Jump to content

NavyShooter

Members
  • Posts

    435
  • Joined

  • Last visited

Posts posted by NavyShooter

  1. As I wait for the hangar modules to print, I'm getting in some 3D design time. 


    I was originally going to have a folding articulated accommodation ladder, but realize that this will exceed the limits of what I can do with my FDM printer, so I went back to basics, got some dimensions, and produced a swappable folded, or setup accommodation ladder.

     

    When the Elevators are done printing, and the anchor module, I'll be able to kick a couple of these out to test them out.

     

     

    Accommodation Ladder Design.JPG

  2. As I await the printer before I do anything further with the flight deck, I decided to have a look at the anchor system.

     

    Here's the 'anchor module' that I've designed.

     

    This will be about a 9 hour print.  You can see at the top the 'ears' which will hold a 3mm brass rod that'll act as a spool for the chain to run across.  Below that is the winch deck, and below that at the bottom is the cable well, and there's a solid 'bar' in the cable well to tie the end of the anchor cable around so that it isn't lost by running out all the way. 

     

    We'll see how version 1 works...

    Anchor Module.JPG

  3. Some careful measuring, scribing, and cutting this afternoon, and I've got the hangar deck cut-out done, and the hangar deck insert fits almost perfectly. 


    That said, I realized that the design I made originally was factored around the 6mm thick wooden flight deck, so the top of each of the elevators actually projects 6mm up above the white 'pad' around it.  That is....less than desirable.  It means that I have to either do cut-outs around the elevators, or, re-print the elevator modules. 

     

    So.

     

    I'm about to start re-printing the forward and after elevator modules.  Again.  Version 5 now...?

    Flight Deck Cut out.jpg

    Elevator Module.jpg

  4. And here we go with the flight deck.  2mm sheet styrene.

     

    Flipped the ship up to get a rough profile, cut out with a set of tin-snips, then clamped in place and started trimming.  Got about half done - taking a break for lunch and I'll see if I can get this finished up this afternoon.  I was thinking this would take a LOT more time than it is.  

     

    Still need to sand it, but I'm generally pleased with how it's cutting.  A sharp/new blade is making quick work of things!

    FlightDeckTracing.thumb.jpg.def9d4d4b10960f8966cd59cddca244d.jpgFlightdeckprofile.thumb.jpg.e590380fb6ed8657aeba1a6e0ec6fc3c.jpgFlightDeckCutout.thumb.jpg.79638ef2147b1c9a2ea9b0571cb33076.jpgFlightDeckroughcutcomplete.thumb.jpg.c60933ba0a50def9b197a7b2cdf34e61.jpgFlightDeckasharpknife.thumb.jpg.3f95e0b75a9f78282c01e4c0c3953fab.jpgFlightDeckoverhangtobecut.thumb.jpg.33b6c78a255d6009ea73d47f9a785a19.jpgFlightdecktrimming.thumb.jpg.0d912e8a77aeb1b94bf1824ac917dd55.jpgFlightdecktrimming2.thumb.jpg.a7d28af793dfa29f4fe664c231f78907.jpg

  5. 21 hours ago, Sailor1234567890 said:

    Will she be in the gardens this summer? I'll stop by and check her out once she's afloat on display. 

    That is the plan!  Follow the MSMG on the F-Book place and you'll get updates on when we plan to launch her!

     

    In other news, I've been testing my LED flashing light circuit, and based on my test results, a standard 9V battery lasts about 4 days of continuous flashing.  I tried with a NiMH battery pack, gave it a full charge, then hooked it up to a solar panel circuit and it lasted about a week - so...I'm guessing that the flashing light circuit (which was designed for Model Railroad use) makes use of a lot more power than I thought it would.  Which is odd for a simple circuit with just one LED light.

     

    So.  Does anyone have any suggestions for a long lasting flashing light LED circuit setup I could use?  A cheap LED flasher from amazon or something that I could simply add extra batteries to?

     

    I could buy a 20 pack of 9V batteries from Costco and rig them up in parallel, letting them run for about a month and a half...but that seems...inefficient. 

  6. I brought the model into the Guild meeting this morning, and we had some good discussion about the ship.  

     

    Here's the ballast and leak test from this afternoon.  I was concerned about the model going in the lake and going from being warm to being cold (lake is only recently un-frozen) and potentially having cracks in some of the layers - and then I realized that after driving home with her in the bed of the truck that, well, she was already cold...so...off to the lake with some steel plates, and in she went.

     

    20 minutes or so in the lake, some bouncing up and down to test her out, and she seems to hold up well.

     

    Most important bit is that there was no water ingress - looks like things are well sealed.

     

    Next step will be the 'unofficial' test launch in the near future where I'll put her in the lake here for a couple of weeks to test the ship in a longer term float before we put her into the Public Gardens pond.  

     

    I will note, I'm updating this site more often than the Guild's official f-book page, so you guys are getting the news before the rest of the world!

     

    Ballast Test 1.jpg

    Ballast Test 2.jpg

    Ballast Test 3.jpg

  7. @Ian_Grant that's something I was told about - and is something we will look at in the fall when she comes out of the pond. 

     

    The guy who was actually supposed to do the build will be back by then, and he'll be taking her home through the winter to affect any repairs and refitting required.   (He's an actual fan of the Titanic - I'm not - I just inherited the work when he went away for a year on a contract.)

     

    I am fairly certain that he's going to want to add extra details, correct some colour selections I made, and that sort of thing.  He's welcome to do that, and I'll suggest that he add that layer of UV coating on top.  We'll see how the ship lasts this summer.

     

  8. I was asked elsewhere about costs and time...well, you can see the timeline for this build in this thread.  Basically just over 4 months from start to finish.  Here's the blurb about costs that I shared elsewhere:

     

    The plastic for printing was $470 - ish.  

    The lead shot for ballast was $60

    The fiberglass resin for sealing was $120 

    The paint was $150 (several cans of spray plus several pots of various colours of other paint)

    The epoxy outer layer was $200 - West Systems Epoxy is NOT cheap.

    The Stainless Steel Hardware (bolts/nuts/washers) was about $50.

    The Aluminum strengthening strips were about $60 (inner and outer)

    The Aluminum masts were about $10.

    The Line for the rigging was $25

    That all adds up to about $1150 or so, give or take a bit. 

     

    I bought the printer (used) specifically for this job (and the St Thomas model I did as a test print.)  then sold the printer again, so using it for 3 months cost me about $150.  

     

    Print time was about 6 weeks.  Some modules took 50+ hours to print, there were 18 modules in the hull, and 8 more for the superstructure.  The lifeboats and Davits were all individually printed too. 

  9. OK, I got the masts painted this evening (hopefully they're supposed to be black...?) and I got the last of the rigging complete.  I'll see about getting her out of the garage tomorrow if things are nice out and getting a few pictures.  

     

    All that's left is:

     - LED Flashing SOS System

     - Float Test

     - Ballast installation

     - Foam installation

     - Launch.

     

     

  10. A couple hours of work tonight, and we have everything except the LED light system and the main mast rigging complete.

     

    I 3D printed the funnel caps and glued them on. 

     

    This is hopefully the last layer of epoxy put on.  Note - I filled the lifeboats with epoxy so that they wouldn't fill with water when she's in the pond.  There were a few bubbles visible, so I took a trick I saw in a 'night shift' video and used a bit of flame to clear them away. 

     

    Basically - she's ready for launch at this point.  I need to get some outdoor photos on a nice day though I think.  

     

    Here's tonight's work:

     

     

    Funnel Caps Printed.jpg

    Funnel Cap Glued.jpg

    Hopefully last layer of epoxy.jpg

  11. I spent tonight doing the 'minimalist' rigging that I planned to do.  Put a string around the funnel band, tied lines to that, then glued the lines down to the deck.  There will be a layer of epoxy added over all of this, so the lines will STAY PUT quite nicely.

     

    The 'to do' list is now getting quite short. 

    Funnel Rigging 2.jpg

    Funnel Rigging 3.jpg

    Funnel Rigging 4.jpg

    Funnel Rigging.jpg

  12. 16 hours ago, Ian_Grant said:

    Same Ryobi drill I have - a surprisingly good tool.

     

    Look forward to seeing this ship next time we're down east.

    Hopefully you'll get to see the HMCS ST THOMAS with her out on the pond!

     

    I'll see what I add to the pond the year after that....I have been engaged by the crew/leadership on the HMCS Sackville - we'll see if I build one of those next. 

  13. OK, 

     

    Some pictures - here we go.  I got the funnels back from the Guild Member who was painting them for me on the way home from work, and I decided to get them installed tonight.  Each of them is both epoxied into place, and bolted into place with a stainless steel threaded rod.

     

    Then I lined up the Davits (YES, I KNOW THEY ARE NOT WELIN DAVITS, I DO NOT CARE AT THIS POINT) and glued them in place. 

     

    Here's my 'to do' list:

    -Glue down lifeboats
    -Seal Funnel tops 
    -Epoxy 2nd layer on superstructure 
    -rigging 
    -LED solar light SOS

     

    I'm almost ready for a test float as well.  I've been collecting some scrap steel to use as ballast. 

     

    Davits installed.jpg

    Drilling funnels.jpg

    Funnel Epoxy.jpg

    Funnels installed..jpg

    Funnels!!.jpg

  14. OK, getting down to the details - I knocked off a few things from the 'to do' list.

     

    Mast bases installed in the hull tonight (2x4 blocks epoxied in place)

    Masts installed in bases (epoxied into the wooden block)

    Upper decks of hull given first layer of epoxy sealant

    Upper deck air vents painted

    Skylights painted

     

    I have to do some touch-up on the skylights tomorrow - there was some paint bleed unfortunately. 

     

    No pictures - nothing really major to show....

×
×
  • Create New...