Jump to content

DaveRow

Members
  • Posts

    661
  • Joined

  • Last visited

Posts posted by DaveRow

  1. Shipyard Closing Down

    Well for a time being to refurbish the Entertainment Room for the Display Case to reside.

    And to explain, the Admiral, as my next project wants me to repaint a room and refurnish appropriately with a side bench_table for the display case to reside on.

     

    A few pictures of the Endeavour taking centre spot in the display case. Queensland Western Red Cedar Base with a Acrylic Case over.

    DisplayCase_002.thumb.jpg.37ddb3d18b5337ba8e1f31df2373d592.jpg

    DisplayCase_005.thumb.jpg.655aedfa9513e1ce40933c0c736684a4.jpg

     

     

    DisplayCase_008.thumb.jpg.d94e2627e0c0d3c8d39b0d5f56e64dfb.jpg

     

    DisplayCase_011.thumb.jpg.ff19b26f7caf9b3bcecee4b101bd0782.jpg

    I learnt so, so much over the 5 year period constructing the H.M.B. Endeavour.

    I must say thanks to all those who followed the build, those who I/we shared information, and the general encouragement during the period. It would be a lonely life constructing a model without this fantastic Web Site "The NRG Model Ship World" and the members on it.

    To those other fellas currently constructing the H.M.B. Endeavour, good luck with the rest of build. Enjoy the final home run as I did.

     

    That's all Folks....

  2. 9 hours ago, bartley said:

    Dave,

     

    I live in Brisbane as well and am interested in who you bought your molded acrylic from.  A very nice build incidentally.

     

    John

    Hi John,

    Industrial Plastics Pty Ltd

    They were over at Murarrie, however moved end of January to new location.

    May of kept their phone no.  1300 465 888 

    projects@industrialplastics.com.au

    I emailed them for new location as well.

     

  3. Shipyard Update

    Flags and Felt on the cradle frames

     

    Added Flags to the boat over the last couple of days.

    Put halyards on each.

     

    Bowsprit: Union Jack
    Flags_001.thumb.jpg.21034b3ee55fd76326e2d35013582f83.jpg

     

    Flags_002.thumb.jpg.b7bac3b639c812c65861b27eb147cd6c.jpg

     

    Stern: Red Ensign.

    Flags_003.thumb.jpg.6b73841c525e2efdd22c82e51728505c.jpg

     

    Flags_004.thumb.jpg.f36593621839b838fd14e47e8b0b6ecc.jpg

     

    On Main Top-Gallant Mast:  Tri-Colour Pennant

    Flags_005.thumb.jpg.83555e25f1a77d456cd20cca991a7918.jpg


    Felt added to the cradle frames:

    I am keeping the 2 x black cradle frames to mount on the Display Case Base.

    Still to trim the felt then screw these two frames into the keel. You can just see the screw in the middle of the stern frame.

    CradleFrame_felt.thumb.jpg.09d3542fddd1bbcb08f1f479c3602bc7.jpg

     

    So close to finishing this build, I can feel the calm and solitude when she's done.

    Soon to be replaced with "what next".

     

     

     

     

     

     

  4. Shipyard Update

    Stern Figurines, Counter and Window Decorations.

     

    I have been procrastinating about how to do these for months(probably years).

    But the time came to make a decision, as my kit did not have these items included.

    After an attempt to engrave a figurine(failed) I bashed 2 cast figurines I had bought a couple of years ago(basically cut the legs off)

    I hand crafted from Pear Wood the Counter decorations under the figurines, and the Window Mullion Deco's.

    Many hours to decide on the overall shape and cut the patterns in.

    As an amateur at carving, fairly happy with the outcome. 

    So how did they end up.

     

    1857002374_SternCounterDeco_001.thumb.jpg.94a593a539a31ae4f1a547622644e686.jpg

    Counter decorations for under the figurines, ready for fitting.

     

    1560092053_SternCounterDeco_002.thumb.jpg.88aa080ae82f5d6753b2daf7c856211f.jpg

     

    1335210037_SternCounterDeco_005.thumb.jpg.e05d318efd2f6d9a38038d5fdcbdf965.jpg

    Starboard Figurine

     

    1233012403_SternCounterDeco_003.thumb.jpg.6ec4760a97479397c1c32db59e4aa006.jpg

     

    2026751545_SternCounterDeco_004.thumb.jpg.5eb5842a6ded09755e28f32d1c0fc493.jpg

    Port Figurine
     

    1381591725_SternWindowMullionDeco_001.thumb.jpg.c6b6030785d4161948a531016eff8dbf.jpg

    Window Mullion decorations (4 off)

     

    Note: I do realise the Figurines are short in height and not ideal.

    The height restriction came about by the Taffarel being turned down either side(P&S) too far ?, thus shortening the height(length) for the Figurines to fit into. Now looking at it, I could of cut into the rail and raised the Figurines up. All a bit too late I'm afraid, as the shipyard is closing down on this build very soon.

     

    Not much to go now to finish off what started in April 2014 as a Birthday Present.

     

     

     

  5. Back in the Shipyard

    Had a really nice trip to the USA. NYC, Washington, New Orleans and Aloha Island - Hawaii.

    So back to finish of this build.

    Added the Rudder Pendants according to James Lees “The Masting and Rigging of English Ships of War”

    Section on Rudder Pendants

    "Chains were shackled to eyes in the rudder, coming up each side of the rudder to under the transom. To the end of the chains large rings were fitted and into these rings were hooked the rudder pendants. These Pendants had a thimble in each end with the hooks set round the thimbles. The hooks were moused. The pendants were seized to eyes or hooks set under the transom – one by the side of the rudder post, one half way along, and one under the quarter gallery. The end of the pendants were seized to the aft end of the Mizzen channels."

    So below are a few pictures of the pendants attached to the stern.

    I wasn't sure if I should use a "Ships of War" detail on the Endeavour. But it all makes sense to have a means to secure and retrieve if the Rudder went adrift from the Gudgeon.

     

    RuderPendants_002.thumb.jpg.c066a57c749cdcfb7531357def19703d.jpg

    I know the replica has a chain/rope from either side of the rudder, going up onto the transom top rail. This configuration I believe  looks more realistic.

    RuderPendants_004.thumb.jpg.3bc547c514289d77afc65d607aeb8bd8.jpgRuderPendants_005.thumb.jpg.3ae7fbc54bc9e59fc7f2b9f0e5079b32.jpg

    I attached the end hook to the mizzen channel anchor point, assuming it was a solid point to take the load "if the rudder went astray"

    The chain with "that big ring"

     

    RuderPendants_003.jpg

    Another pic, the pendant running down the port side.

    RudderPendants_001.jpg

    Little prep shot laying out the pendant before attaching to the stern.

     

    One of the last things is do, is create the stern quarter figures. My kit didn't come with such figures, so scratch build. 

     

     

  6. Will be on shore leave in a few days.

    The Admiral and I are off to the Big Apple to watch some of the St Patrick's Day March on 16th March. Apparently it goes for 6hrs and we're not standing for that long in the 0 deg, but sure will be spectacular to watch.

    Afterwards, heading south(to warm up) via Washington, New Orleans, over the pacific via Hawaii too, what become famous through the lyrics from the band "Men At Work" The Land Down Under.

     

     

  7. In the Shipyard

    Back onto the boat itself.

    Completed adding the Brails to the Gaff off the Mizzen. AoTS page 106 and 115 for ref.

    496241345_GaffBrails_6859.thumb.JPG.358df95fc6d28ad234f44dd836576a66.JPG

    The ropes added were:

    Fancy Lines Port & Starboard(P&S)

    Throat Brails P&S

    Middle Brails P&S

    Peak Brails P&S

    A short rope(splitter) to the end of the Fancy line.

    811105102_GaffBrails_6857.thumb.JPG.4e0157e748e4c8675c976a9dd2acec04.JPG

    Above: All the ends Brail ends pulled up to their respective 3mm blocks.

    1017645203_GaffBrails_6843_crop.png.5832cec2da246d7359c14e402ed6623b.png

    The Fancy line connects to the Middle & Throat Brails.

    This is achieved via a short line(with a block each end) > arrow pointing to the rope, which splits the Fancy line in 2, with each end block for the respective Middle and Throat Brails. What mouth full, and I hope a reader understand how it all works, as it took me a while to work it all out. 

    1310489955_GaffBrails_6844.thumb.JPG.3780233bbde3eca462e0fdb17e281e87.JPG   214903683_GaffBrails_6858.thumb.JPG.96c01c412e558fe6580a9f4db6601773.JPG

    The Middle Brail comes down through a block seized on the back Mizzen shroud, and run down to cleat on the shroud.

     

    493103669_GaffBrails_6856.thumb.JPG.3dabeafce331b212a3535ea81e5be2ee.JPG

    The Peak Brail I ran down through a block and tied off on rail.

    1734958659_GaffBrails_6846.thumb.JPG.619213640935bab35b97ac3478f3ad15.JPG

    The Fancy lines(P&S) run up through the end of the Gaff and down to tie off on stern cleats.

     

    Another item ticked off.

     

  8. Back in the Shipyard

     

    Not much has ben happening of late on the actual Boat.

    I finally sourced more small link chain today to finish off the Anchors on either side of the Bow.

     

    However the Display Case is taking shape.

    A good mate of mine(you need a good mate like this) started on the base for the Display Case.

    Below are some pictures of the base under construction.

     

    Display_003.thumb.JPG.4bb9032bb5cbac7535ceb4ec9de623ab.JPG

    Above: The base is made of several pieces of timbers.

    The large middle piece is 1 solid piece of 32mm thick, raised up 3mm to an outer rectangular piece to make up the inner width of the case.

    A 20mm deep "slot" has been routed on the outer edge for the case to sit over.

    Below the case is in the slot.

    Display_002.thumb.JPG.700c55e1f9598d0177cbccac9ed960c3.JPG

    Above: An outer stepped section(2 pieces glued together) will be glued in the position shown around the base, to cover the slot, base and bottom of the Acrylic Case.

    But not before the next step below is done.

    Display_004_bolt.thumb.JPG.c090c952af68d8ca1345aa04c886f690.JPG

    Above: We wanted the Case to be held in position to stop it being lifted up.

    The above sketch shows 1 of 4 bolts which run in a tapped epoxy plug, for the bolt to turn in.

    Each is accessible from underneath the base in a slot cut into the side of the main block of timber.

    When all assembled, no-one will be the wiser to all the work that went into the base(by my good mate Rhys)

    Smick eh!

     

     

  9. Shipyard Update:

    The days then weeks seem to go by without knowing these past 12 days.

    The shipyard has spent many hours tidying up the halyards, sheets, many other rope ends on the deck and shrouds. I can now see the sides of the hull again, party time eh !!.

    The Anchors are taking their place on the P&S Bows.

    1629212374_PortAnchors.thumb.jpg.4536c954a9fd0b2beab64154be5a1d66.jpg

     

    Below a closer view of the Port Anchors(Sheet and Kedge).

    I have the Sheet Anchor tied up in place with chain.

    The Kedge Anchor:

    - tied to the Fore Port Channel.

    - I need to source more chain for the smaller Kedge Anchor, to wrap around the shank, Arm end and tie off to the bollards.

    - The Port Anchor Buoy is attached to the front Fore Shroud, with buoy-rope below coiled and attached the Sheet Anchor.

    The Starboard of Bow(not shown here) has a Sheet(hanging down) and Stream Anchor up on the Channel. Working on that side now

    1739597893_PortAnchors_001.thumb.jpg.19d0f901e0697db9a5959b1422ba6392.jpg

    Below the Port Main and Mizzen Shrouds, Channel and deck area.

    All the current ropes, ends coiled all tied in place.

    1965890185_PortMainChannelsFinished.thumb.jpg.57e6b0506b80b00e16a305b9d360476b.jpg

    Much more to go, but getting there.

     

    P.S. I took delivery of the Display Case(top cover), Acrylic Box 900L x 350W x 750H. Still wrapped up in bubble wrap. Another job to get the base made.

     

     

     

  10. Shipyard Update

    Bow area: Bollards & Cleats for tying off.

    For a while I've not been happy with the number of rope ends, requiring tie points, just not enough.

     

    The NMM Endeavour Replica has this area on the Bow - Pic below, where 2 bollards and belay pins are located.

    I missed this on the early stages of the build, but makes sense for the multitude of ropes coming back from the bowsprit and yards, never ending.

    The AoTS does not indicate(that I have seen) any bollard or cleats in this "zone", but sure would come in handy.

    DSC_0111.JPG.32992e1248e89fa6aa1a78c01ae42f5b.JPG

    Bit late in the build to be adding in 2 bollards and belay pins, both sides of Bowsprit. Busy little area now and very tight.

    So I decided I could at least add 2 additional Bollards(below) to slip in behind bow and beside the Bowsprit.

    Bollard_6660.thumb.JPG.a384fcd13b6b6ef6a2044356689b0630.JPG

    Extra Starboard Bollard(not painted yet) - clamp holding whilst glue drying.

    Another added to the Port side as well.

    Bollard_6661.thumb.JPG.34da699448344b86ace8532cb4a0a1c2.JPG

    Next, all going well to add the Anchors to the Bow area.

     

     

×
×
  • Create New...