image

 

Image

This post brings my log up to date and marks the three year point in the build still a long way to go.

B.E.

Posted

Bobstays.
For these I am using 0.5mm line with a 0.25mm serving
On my Pegasus the Inner Bobstay is 121mm long and the outer 156mm. These are just a guide as lengths are likely to vary slightly depending where the hearts are secured and the length of the lanyards.
A little more tricky to rig Bobstays as the line has to pass thro’ the holes in the knee of the head before forming the splice and heart seizing.

Image

You can get away with a cheat here for the splice, simply bringing the two ends of the line together, knotting, glueing, and trimming, and hiding it within the hole in the stem.
Image

The seizing is done with 0.1mm line.
Image

 

Image

 

Image

Proper lanyards will not yet be fitted just in case I need to get access for something I haven’t yet thought of, never be too eager to finally tie things off, leave them as late as possible.
Image

 

Image

The downward curve of the Bumkins can be seen here.
Image

I’ve just realised looking at this photo that I have fixed the lead sheet used to protect the Bowsprit from the wear of the Spritsail Yard slings the wrong side of the woolding. This has now been rectified.

Image

A final broadside shot.

That’s about as much as I can do on the Bowsprit rigging at present.

B.E.
 

Posted

Stays, Collars, and hearts.
This post is all about collars and stays and getting the right lengths and positions. I want to avoid as far as possible finding some way down the road that the Mainstay falls in an inconvenient position as it passes the Foremast, that the collar positions the heart correctly, and that the preventer collar heart sits the right distance on the Foremast below the Main stay.
All this requires a mock up, firstly to gauge the length of line necessary to make the Mainstay collar, and also to mark the position on the Foremast for the Preventer collar.

Image

The mainstay collar heart is got into the right position and the collar is marked where the eye splice needs to be formed.
Image

With the Mainstay position checked the heart for the preventer stay can be positioned on the Foremast.
Image

About 2 scale feet below the Mainstay.
Image

Satisfied that the arrangement will work, with no fouling of the wooldings the mock- up can be dismantled and work started on the proper collars.

The Main Stay Collar
Tricky little beggar this involving feeding a line thro’ the hole in the stem, forming a bight into which a closed heart is seized, an eye splice, thro’ which the loose end is passed and then taken back on itself and secured with three seizings. The latter requiring to be done on the model.
The main consideration is working out the correct length of line; Steel indicates six fathoms (171mm) of 8” served cable (1mm) with a 15” closed heart (6mm)

My test collar worked out at 147mm in length to bring the heart to the correct position.

Image

Starting the seizing around the heart.
For the collar I am using 1mm Amati line served with 0.1mm line.
The fiddliest part of this exercise which has to be done on the model are the three seizings that secure the collar where it returns on itself having passed thro’ the eye splice.

Image

The fact I’ve already fitted the horse and netting along the head rails doesn’t help.
Image

 

Image

 

Image

Main Preventer Stay collar
41/2” cable (0.6mm) I will be using 0.5mm line with a 0.1mm serving.)
11” heart 4.4mm.
This collar fits on the Foremast, again with two eye splices and a lashing on the forward side of the mast.

Image

I was interested to see if I could reproduce a Rose Lashing on this collar..
Image

but the danger at this scale is that it simply looks an untidy mess.
So this is the result; I call it the Star trek lashing – it’s a rose Jim but not as we know it!

Image

I think it shows something of the design but I had to draw a line at producing the finishing flourish of a pair of Wall knots on 01mm dia line.
This is what the Boys Manual of Seamanship has to say about it:

A Rose Lashing
A rose-lashing can be passed either with one end or two.
To pass a rose-lashing on one end, splice the other end into the eye of the strop or collar you are going to lash, then pass either from right to left, or left to right, passing it over the eye on one side and under on the other, until sufficient number of turns are passed to bear the strain equal to the collar or strop being lashed, which is generally about seven turns ; then the end is passed between the crossing turns twice, and dipped up through as near the centre of the seizing as possible, and is finished off by crowning and walling the end close to the crossing turns.
To Pass a Rose Lashing on both Ends of a Lashing.
The lashing is middled in the centre of one of the eyes ; the eyes are then passed, one under, and one over the eyes ; for instance, the end that goes over the right-hand eye goes under the left-hand eye, until sufficient number of turns arc passed ; the ends are then dipped, in opposite ways, through the crossing, each end twice each way ; both ends are finished off, as before, being crowned first, and walled after.

I may well re-visit this lashing to have another go!
A step backwards

Image

 

Image

The observant may notice that the Fore and Preventer stay collars have disappeared.
Having started to look at the closed hearts for the Fore and Mainstays my eye told me that the open hearts for the Fore stay collars are a tad on the large size relative to the closed versions I will be using.
The Fore preventer stay open heart will pass muster for the Fore stay heart but a new smaller version was required for the Preventer stay.
Sooo off come the hearts, collar and lashing n'all and out comes the mill, a tedious business this going over old ground but it’s no good leaving something that will niggle away forever if you let it pass.

B.E.

 


 

Posted

Picking up on the yards.
I last looked at the yards back in December 2013 and as I've now run out of options to distract me having completed the boats, I need to gee myself up to start again.
To recap I had reached the point of fitting out the Main Yard and one more Yard tackle pendants is required and a couple of other fittings before I move onto the other yards.
My intention is to complete all the yard fittings before I step the masts so that Pegasus can remain snug in her temporary case.
I'm not particularly looking forward to this part of the build as I find fitting out the yards repetitive, fiddly, and quite dull work.
To recap
The pendant is of 4½” served line (0.5mm dia) and the falls of 2½” line scaling to 0.3mm dia.
The length of the pendant including the stropping and eye splicing is 62mm.

Image

I found served true scale line too heavy for the block so I reduced it to 0.25mm line served with 0.1mm line which better suits my eye.
To make the pendant the line was served the required length with a good amount of unserved line either end.
The ‘false’ splice method was used to strop the block, and similarly to make the eye to fit around the yardarm.

Image

Here the excess serving line is being used to create a 'false' splice to form the strop of the LT block.
The needle pulls the serving line thro' the strop line and pulls the two together.

Image

The serving line end is then taken back thro' the strop, a few turns around the strop, secured with a spot of glue, and trimmed.
Image

A similar procedure is used to form the pendant eye that fits over the yard arm.
Image

A matched pair.

Outside of the Yard tackle pendants comes the Topsail sheet block with its associated lift block, and finally the brace block pendants.
These are the stats
Topsail sheet block 12" (5mm) with 4½" served line. 0.5mm Ø
Lift block 9" (3.5mm)
Brace block 8" (3mm) 3½" (0.45mm Ø) served line 14-18ft (67 - 86mm) long pendants.

The Topsail sheet blocks are interesting as they are shoulder blocks.
Won't find any of these commercially available as far as I know, so the first job is to cobble one together.
I am using 5mm Pearwood blocks.

To modify the 5mm block to give it a shoulder one end is filed flat onto which a small extension piece is glued.

Image

and then filed to shape

Image

This is the result.

Image

Stropping the combined blocks.
Image

Fitting for the eye.
Image

So Gromit d'ye think there's too much seizing between the blocks, hmmn I'm not too sure either.
I'll make up the other one with slightly less and review the arrangement.
B.E.

 

Posted

The shoulder block/ lift block combo are completed. I reduced the seizings between and beneath the blocks to make them more compact and closer to the yard.

I used 0.25mm line for the strop and 0.1mm line for the serving. Dyed Amati rigging line was used for the purpose.
The length of the served line was 45mm, although additional line length was allowed for the eventual securing to the yardarm.

Brace block 8" (3mm) 3½" (0.45mm Ø) served line 14-18ft (67 - 86mm) long pendants.

I have decided to leave the Brace block pendants and fit them insitu when I can get a better visual impression of the lengths relative to the model set up.

Image

 

Image

In these two shots my latest addition to the motley crew makes his first appearance. This Lemuel 'nimble' Jones, quite what he's doing on the Main top I don't know he's the newly appointed Helmsman, bit of an adrenalin junkie I've heard.
Image

So that's it a more or less completed Main Yard; I now need to repeat the exercise with the Fore Yard and whatever applies to the Cro'jack yard.
B.E.

 
Posted

Rigging the Foreyard
This is a summary of the Foreyard rigging, the procedure is the same as that for the Main Yard more fully covered earlier in the log. I record this simply as an aide memoire to the line/block sizes I used.
The first item I tackle is the Jeer block on the centre of the yard.
7mm single JB Pearwood block stropped with 0.25mm Amati line served with 0.1mm line.
For the double strop a served length of 85mm is required plus additional line to effect the splice to join the two ends together.
The Quarter Blocks - are next up, two 5mm JB Pearwood blocks stropped and served with 0.25mm line,38mm of served line was used. I didn't go to the trouble of making two eye splices in the strops with a seizing, too much effort with too little visual benefit.
Moving outwards the 9” clue blocks are next; these scale to 3.57mm. I have gone here with Chuck’s 5/32” single boxwood. These are a little overscale but I want to maintain a visual difference between these and the slightly smaller bunt and leechline blocks.
These should also have served strops with eyes but given the small scale I have forgone the pleasure of attempting this and simply used 0.25mm line for the strops.
Moving out along the yard the Bunt (8”) and
Leechline (7”) blocks are required next.
For these I have gone with 3mm pearwood blocks.
Note the kit plan include only the buntline blocks.
The smallest blocks along the yard are the 6”Tricing line blocks which scale to 2.38mm. (I used 2mm blocks)

 

Onto the Footropes and Stirrups
The Stirrups are of 3½” (0.5mm Ø) line and the Horses of 2½” (0.3mm Ø) Line. (I used 0.25mm line)

Image

Bob helps me determine the stirrup length below the yard, and a length of brass tubing threaded thro' the stirrup eyes and weighted holds the line taut.
Image

The Footropes are attached with a false eye splice to the yard arm, threaded thro' the stirrup eyes and attached outside the sling cleats with another false splice.
Image

The line is then weighted and coated with diluted wallpaper paste which imparts a stiffness to the stirrup and hopefully avoids any tendency for the footropes to curl under the yard.
The footropes are also coated in diluted wallpaper paste to impart a stiffness to them.

Image

 

Image

Bob does the final 'fit' test and it's good to go.
As with the Main yard two non regular types of block are required.

Image

The Thin Long tackle blocks for the yard pendants - these were scratch made from boxwood as covered earlier in the log and stropped and rigged as per the Main yard.

The Topsail sheet blocks are shoulder blocks and 5mm pearwood blocks were modified for the purpose again as per the earlier examples for the Main Yard. 4mm pearwood blocks were used for the 9" attached lift blocks.

I used 0.25mm line for the strop and 0.1mm line for the serving. Dyed Amati rigging line was used for the purpose.
The length of the served line was 45mm, although additional line length was allowed for the eventual securing to the yardarm.


The Cro'jack yard
Fortunately this yard is free from the multiple blocking and footrope requirements of the other two lower yards.. Just as well as I'm struggling to maintain interest for this block stropping malarky.
Necessary blocks
Sling tye block 10" = 3.97mm (I used 4mm Pearwood blocks)
Strop - 3" line = 0.38mm Ø (I used 0.4mm Morope)
Seizing - ¾" line - 0.1mm Ø

Image

The eyes and legs were made for this strop, not that much detail can be seen at the scale involved.

Quarter Block 10" = 3.97mm ( for these I used 5/32nd Syren boxwood blocks)
Strop -3" line = 0.38mm Ø (I used 0.4mm Morope)
I forwent the pleasure of forming stops with eyes and legs for these attachments.

Brace Pendant 2" = 0.25mm Ø 12' long = 57mm
Brace Block -
6" = 2.4mm.
The pendant is seized to the yard some 4' (19mm)in from the yard arm

Topsail Sheet Block-10"=3.97mm (I used 4mm Pearwood blocks)
Lift Block - 6" = 2.4mm ( for these I used 3/32nd Syren boxwood blocks)
*Strop 1½" = 0.189mm Ø

*Note: The ffm (page107) indicates that the sheet and lift block combinations are stropped with 1½" line. I believe this to be a typo error, and I have used 0.4mm Ø line for this purpose.

Image

The completed fittings on the Cro'jack yard.
B.E.


 

Posted

A small progress and a little modification that is fairly easy to make.

These are the Swivel gun mounts for the Tops. They consist of two lengths of 3x3mm boxwood strip, with three mortices for the gun mounts positioned to fall between the deadeye slots. These should be square in section but given the scale I have gone with round. The holes are lined with brass tube into which the swivel mounts fit by means of a sprig on the end.

The top of the mount should be covered by an iron plate, I have replicated this using thin black card.

So here's the Fore Top with mounts in place. For the present I have left them natural boxwood so they show up better.

Image

 

Image

 

Image

 

Image

B.E.

Thu Oct 23, 2014 11:02 am

 
Posted

This post begins the long road to rigging proper

Pendants of Tackles (Burton Pendants)
These are the first items of rigging over the Mast heads.For the Fore and main masts the Pendants are of 7" circ served line which equates to 0.9mm Ø and for the Mizen 3½" served line scaling to 0.44mm Ø
One pair of Pendants is used on each mast and a thimble is turned in the end into which the tackle blocks are hooked when required.Note: these important items of rigging seem to have been omitted from the kit plans, but if they are to be fitted they need to be attended to before the shrouds are fitted.There is a little bit involved with making the pendants, they should have a cut splice where they fit over the masthead, should be served all over, and have a thimble seized into the lower ends.

How to proceed?

Whilst I wait for my line supplies to arrive I have given some thought to creating the Pendants, and this is by way of a practice piece.

IMGP1735.thumb.JPG.f3d2df403b056f49540dd27f604c907f.JPG

I first I measured the length of line required to form the splice  over the masthead. This was served.

IMGP1737.thumb.JPG.07a16469d69e9c4b89948726ae41ad60.JPG

An additional shorter length of line was also served to match, with unserved tails each end. This second line was positioned and was secured with fine line.

IMGP1743.thumb.JPG.50f4b11d7c025de4eb912c36be3387e2.JPG

A needle was used to pass the 'tail' thro' the main line to secure it. The splice is thus formed

IMGP1758.thumb.JPG.f308d99ba905f8e312630f6a160ea0eb.JPG

The combined line was then served either side for the required length.

IMGP1746.thumb.JPG.46c6174938554101de9b2900617aa904.JPG

The splice was tested for fit over the Masthead.

IMGP1765.thumb.JPG.28248149dfc85c86059500aced334459.JPG

Thimbles were seized into the lower ends of the served line.
Steel does not give the size of the thimbles in his tables but the ffm book takes a punt at 4-5" Ø.

This scales to 1.6 - 2.0mm.

IMGP1770.thumb.JPG.952575be19ada33d1193a9548c9b0c63.JPG

I've used Amati 2.5mm thimbles and it's difficult to  see how anything any smaller would accommodate the served line.

One of my concerns is that the seizing of the thimble doesn't look too bulky, some work required on this I think.

IMGP1772.thumb.JPG.661e617bf623436f6decfd36be24adc9.JPG

Once completed the whole thing was dunked in the dye and this is the result.

IMGP1776.thumb.JPG.17475fdd0e3c6cd1129e03dac2e20a5e.JPG

For this exercise I used Amati 0.75mm Ø line served with Jotika 0.1mm Ø line. which on paper is a little under scale, but which doesn't look too bad to my eye.

Now I've established my approach I will remake a sample pendant using Chuck's 0.88mm Ø line when it arrives.

B.E

Posted

Fretting over Pendants

Now that the Syren line has arrived I can have a go with the proper stuff.

For the Main and Fore pendants I am using 0.88mm Syren line and 0.15mm Morope  for serving.

The materials

0.88mm syren line

0.15mm Morope  for serving.

The  sizes

17mm length of splice section.

59mm from splice join to end (allowing for turn in of Thimble)

130mm o/a length of Pendant

The procedure

IMGP1781.thumb.JPG.608b494a3e7284f02452713fc71edfcc.JPG

The Pendant line is thinly coated with pva to help secure the serving line and keep it tight.

The combination of Syren line and Morope serving works well, no fuzz.

The method then follows that shown in the previous post.

IMGP1794.thumb.JPG.54c80ecc365cb5a3b6b142d4ce0d993d.JPG

At the thimble end the served line is carried around the thimble until the served ends meet and the tail length of excess serving line is taken thro' the served line using a needle to secure.

IMGP1801pic.thumb.JPG.4b0a46b6f6ba863352d2c03ca9f6fa57.JPG

The excess unserved pendant line is sliced at an angle to reduce bulk for the seizing of the thimble.

IMGP1805.thumb.JPG.d2ec0eeb2c01868cc38a3814ad7d06bb.JPG

The wooden Amati 2.5mm ( but nearer 3mm) thimbles are modified by enlarging the hole to reduce the profile, and by deepening the groove around the edge.

IMGP1808.thumb.JPG.ed1e1948318d31ef810b90a33980e573.JPG

IMGP1815.thumb.JPG.9747ec80484a0b6fa9594721bee04ff9.JPG

Happy with the upper splice but still have niggles about the thimble look and seizing.
The Mizen Burton Pendants

One pair on the Mizen, using Syren 0.45mm Ø line. served with Morope 0.15mm Ø line.

15mm of splice section, 40mm length to turn.

IMGP1819.thumb.JPG.2e1f14153ea96bae626af045a4231933.JPG

For the thimbles I tried slices of 2.3mm Ø styrene tubing.

So the full set.

IMGP1833.thumb.JPG.b3d1d3c1968ee790cba7d0284ff335ac.JPG

B.E.

Posted

Stepping the Masts and the lower rigging begins

Resuming work on Pegasus, I have now reached the stage to mast and start the lower rigging.

I start the process by fixing the Mizen Mast. I use the merest spot of pva to secure the mast, sufficient to keep it in place, but would allow removal (hopefully)by a sharp twist should the need arise.

The rigging will start with the Mizen and I will work my way forward so as not to impede access to fixing the Mizen and Main Stays.

The Mizen shrouds are of 4½" circ line which equates to 0.57mm ø; I will be using Syren 0.63mm ø line.

I am using the original tan Syren line dyed with Dark Jacobean oak woodstain. This produces a tone less than black which I think suits the scale and my eye better.

The shrouds are served over the centre quarter section, and for this I am using 0.1mm ø line.

Syren don't make a 0.1mm ø line so I tried some Amati stuff but this has proven unsatisfactory because of excessive fuzziness, so I have reverted to Morope 0.1 and 0.25mm stuff for serving and seizing which is well defined and is fuzz free.

IMGP2149redmsw.thumb.JPG.446124c597a396e849fab726af508053.JPG

The first job is to mark where the serving will extend to; this is done on the model.

IMGP2174redmsw.JPG.51ed4b289dbfa207cfcae801f5658a18.JPG

I prefer to perform the seizing off the model and to this end a 'mock' mast head held in a vice is used. This is easier on the arms than seizing directly on the model and the completed shroud pairs are simply then slipped over the masthead proper.

IMGP2167redmsw.JPG.f088c81bc35e62d65e8a29a97d125f16.JPG

The deadeyes for the Mizen shrouds are 7"ø which equates to 2.77mm at scale. I am using Amati 2.5mm ø which work out at around 2.7mm, about right for the purpose.

My approach to shroud rigging is to do it entirely on the model setting up the starboard pair first and adjusting the line of the upper deadeyes as I move along. This can prove a frustrating exercise, particularly when somewhat 'ring rusty' after a five month lay off.

IMGP2193redmsw.JPG.acb2a3794d9a22991b4b16db1c3ef377.JPG

The lanyards are of 2½"circ line which scales to 0.3mm ø line, which Syren do produce.

Note the nice definition of Chuck's 0.63mm and 0.30mm line.

The lanyards will not be tied off and trimmed until much later in the build.

B.E.

 

 

 

Posted

The Mizen Stay.

The Mizen Stay is of 5½" circ. equal to 0.69mm ø at scale. I will use Syren 0.63mm ø which the closest size I have.

Making a stay involves a couple of tricky little procedures.

Firstly the stay has an eye spliced in one end and is then served* down to a point a little beyond where the mouse will be fitted.

*A note about  ffm Vol iv (p50) The Mizen stay is covered first, but there is no mention in the text that the stay should be served to a point below where the mouse is fitted. Not until p52 is reference made to serving the line in relation to the Main Stay, with a referral back to the Mizen.

IMGP2201REDMSW.JPG.47fa058e7520e21eaae6b967d88fbc1c.JPG

Once the serving is started and the eye formed the line can be put on the serving machine to complete the eye.
It is then necessary to work out how far down the stay  the serving should go.

IMGP2205REDMS.JPG.8c055987523a82fe08f0958aa75c8c08.JPG

The limit of the serving is marked.

IMGP2208REDMSW.JPG.99b5079945d29b1f73db6c7edf86bfed.JPG

The serving is completed. (It will be dyed later)
0.1mm ø Morope line is used for serving.

IMGP2214REDMSW.thumb.JPG.687ae2ed34a52e6450b7454bcb0f0d0a.JPG

Trial fit on the masthead.

Making the Mouse.
The full size Mouse is some three times the diameter of the stay which scales to around 2mm max diameter.

I have formed mine from Evergreen styrene tubing of 2.4mm diameter. This fits nicely over the served stay. The mouse is a tad under 5mm in length.

IMGP2220REDMSW.JPG.d0b9ee5871994f14fd8d9a81a04796a4.JPG

Forming the Mouse

IMGP2223REDMSW.thumb.JPG.f55346fd3d8c0ca12d5256ad02417fc7.JPG

Using a scalpel and fine paper the cone is formed.

IMGP2227REDMSW.JPG.c40f0465db8aa5a989884d8f9bd5a717.JPG

Trial fitting of the Mouse.

DSC02847REDMSW.thumb.JPG.7301ce57a8296646591c7ac87734f976.JPG

The real mouse is woven on the stay which would give a patterned effect. To replicate this I apply c.a. to the mouse and then stretch  some old tights material donated by Mrs W over the mouse and trim. The mouse is then painted and an impression of weave is imparted.

The next part will cover the completion of the stay by the addition of the hearts and lanyards.

B.E.

Posted

Mizen Stay cont'd

Before I determine the length of the Mizen Stay I will attach the Mizen Stay collar to the Mainmast. This involves seizing a 5" heart (2mm at scale) at a point  around  seven feet (33.3mm) above the Quarterdeck.

The requirement is for served 4" (0.5mm) line lashed with ¾" line on the forward face of the Mainmast.

I have gone with 0.4mm Morope served with 0.1mm line

I find these tricky things to get right as two eyes have to be formed in the legs of the collar, but sufficiently apart once around the mast to allow for the seizing.

A mock  collar is required to determine the length.

IMGP2253REDMSW.thumb.JPG.cdabdba3eed3b1cd5a58f7ef28bbf150.JPG

The finished strop is 43mm in length.

IMGP2258REDMSW.thumb.JPG.633b6e1227f62dc312452f5145c6fd11.JPG

Trial fit around the Mainmast.

IMGP2270REDMSW.JPG.b5a6fca15022b58de74eba8af57fff3b.JPG

Seizing in the lower heart.
The next stage will be to set the Mainmast which will then allow fitting the lanyard to the Mizen Stay.

B.E.

Posted

Hello B E,

 

             I was so upset with what had happened. Your followers like myself have been biting there nails with such a fantastic log.

             But now you are back with all of us, we shall all rejoice and celebrate your home-coming.

            

             Keep it up B E  your work must not be lost:)

Saving for: HMS Vanguard...Victory models.

finished: Bluenose11...Billing Boats... (sorry no log.

Posted

At this point before the Mainmast is glued into place I need to consider any other attachments that may be better done with the mast off the model. I have in mind the Mizen Topmast Stay.
The lead for this stay allows for several options, David Antscherl  (Vol1V) has  opted for a lead thimble stropped below the Mainmast hounds.I have decided to opt for the arrangement whereby an eyebolt is fixed thro' the aft crosstree of the mainmast top and a thimble /lanyard arrangement is used to secure the Mizen Topmast stay.

So the Mainmast is fixed; using pva there is time to view from all angles to ensure that the mast is set square to the centre line. I like to set the model on the floor so I can view it directly from above.

DSC02889REDMSW.thumb.JPG.6fbec83da6609f7e7cc53aab897591fe.JPG

What do you think Wills does it pass muster?

IMGP2296REDMSW.thumb.JPG.38198f3ef1a253695b3ccb3895da3bb1.JPG

The Mizen Stay is now attached by its lanyard.
2½" (0.3mm)lanyard.

IMGP2291REDMSW.JPG.cf4d45a190c3c9136c07560984186453.JPG

IMGP2294REDMSW.thumb.JPG.0129d5c19ac6ad4b6be1be8a818d8c9f.JPG

So for the present this is as far as the Mizen Standing Rigging is taken.
I will next deal with the Main Shrouds.

B.E.

 

Posted

I can only echo what so many others have said. It's great that you were willing and able to recreate this great log. It's been my pleasure to go through it all again.

 

Bob

Posted

Woah, she is an utter beauty, I am toying with looking at a Pegasus build after I have finished my supply and you have done a beautiful job indeed. The log is superb to say the least and what a log to follow for the future. Many thanks for making my mind up for me. ;-)

 

Terry

Current build: Caldercraft 1:64 HM Brig Supply

 

Finished builds: HMS Endeavours longboat

Posted

B.E.

 

A thanks for what you're doing.  I was expecting the "executive summary" like many of did after the Big Crash of '13.   This is very well done.   I'm happy to see it back as I'll be using some of your methods (especially the boats) on my build.

Mark
"The shipwright is slow, but the wood is patient." - me

Current Build:                                                                                             
Past Builds:
 La Belle Poule 1765 - French Frigate from ANCRE plans - ON HOLD           Triton Cross-Section   

 NRG Hallf Hull Planking Kit                                                                            HMS Sphinx 1775 - Vanguard Models - 1:64               

 

Non-Ship Model:                                                                                         On hold, maybe forever:           

CH-53 Sikorsky - 1:48 - Revell - Completed                                                   Licorne - 1755 from Hahn Plans (Scratch) Version 2.0 (Abandoned)         

         

                                                                                                                                                                                                                                                                                                

Posted

The Main Shrouds

These are of 7"* circ line scaling to 0.88mmø

* Note: there is a typo error in my copy of ffm Vol 1V  (p50) which indicates 10" line for the Fore and Main Shrouds.

The kit Mainmast shroud configuration differs a little from the ffm Vol 1V layout.

The book version shows a single foremost shroud cut spliced around the masthead, followed by four pairs of shrouds. (nine in total each side)

Aft of these are a single Topmast Backstay and a single T'gallant Backstay.

The kit version shows four pairs of shrouds, (which obviates the need to splice around the masthead) three standing Topmast backstays, a T'gallant Backstay,and a Flagstaff stay.

I have followed the kit arrangement .

Steel indicates three topmast backstays.

For the first pair of shrouds serving is required for the full length on the foremost shroud, and for a scale eight feet on the second and subsequent shrouds.

This serving business.

IMGP2309REDMSW.JPG.e84d437c0a01b7ccd2ad856c05b6f568.JPG

On the model this is the longest section of serving required. I have used 0.1mm Morope and it took around 5mtrs of line to complete the job. Unfortunately the supplied lengths of Morope 0.1mm just fall short of the required length for a continuous  run.

IMGP2311REDMSW.JPG.381edc256ad0b276adf080af73bd36d2.JPG

The line will be dyed after completion.

IMGP2298REDMSW.thumb.JPG.67b87608920a0e70b1bacfbacf4b1d70.JPG

Trial fitting the served shroud. One of the downsides of serving the full length of a shroud is that it tends to stiffen and kink the line.

I find that the line needs a little tensioning before fitting to straighten it out.

IMGP2301REDMSW.JPG.7886dd594b0636c667fcc98d9c8ca038.JPG

Tensioned and dyed the line is now ready for fitting.
To recap I am using Amati 3.5mm deadeyes which actually measure around 3.8 -3.9mm. near enough to the 4mm scale required for a 10" deadeye. (The kit supplied deadeyes are over-scale at 5mm+)

With the shroud served it is formed around the false masthead and seized.

IMGP2320REDMSW.thumb.JPG.d89b5dd996bcb4b1d2e231a81accdf8a.JPG

I have used 0.1mm morope for the seizing.

Turning in the deadeye.

I like to set the first one up with a distance that suits my eye and then match the others to it.

For the first (served) shroud I have slightly deepened  the deadeye groove.

DSC02955REDMSW.thumb.JPG.92face44bef27a64f54ee561110567a6.JPG

At this scale I don't bother too much with the throat seizing which will be hidden anyway by the lanyard excess. Having set the deadeye at the required distance I use some thin line to secure the 'throat' with a simple overhand knot, but which allow for minor adjustment in the position.

DSC02948REDMSW.thumb.JPG.c1c91236fa69c48ca9b18a3e7c51370c.JPG

The lanyard is of 3½" circ line which scales to 0.44mm ø line. I am using Morope 0.4mm.

DSC02943REDMSW.thumb.JPG.bddb7bbd48b0aee2a6b9ba5ba828d661.JPG

It did not prove to be a problem  securing the served line with its additional bulk around the deadeye.

DSC02945REDMSW.thumb.JPG.c928cc60591f5038074e6faa53b88a0e.JPG

Final tensioning will be done once the set have been fitted.

B.E.

 

Posted

Completing the Lower Main shrouds.

The Main Lower Shrouds have now been installed.

IMGP2342REDMSW.thumb.JPG.7ed33cb2d546169bd5f3d615b933b4bf.JPG

Here a close-up of the seizings before staining.

The 0.1mm Morope line is ideal for the serving having good definition, is as fine as is available so as not to oversize the finished line, and is completely fuzz free.

The downside is it only comes in 4-5 mtr lengths, takes an inordinate amount of line to serve the shrouds, and it is a pain to transfer to a spool without having to unpick a tangled mess, part way thro' the process.

IMGP2359REDMSW.JPG.9f5c2d48184b4690c0eb5c4cb4948731.JPG

Starboard side run.The lanyards which are also Morope (0.4mm) will remain  loose until much later in the build.

DSC03063REDMSW.thumb.JPG.a6dd5398eafdbec50b8aff3cac8103e4.JPG

One problem I have found is that having served all the centre sections of the shroud pairs the space in the lubber hole is very crowded and the aft crosstree of the Main top cramps the aftermost pair of shrouds.

Still the beauty of rigging the shroud pairs properly is that they are easily removed for adjustment, at least.

DSC03055REDMSW.thumb.JPG.28c332cc054d5ec715c91914b584bff3.JPG

On the subject of serving the centres of the shrouds; as the pairs move rearwards the line of the served section below the hounds  appears shorter because each successive pair sits atop the previous one.

On a scale model I think this can look a little untidy if the length differences are too great or uneven so I have sought to reduce the difference somewhat by adding an extra mm length of serving to each successive pair.

IMGP2362REDMSW.thumb.JPG.43ec2f8eaaa52a28f41c7eaddfdddfa7.JPG

The next stage will be to make the Main stays and step the Foremast.

B.E.

Posted

The Main Stay

 This is the largest stay on the ship at 10" circ equal to 1.26mm ø at 1:64 scale.

 Syren supply line in 1.37mm and 1.14mm diameters, so do I go high or low? we are only talking 0.1mm difference in the diameter either high or low.

I have decided to go high at 1.37mm

David Antscherl mentions in ffm that the Main Stay in addition to the serving down beyond the mouse was also served where it passes by the Main mast to prevent premature wear.

This sounds reasonable but I've yet to find a contemporary model where this is apparent.

DSC03075.thumb.JPG.77c7a647587e89fd36975a65383e7c63.JPG

I have opted to have the preventer stay running below the Main Stay not least because it lies better that way.

Having served the lines  I turn my attention to the Mouse.

Mouse -Main Stay

L = 1/3 circ of stay = 3.96mm

ø = 3 x ø of stay =4mm.

DSC03078.thumb.JPG.8e50e0ccfd3b9ec150a530f733dbe31b.JPG

To make the Mouse for the Main Stay I used styrene tubing; a length of 3.2mm ø tubing inserted inside a length of 4mm ø tubing. This gives me the required external diameter whilst having an internal hole that fits the served stay.

DSC03083.thumb.JPG.426c34c1d2d4acd67cc040cc6e644f41.JPG

The Mouse is formed using files and fine sand paper.

DSC03085.JPG.2935c2865f14a6f70ae650273ac6b5db.JPG

 

DSC03086.JPG.8726fff3464d543dec60254d45a21a49.JPG

Trial fit on the stay.

IMGP2393.JPG.1933bcf8cc1d8fba73f7f790d8c8dcab.JPG

Imparting the weave.

IMGP2391.JPG.cb7218cb6d66f22a89f5327a0cf23437.JPG

The mouse is  painted with ca and with the net stretched over and secured sufficient weave effect is achieved at scale.

The Main Preventer Stay is of 7" cable (0.88mm ø) which is the same as the shrouds.

Mouse -  Preventer Stay

L =1/3 circ of stay = 2.77mm

ø = 3 x ø of stay =2.64mm

The Preventer stay and Mouse are prepared as the Main Stay, and the next post will cover installation and attachment of the hearts.

B.E.

Posted

Rigging the Main/Preventer Stays - cont'd

I note that in ffm the Main stay passes through the eye on the Port side both for stays, but I recall from my Victory building that Longridge shows the eye for the Mainstay on the Starboard side and that for the Preventer on the Port side.

I don't know how significant this is, and I have seen examples of both arrangements, but I intend to have the mouse on the Port side for the Main Stay, and Starboard side for the Preventer Stay.

IMGP2395.thumb.JPG.6db3733619c2852d6fbea6983d6a0295.JPG

The completed Mouse unpainted.

IMGP2413.JPG.adcf5c4e1513949810f5f6306741e0ad.JPG

A close-up of the Mouse in place on the stay.

At 1:64 scale I am quite pleased with the effect, this is many times the actual size of the Mouse.

The other end of the Stay

A 15" heart (5.95mm)is attached to the lower end of the stay seizing 1½" (0.19mm)

IMGP2418.thumb.JPG.fdfb5f055150690eb84468ab42582695.JPG

Commencing the throat seizing on the heart.

IMGP2420.thumb.JPG.aa6ab150c2556ca5f9b8841cdb0a7603.JPG

Seizings completed.

IMGP2417.JPG.f6d350545b91607cafcd14678a0d2f57.JPG

It helps to have a third hand for this sort of stuff.

IMGP2423.JPG.a68d5f27ef79fd18fb0f1652427eca75.JPG

Lanyard attached.

The lanyard is of 3½"circ line (0.44mm ø at scale) This is from Steel;

The ffm indicates 2" which seems a little fine or is maybe a misprint.

IMGP2425.thumb.JPG.a764bf0667f8084ec0dc2b389cd29a64.JPG

 

IMGP2424.thumb.JPG.afc9f2daecd50ef844640f9cb8bc5a44.JPG

The lanyard will not be tied off until later in the build.

I now need to step the Foremast before the Main Preventer Stay is fitted.

B.E.

Posted

Attaching the Main Preventer Stay

Main Preventer Stay Heart 11" (4.4mm) lanyard 3"  (0.38mm)seizings  1.0mm.

IMGP2445.JPG.3084305c913cecfc7240378fc753f6d3.JPG

The Preventer has already been prepared complete with mouse so there only remains to fit it over the masthead and down thro' the Main Stay. The closed heart is attached as on the Main Stay.

IMGP2446.JPG.e51c8bf6c712705be8b24635198f8ff2.JPG

I have used a Syren* 5.5mm heart which is only a fraction oversize but importantly looks right.

*These hearts supplied by Chuck really are an excellent idea, and save a lot of fiddling around.

0.4mm Morope is used for the Lanyard, which in respect of the Preventer Stay needs to be tied off because the job would get far more difficult once the Fore Shrouds are in place.

I find tying off the lanyard quite tricky as the free end should be lashed to the adjacent turn to finish. It is so tempting to expend the excess by turns around the middle of the lanyard set up, which is a far easier option.

IMGP2448.JPG.9f41a49ed601aa50bb535392ec74a1bd.JPG

I use a small clamp to ensure that the Collar of the Preventer Stay doesn't ride up over the shrouds whilst I am fitting the lanyards.

IMGP2461.thumb.JPG.1653f3b2a734d98f93e99a54248bd4f3.JPG

 

IMGP2453.thumb.JPG.f117159b0cc14efb3a58e68527bc0a7e.JPG

IMGP2457.thumb.JPG.ce404bd28b24a4a9549c1fdbc823dd7f.JPG

The completed lanyards.

The seizings will be dyed  but the lanyards will be left natural.

I now need to prepare and fit the Fore Shrouds.

Regards,

B.E.

Posted

B.E., Thank you for doing all the work and getting a replacement log up! Your build log was such a treasure of information . . . and besides that just a pleasure to browse through due to all those wonderful, highly detailed pictures and descriptions of your marvelous model! 

 

Thomas

Current Built:   Model Shipways  Syren  (US Brig 1803)

 

Last Built:        Anfora (kit bashed)  Ictineo II  (1st steam powered submarine 1864)

 

Posted

The Fore Shrouds

7" circumference  line (0.88mmø) as per the Main shrouds is used. 0.4mm ø Morope for the Lanyards, and 0.1mm for the seizings.

Configuration of shrouds.

These consist of three pairs each side plus a single spliced making seven shrouds each side.

Both the kit and the ffm plan follow the same arrangement.

The ffm however suggests that the 'single' spliced shroud should go over the masthead first after the Burton Pendants, whereas the kit plan indicates the 'singles' are last over the Masthead, although they show a simplified seizing around the mast head rather than a cut splice.

My understanding is that singles were called 'swifters' and were always last over the masthead with a cut splice, this is the arrangement I have followed.

IMGP2467.thumb.JPG.c5f5f5426e0e04a4dbfe4906981c89cd.JPG

 

IMGP2478.thumb.JPG.2f25de455767c7734329a08635cc8238.JPG

 

IMGP2479.thumb.JPG.8ce858d25ab6e77a95edd24fb9c95144.JPG

Fore shrouds completed but yet to be made taut by securing the lanyards.

 

Fore Stay

9½" circ  cable = 1.2mm ø line -I am using Syren 1.14mm line.

13" closed heart = 5.2mm. lanyard 3½" (0.44mmø)

Mouse = 3.42mm ø L =1.25mm

The Fore and Fore Preventer stay collars were made and attached to the Bowsprit  a fair way back in the build.

To recap these are open hearts, not the closed versions as supplied with the kit. They are scratch built of boxwood.

In the intervening time Chuck has produced some fine 5.5mm and 7mm hearts both open and closed which would have saved me the trouble.

 

IMGP2491.thumb.JPG.901c934e35abc5f0d77f35606290e258.JPG

Close-up of the Fore stay mouse.

IMGP2504.thumb.JPG.b2ad65c181f90a8412c55d93d37c3cd9.JPG

and the secured heart and lanyard.

Fore Preventer Stay

6" circ cable = 0.76mmø

10" closed heart = 3.96mm. Lanyard 2½" circ (0.31mmø)

 Both these stays are made as the Mainmast versions.

Mouse = 2.28mmø L = 0.79mm

For this stay I have used Morope 0.80mm ø line, and one of Chuck's 7mm hearts reduced in size a little.

IMGP2522.thumb.JPG.0da14d62f06d250779108a267e9365e5.JPG

IMGP2529.thumb.JPG.8f85769e6108e7f402161e68e0deca30.JPG

Fore preventer mouse.

IMGP2509.thumb.JPG.7c5e58b18b69507eb7bb3897f2946ab7.JPG

Lanyard fitted but yet to be secured.

IMGP2516.thumb.JPG.d9a4685b4c49a0ef807ad3a0273d8629.JPG

IMGP2518.thumb.JPG.822fe926015f575ad32b7205092c438b.JPG

The lower standing rigging now all in place, but requires some tidying up.

B.E.

 

Posted

The lower shrouds have now been tidied up and the lanyards secured. Only diluted pva has been used here to allow removal if required.

IMGP2609.thumb.JPG.4a2e97962d8de3dfe60717a6dce25df0.JPG

The Bobstays have also been attached by their lanyards using 0.25mm ø Morope.

A few photo's to mark completion of this stage of the build which is now in its seventh year, although I hasten to add that there have been long intervals when little was done to progress the build.

DSC03414.thumb.JPG.ec47fb1da495ad23cc2653fb81d34495.JPG

DSC03416.thumb.JPG.edb2076610df522c643192bbb8703e97.JPG

DSC03418.thumb.JPG.604f601dedd1381299ec20e5f3fe59ad.JPG

I will next be looking at the Futtock staves and ratlines.

B.E.

Posted

Futtock Staves

So this is a good time to fix the Futtock Staves which will determine the available space for the ratlines.

They are positioned as far below the top as the masthead rises above it.

The stave should be of served 4" line (0.50mm ø at scale)

For model purposes I prefer something a little more rigid than line; the kit suggests 1mm ø brass wire, which is a little over scale, but the problem is finding something that is rigid enough to withstand the pull of the futtocks but fine enough to look in scale.

David Antscherl (ffm) used drawn down bamboo which would have been only 0.6mm dia at 1:48 scale, although the serving would give additional support.

I have also gone with Bamboo drawn down to 1mm  for the Fore and Main shrouds and 0.9mm for the Mizen,which is the smallest I could get without the damned thing snapping given the length required. The staves were served with Morope 0.1mm ø line.

Diluted pva was smeared along the stave below the serving line.

In the ffm (and the kit instructions) the staves are attached to the outside of the shrouds, but on balance I think most British ships had them on the inside of the shrouds which is the method I have adopted.

IMGP2631.thumb.JPG.4cb54e4d9917a87c442bd557b9accfa8.JPG

It is a tad easier to fix them to the outside, but I think they sit better on the inside and the futtocks lie better.

58beb44690355_IMGP2629(4).JPG.2d1b33c7eaf9f05172ae353b930aa9c9.JPG

Attaching the staves seemed to take an inordinate amount of time.

58beb4687df36_IMGP2641(4).JPG.7b777982ebb11c88968925a8297702a2.JPG

They are blackened and the ends trimmed after painting with undiluted pva.

58beb4984871b_IMGP2643(3).JPG.f3a94ff060aff92bf12736d4b50a9e56.JPG

Onto ratline trials now, overhand or clove hitch, clove hitch or overhand? we shall see.

That Ratline business.

1½"line (0.19mmø) for the Main and Fore shrouds, and 1" (0.13mm ø) line for the Mizen.

A trial spacing  and knotting of the Ratlines was undertaken on the Mizen shrouds. I firstly wanted to check whether the overhand knot or the (accurate) clove hitch will look the best given the scale. No point having accuracy if the scale effect looks too bulky.

 

IMGP2660.thumb.JPG.013e3f9ae4f4e7b0e4aa12b7399ac00b.JPG

The top three lines are the simple overhand knot, the bottom three a clove hitch (apart from the first left hand )

 Having trialled the spacing I have decided on 13" which equates to 5mm. 15" spacing - 5.95mm (6mm)

IMGP2652.JPG.982e6a4d0457546834cc958a8f875156.JPG

My topman Bob seems to agree with the 5mm spacing, 6mm was just too much of a stretch.

IMGP2659.JPG.75034da1691d602e2a6a3dafe272331e.JPG

I have used Syren 0.2mmø line (.008 for you imperialists) which is a good fit for scale on the Main and Fore shrouds, a tad over-scale for the Mizen 1" line, but it looks ok to my eye.

IMGP2658.JPG.ce9859c23eeeee3e0460a09976511255.JPG

So decision made, Clove hitches for the knots, and a 5mm space.

I've never used the card with parallel lines drawn  as a guide for the ratlines system, preferring to use my eye and a 5mm spacer to check progress.

B.E.

 

 

Posted

I saw the pictures of your tiny boats and I have only just picked my jaw off the floor in amazement. This is truly superlative modelling. Well done. Incredibly well done. 

Regards, Keith

 

gallery_1526_572_501.jpg 2007 (completed): HMS Bounty - Artesania Latina  gallery_1526_579_484.jpg 2013 (completed): Viking Ship Drakkar - Amati  post-1526-0-02110200-1403452426.jpg 2014 (completed): HMS Bounty Launch - Model Shipways

post-1526-0-63099100-1404175751.jpg Current: HMS Royal William - Euromodel

Posted

Ratline application

I have decided to dye the ratlines on Pegasus rather than leave them as a contrast to the shrouds as is currently the practice on Victory.

A side effect of this is to give the impression that the line is finer than it is. which is no bad thing.

I am starting with the Mizen shrouds, and as a guard against shroud distortion I am fixing every fifth ratline and then infilling.

I am finding that doing clove hitches is not that much more time consuming than simple overhand knots, but adjusting the tension between the shrouds is not quite as easy.

IMGP2685.JPG.6470b9f10a95147a7de29d749b69c96c.JPG

 

IMGP2693.thumb.JPG.da61297ada6d8d097144670572d2b803.JPG

Topman Bob is sent up to prove the work whilst Commander John Hamilton Gore casts a critical eye over proceedings.

 

Moving onto the Mains next.......

Main shroud ratlines

Same old same old ... except there are some variances thrown in to confuse.

Steel says... that the first six ratlines from the futtock stave downwards and from the deadeye upwards are omitted from the first and last shrouds.

Lees says .. after 1773 the first six ratlines and upper six ratlines started from the second shroud forward and finished at the second shroud from aft: the remainder covered all the shrouds.

Presumably Steel was the source of his declaration, but where the precise date of 1773 comes from is not clear.

The kit plan shows the ratlines carried across to the foremost shroud, but only every fifth line carried to the aftermost shroud (swifter)

I have decided to follow the Steel arrangement, which is my default position in the absence of any more compelling evidence.

 

IMGP2711.JPG.a162c839ff51058c7e6f057a93899925.JPG

Having rattled down the shrouds I noticed a little pulling in of the outer shrouds which was addressed by slackening off the hitches on the outer forward shroud, stiffening up the line with diluted pva and re-applying the hitch. This was then sealed and trimmed.
 

IMGP2700.thumb.JPG.f36a25c5681e7941e37dfb3558d0f10b.JPG

The intervening hitches were checked and then the same procedure was applied to the aft outer shroud to eliminate any convex curve.

DSC_0374.thumb.JPG.36ff81f53786b235317cc21dd3c1f233.JPG

IMGP2720.JPG.900de22a3daa3d16c26fefb05fa7a899.JPG

IMGP2725.thumb.JPG.79fd2d00f189e56fa3c7564f75607a1e.JPG

IMGP2729.thumb.JPG.8a530f294a8b485076cbff77af4ef7ce.JPG

With the lower rigging completed I can now turn my attention to the tops.

B.E.

 

 

 

Posted

Fitting out the mast tops

With the lower mast standing rigging completed I now need to look at the mast tops.

There are blocks to be secured  beneath the tops and the deadeye strops and futtock shrouds to be secured.

I start with the Mizen top which is the easiest because there are no lead blocks beneath the top. I am concerned here only with the Futtock plates and shrouds, and the topmast shroud deadeyes.

These are the scale requirements:

Futtock shrouds 3½" line - (0.44mm ø line)

5" deadeyes - 2mm at scale.

Mizen Futtock ratlines ¾" = 0.1mm ø line.

The kit supplied deadeyes are nominally 3mm (Closer to 4mm) and the strops over large for the Mizen.

There needs to be a differential between the lower mast and Topmast deadeyes and between the Topmasts deadeyes for the Mizen and the Fore and Main Topmast shrouds.

IMGP2717.JPG.9ec0f1f83feb16e6e573c1fc1698e79d.JPG

Here's a comparison photo of the kit provided deadeye/strop and  the more in scale version I prefer. I have used 2.5mm deadeyes and modified channel chainplates for the strops. The kit provided hooks for the futtocks are also a tad too large for the Mizen and I have used Chuck's 3mm black plastic ones, coupled with Morope 0.4mm ø line.

IMGP2758.thumb.JPG.5012ffe51b6ab2918a86a4601380cbb3.JPG

Rigging these Mizen futtocks proved a tad more tricky than I had thought.

Initially I attached the hooks to one end of the line, fitted the hook into the futtock strap and seized the other end to the futtock stave and shroud.

It proved difficult to get sufficient purchase on the futtock lines to  get them taut without pulling the Mizen Shrouds out of line, something that looks so bad on a model, and I was not at all happy with my attempt.

IMGP2760.thumb.JPG.b39368d22303d503b765601b3a7b3ac1.JPG

So, I first fitted temporary catharpins to counter the pull on the  Mizen shrouds, removed the Futtocks, and reversed the procedure.

IMGP2780.thumb.JPG.3bcf3d3c6fdb4a87d29432cd4ee2fd59.JPG

It seemed to work better attaching the lower end of the futtock to the stave and Mizen shroud first and then feeding the line thro' the eye of the hook once connected to the strap, which can then be tightened by degrees and seized.

IMGP2788.thumb.JPG.ff85f4e36c66f35669147008354ea54f.JPG

Catharpins

Steel does not list this addition for the Mizen Shrouds, and the ffm also omits them, (possibly on the grounds that they may interfere with the Gaff.)

Lees indicated their fitting on the Mizen as with the Fore and Main.

For the present I will leave them off.

B.E.

 

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...