Jump to content

clearway

Members
  • Posts

    2,028
  • Joined

  • Last visited

Everything posted by clearway

  1. She is coming along now Keith (see there are spars stored midships as well😉). It only seems like 5 minutes ago we were discussing last year abuot when we start masting and rigging her! Keith
  2. thanks for looking in peeps, not much progress with Terror due to work and family commitments. However have managed to get the main yard hung (just by the chain slings at the moment) the trusses have been led through the eyes formed in the other truss if that makes sense, but will need to lead through a block from an eyebolt in the after trestletrees, then to a natural coloured thread to the pinrails via blocks. at first the sail looked way too short as i had hung it from the jackstay as opposed to under side of yard, but then thought "actually it will need to clear the midship davits so i think all is good! Take care all Keith
  3. Thanks for looking in. Back with Endurance and have planked the poop deck with the 2mm decking (actually Maple as opposed to Lime stated earlier in log). Also have drilled through the stern with a pilot hole so i can install a full rudder. The Walnut planking has been started with the planks for the stern steamed and bent (not easy and maybe planking with a softer wood would be far easier)! Take care all Keith
  4. Thanks for looking in everyone, the mainyard/ sail are nearly ready to go in place. When dry the thread on the yard trusses will be trimmed back and the chain sling around the yard will need added. Not sure if i am right here but looks like Matthew Betts long awaited book has been delayed as i have it on order, but the website has gone from in stock to pre order with an October release date! Take care all Keith
  5. Not much happening wit Endurance due to Terror, but have finished sanding the hull and the stern formers. I have some 4mm x 0.5mm walnut for the second planking and some 2mm x 0.5mm lime for the decking which equates to roughly 6" width. The hardest part will be bending the planks around the counter as per prototype (methinks the admirals steam iron will be abused again)! Take care all Keith
  6. Ty Mike and thanks for the likes and looking in as always everyone. Bar the driver boom sheets all the running rigging on the mizzen mast is tied off and coiled, also rigged the mizzen backstays (just need halliards tidied up). On the main mast i have started on the chain slings and rigged the main sail to the yard. Take care all Keith
  7. Thanks Keith- it's where the cleats to tie of the boom sheet are located which is causing doubt at the moment - also your little Terror is pretty outstanding too especially as it is your first model ship build 😉. Keith
  8. Thanks for looking in and likes everyone. Continuing with the mizzen mast and the boom topping lifts have been fitted , most of the rigging has been belayed now but not the boom sheet blocks as not sure where they led too (need Mr Betts book)! Also work continues on the main yard with the jack stays fitted and main sail hem stitched. Take care all, work is getting busier with less furlough which is good but equals less shipyard time ! Keith
  9. thanks for looking in everyone, sneaking jobs in on Endurance while waiting for glue to dry on Terror yards. Have fitted the formers for the stern , watch out these are handed but if you concentrate on the instructions there will be no issues. Before i add 2nd planking i will need to decide if i am going to add extra planking near stern to make it a bit fuller or just go with it as is? also i have pulled the brass pins ready for sanding down, also need to add a stealer below the lower most former. take care all Keith
  10. True Keith if they can be removed no harm done. I ordered my copy from Waterstones who are a u.k. based bookstore (they also have a website you can order off) , though it might be assumption on their part on the ten days! Keith
  11. while i am still working on my HMS Terror i could not resist buying/ starting this one. Have had an interest in Endurance since first reading about Shackletons exploits and seeing the footage of the ships destruction in the pack ice. There is an excellent review of the kit on this forum and as it mentions some upgrading will be needed to make it more accurate. so far have got her as far as the first planking stage (i planked from the midship ply former down tapering planks right from the start at the bow then planked upwards) . I must admit what a joy planking this hull after occres Terror! i also did not plank the decks yet as opposed to instructions , i will drill and dowel the decks formers in place and sand down before decking is added for extra strength in the hull. Keith
  12. thanks for looking in everyone, now have the gaff topsail fitted (though not belayed off yet) and have started on the main yards. Take care all. Keith
  13. i would leave final verdict on fitting trysails till Matthews book comes out (hopefully should be getting a message about mine within next 10 days or so), If you look on twitter he has put a couple of teasing shots on his tweets , one being a video of the fully detailed outboard profile drawing though still wont help you with the trysail quandry. Keith
  14. Thanks for looking in, we have our first sail and some running rigging (though not belayed yet). Still not sure about whether i like her with the occre sails or should i have gone bare yards🤔. Take care everyone. Keith
  15. As an aside the national maritime museum greenwich has various plans of endurance (as polaris) and i have just ordered the one showing rig and deck structure/ fittings for when i step up a gear with my build after finishing hms terror, did set me back £51 with the P&P though! Keith
  16. it will indeed Keith, and the ice bridge can be added after the mizzen is rigged (after rigging the parrels on the driver boom i am definitely leaving the skid beams etc till after the rigging is done)! Keith
  17. Hi Keith- you dilute the india ink in an old container (if it is good quality ink like Windsor & Newton go 5 parts water to 1 part ink- otherwise maybe 60/40). I unravel the thread off the spool and tamp it down into the ink/water mix, now the fun part- i take it outside and run the thread out of the tub and around one pole to the next on the washing line to dry- it's stopping the thread knotting that is the good part, also recommend gloves- its like being back in school😀. (hope that all made sense) Keith
  18. Thanks for looking in folks, work continues on the foremast / bowsprit with the forestays rigged and the t'gallant stays though not lashed in properly yet... using thimbles and eyes to lash them to the hull. On the mizzen mast have fastened the driver boom in place (the parrell beads are actually cross stitch beads) holes were drilled into the jaws and stop knots used to secure them. take care all Keith
  19. divide the length of the other frames by 17 and that will give you the width of planks at that point- If you are going to add 2nd planking layer don't get too technical with first planking- just make sure it follows the hull form so the 2nd layer has a good base. Keith
  20. coming along nicely- i have actually started this kit myself, but will build and finish it in a similar style as my ongoing HMS Terror with walnut 2nd planking and varnished wood finish along with upgrading of some fittings (steering jumps straight out at me). Keith
  21. work continues on the bowsprit with the lashing and bobstays now rigged , used chain as plans show shackles on the prow (rope bobstays would have been spliced through holes). Also rigged first of the forestays using a piece of bent brass as a spacer. Take care everyone and thanks for likes and comments. Keith
×
×
  • Create New...