Jump to content

GrandpaPhil

NRG Member
  • Posts

    5,996
  • Joined

  • Last visited

Everything posted by GrandpaPhil

  1. I would personally very much like to see how this kit develops. If I didn’t have so many models to build right now, I would throw my name in the hat for a tester.
  2. Ferrus, Good to see you back in the galleon arena! Looking forward to seeing this build!
  3. The good thing about paper planks is that they are easy to shape. I typically can use PVA glue, sometimes reinforced with a little CA, to keep everything in place. The tedious part is cutting the cardstock into long strips.
  4. The touchups are done: The sides are on and drying: This will look a million times better shortly, once I lay down wales and begin the second planking.
  5. Welcome!
  6. I think I’m going to try and get Admiral Claus to get me a Syren Rope Rocket and Serv O Matic for Christmas for this model.
  7. Thank you all very much! I have been having a lot of fun with this model! The poop deck is on: Once everything dries completely, I will add some trim, trim some areas that need trimmed for the rest of the hull sides, fix some areas that were over zealously trimmed, paint the interior portions of the hull sides, seal those areas and install the hull sides. Then on to installing wales, second planking, and the hull decorations that 16th century ships were so well known for.
  8. The bulkheads are finished and installed: It’ll be time to close up the rest of the hull very soon. Then to add the second planking, the wales, and the rest of the decorations. And then to paint to match the rest of the ship.
  9. The bulkheads are touched up, the backs are painted and are ready for sealing and installation: The first bit of ropework is also done!
  10. It would be functionally no different than building from the plans for a kit. You would just have to adjust thicknesses.
  11. The doors are done: And installed: Now to paint the reverse side of the bulkheads, drybrush everything, seal everything, and install the bulkheads. Then I’ll be taking pictures of the entire ship again.
  12. Welcome!
  13. The doors are painted, working on banding/hinges: Next up will be door handles, then final painting and assembly of the bulkheads. Then installation and the rest of the bulwarks/second planking.
×
×
  • Create New...