Jump to content
Supplies of the Ship Modeler's Handbook are running out. Get your copy NOW before they are gone! Click on photo to order. ×

Blue Ensign

NRG Member
  • Posts

    4,553
  • Joined

  • Last visited

Everything posted by Blue Ensign

  1. Post 67 Thinking about securing the yards. Everything I’ve read about cutters of this period suggests that the yards were not secured to the mast by use of parrels or truss pendents, which presents the modeller with a real problem as the yards will need to be secured if only temporarily to get the rigging in place. The kit gets around the problem by the simple expediency of having a parrel or truss on every yard and gluing and pinning the yards to the mast. I have been here before, albeit back in the 1980s with my first cutter build. 0307(2) 0304(3) A later spec cutter but even so no trusses, parrels, or pins were used in the building of this model. 0305 I wish I could remember how I approached this job, but it long preceded such things as ship modelling forums. 0303(2) The yards are however perfectly secured in position by a combination of the braces and Bowlines. Hawke model mast detail I cannot detect any sign of a truss or parrel on the Hawke model. I am starting with rigging the Spread-sail yard, but before I can even consider raising the yard the tackle blocks need to be attached, starting with the yard Tye block. 0309 This is a tricky little beggar, a 4mm single block with a served stropping formed into a ring that fits around the centre of the yard. It is by trial and error that the size of the stropping ring is determined using unserved thread to confirm the size. Two other blocks need to be attached at this stage; the Topsail sheet fall blocks, hanging below the yard just outside the slings. 0312 Raising the Spread-sail yard. 0314 I need to have this yard in place so that I can consider the practicalities of raising the Square-sail yard on a horse afore it. B.E. 09/02/2020
  2. Post 66 Preventer Stay (Part Three) – lower end attachment. For the Preventer Stay Steel indicates 9” deadeyes and 3” circ lanyards. (0.4mm ø at scale) THE PREVENTER-STAY sets up with a laniard, reeved through the holes in the dead-eye in the lower end of the stay, and another dead-eye in an iron-bound-strap, bolted on the fore part of the stem. I was surprised to see Steel referring to deadeyes for the Preventer stay in his 1794 work, as all the cutters I have seen either have hearts or thimbles. The Alert book shows hearts, and the Kit instructions a thimble and lanyard arrangement hooked onto the stem. Hawke model The Hawke model shows the stay secured to a single thimble strapped to the stem. Not least because I happen to have them, I have opted for Chuck’s closed hearts, but also hearts had been widely used for stays on ships of this period. 0297 5mm Syren Hearts, spot on. 0298 For the Lanyard I have attached some 0.4mm Morope. Can’t get them to look completely right until they are pulled taut and seized. 0299 The lanyards won’t be tied off until the Bowsprit has been fitted and the yards raised. 0296 Moving on to that tricky business of yards. B.E. 06/02/2020
  3. Thanks for the insight Frank. 👍 Hi Derek, making my own rope has never really interested me, particularly now you can get such nicely made stuff. Same with fittings, I only make things where I can't get a good quality fitting such as supplied by Chuck. Thanks Dirk. 🙂 B.E.
  4. Hawke doesn't look as clean as that Dirk 😉. I have a strong leaning towards the Morope for this particular lanyard, what size line did you use? B.E.
  5. Cheers, Rusty👍 Post 65 Main-Stay (Part Two) – lower end attachment. The Mainstay at its lower end is attached to the stem using a large five-hole deadeye. In the kit this is provided by a three- part self-assembly wooden version. 0256(2) I would suggest that a simple jig using steel pins is made to ensure hole alignment during assembly. It would have been nice to have this deadeye made in a nice wood, Box or perhaps Pearwood, but it hasn’t come up too badly with a coat of wipe-on. I was tempted to use the very nice Boxwood version produced by Chuck for the Cheerful model, but it was just a tad too large. In setting up the Mainstay, this is how Steel describes it. THE STAY Sets up with a dead-eye, turned into the lower end of the stay with a running or Flemish-eye, and with a laniard, reeved through the holes in the dead-eye, and through holes bored through the head of the stem. This looks like the arrangement shown in the Alert Book. The kit instructions show a simple seizing. The Hawke model Not particularly clear but there seems to be throat seizing atop the deadeye with the running end loosely taken around the stay and presumably seized again. The Science Museum model shows the usual deadeye stropping arrangement with a throat seizing and with the running end seized to the stay. I note that Chuck has also opted for this arrangement on his Cheerful model. I also opted for the arrangement as shown above, if nothing else the seizing is an easier job than forming an eye and seizing to the deadeye strop. Lanyards. Steel lists a 4” circ line for the deadeye lanyards which scales to 0.5mm ø line. The kit indicates a 0.25mm line which does look a little thin for this jumbo deadeye. I tried two options to check what suited my eye best. 4435 4436 Lanyards rigged with Morope 0.6mm line Morope is very fine line with great definition to show off this prominent feature of the cutter rigging. 04444 04442 Lanyards rigged with Syren 0.45mm line Syren is excellent natural fibre line but it doesn’t have quite the pure definition of the Morope but is perhaps a little more in scale. Syren. Morope, Morope, Syren, decisions, decisions, I used to be decisive but now I’m not so sure. When it comes to rigging the lanyard the kit arrangement is straightforward, but it seems a bit odd to me that the standing end is secured by a knot at the stem rather than the deadeye. I have opted for an alternative method whereby the lanyard is knotted at the deadeye in the usual way and having passed thro’ the sequence of deadeye and stem holes and will be hitched around the stay and seized to the standing end of the lanyard. At this point I thought I would test fit the Bowsprit to check that there was no fouling of the Mainstay lanyard, fortunately not, but I did have a panic moment thinking whether the Bowsprit would fit thro’ from aft given that I hadn’t checked it since fitting all the deck clutter. Part three will cover the Preventer stay attachment. B.E. 05/02/2020
  6. Post 64 Mainstay and Preventer stays (Part One) The kit uses 1mm and 0.75mm diameter line for the stays and has a simplified attachment around the masthead. The line equates to an 8” circ line for the Mainstay and 6” for the Preventer stay. This seems somewhat under-weight, even the much smaller Sherbourne has respectively 9” and 5” cables indicated. Steel indicates a 13” circ Mainstay and a 6½” circ Preventer Stay for a 200-ton cutter. This equates at scale to 1.64mm ø and 0.82mm. ø A 1.6mm ø line looked too heavy at scale to my eye, particularly when serving is added, so I opted for Syren 1.37mm line for the Mainstay and 0.88mm for the Preventer. This was dyed and left under light tension until required. 0259(2) To give a more authentic look the stays should be served around the masthead and along the stay for some six feet below the mouse, used to prevent the collar of the stays tightening around the masthead. I served the Mainstay with the kit provided 0.1mm line. Mouses Mouse - Main Stay L = 1/3 circ of stay = 3.96mm ø = 3 x ø of stay =4mm To make the Mouse for the Main Stay I used styrene tubing; a length of 3.2mm ø tubing inserted inside a length of 4mm ø tubing. This gives me the required external diameter whilst having an internal hole that fits the served stay. 0250 Testing the mouse fit on the stay collar. In reality mouses were woven onto a stay, but as model makers we mostly use a solid core covered in line. Ladies tights material is perfect for replicating the weave look particularly at smaller scales, but don’t get caught rummaging thro’ her underwear drawer. 2395 The weave treatment is applied 0266(2) A completed Mouse. 0280 Main Stay in place Mouse - Preventer Stay The Mouse is simply a smaller version of the Main Stay mouse. L =1/3 circ of stay = 2.77mm ø = 3 x ø of stay =2.64mm For this smaller mouse I used 2.3mm ø tubing inserted inside 3.2mm ø tubing. 0253 The Preventer Stay Mouse before shaping. 0291(2) Preventer stay mouse in place. 0288 I opted to place the mouses Mainstay (port), Preventer stay (Starboard) 0292 Part Two will cover the lower end attachments. B.E. 04/02/2020
  7. Needed or not, I agree they do add something to the build sitting atop the boom jaws, but that's for later, at the moment I am fully engaged in a mousing exercise.😉 B.E.
  8. At the time of the Royal Caroline the Red Ensign represented the senior squadron of the Royal Navy, so I would suggest that it is perfectly reasonable for this vessel to wear it. I doubt Cleveley was wrong. In order of seniority the Red Squadron was followed by the White Squadron and then the Blue. An Admiral of the Red was senior to an Admiral of the White, who in turn was senior to an Admiral of the Blue. ps Good choice of Ensign Spyglass 😉 B.E.
  9. The kit does provide them Dirk, albeit in etched brass form, which doesn't really appeal to me. I may well retro fit a few, and I have a cunning plan to use the bored out centres of the mast rings provided in the Cheerful kit, just the right size, but they will need to be cut and re-joined. ps; in the kit instructions Chris has commented that they need not be added to a model without sails. Regards, B.E.
  10. Post 63 Completing the masthead blocks and raising the Gaff. Standing blocks are required for the Boom topping lift and the Gaff Halyards. 0229(2) These are stropped with served line using a 4mm block for the boom topping lift and 3mm blocks for the Gaff Peak halyards. (The kit has them stropped to eyebolts in the masthead) When it comes to the how and where elements of rigging the gaff and boom tackle things get a little more confusing. Gaff 4421 Raising the Gaff. The Gaff Throat Halyard or Gaff jeer tackle, as it is referred to in the Alert book is set up with the standing block secured around the masthead, with the tackle hooked to an eyebolt atop the gaff jaws, the fall being secured at the bitts. (behind the mast) The kit instructions also show the fall secured to the bitts. Steel calls this the inner tye, but describes a completely different set up. INNER-TYE is similar to the outer tye, and hooks to an eye-bolt in the jaws of the gaff; then reeves through the lower iron-bound-block, that hooks to an eye-bolt in the aftside of the mast-head, below the rigging. It has a double-block bent to the lower end, and sets up by the haliards;, the lower block hooking to an eye-bolt on the opposite side to the other tye. The Cheerful rigging plan shows this secured to the pin rack on the Portside. I have opted to follow the Alert book /kit arrangement. 0228 Throat halyard tackle attached to the gaff. Peak Halyard The Alert book indicates that the Gaff peak halyard tackle block is secured to the Portside channel but doesn’t indicate further where the tackle fall is belayed. The kit shows the running end of the peak halyard belaying to the bitts without a tackle attached. Steel calls this the outer tye and indicates that the halyard block is hooked to an eyebolt in the deck close behind the mast. TYE, OR HALIARD, reeves through a block on the span, that clinches or splices round the middle of the gaff. The standing-part of the tye clinches round the mast-head, or hooks to an eyebolt in the mast-head: the other end reeves through a second iron-bound-block, hooked to an eyebolt in the mast-head, and at the lower end is the double-haliard-block, that does not splice as other haliards, but reeves through the strap, and makes fast with a hitch; and the remainder is expended in turns round the block and strap. The haliard-block connects by its fall to a single or double block, hooked to an eye-bolt in the deck, close behind the mast. The Cheerful rigging plan shows this without a standing end with the halyards belayed to both the Portside pin rack opposite the mast, and to a cleat on the mast. Cheerful did however post date Alert by some thirty years. I have opted to follow the Alert book arrangement with the tackle block hooked in the Portside channel the running end will be secured to a shroud cleat. This at least keeps the tackle away from the boom. 0221 Upper end of the Peak Halyards. 04424 Connecting the block to the peak halyard using a ‘false’ splice. 0219 Lower end of Peak halyards tackle hooked to the Portside channels. Boom Topping Lift The Alert book has the standing part clinched around the boom end, runs up thro’ the standing block at the masthead, with a single block seized into the fall which is positioned at a level just short of halfway down the mast. The tackle block is hooked to an eyebolt in the aft end of the starboard channel. The kit plan follows this arrangement with the running end secured to a cleat on the drift rail. Steel has a slightly more substantial arrangement: TOPPING-LIFT is taken upon the starboard-side, and reeved through the upper-block, hooked to an eye-bolt in the mast-head; then lead down and reeved through the block at the boom-end. The standing-part clinches round the mast-head, or hooks to the same eye-bolt; the leading-part comes down, and has a double-block spliced in, or turned, that connects by its fall to a single-block, and hooks to an eye-bolt in the after part of the channel, and belays to a pin in the shroud-rack. Sometimes it has the addition of a runner and sometimes rigged as the driver-boom in ships. I have opted to follow the Alert book /kit arrangement. Rigging the Topping Lift For the lift I am using Syren 0.6mm line with a 4mm single block spliced into the end. The tackle is 0.3mm line, spliced into the strop of the lift, with the tackle running thro’ a 4mm single block hooked to the starboard channel. This is slightly heavier tackle than shown on the kit plan. 0233 Topping Lift spliced around the boom end. 0234 Topping lift passing thro’ the masthead block. 0230 'Splicing' the block into the lift end. 0245 Tackle hooked to the Starboard channel. 0244(2) Run of the Topping Lift. 0232 Not in any hurry to secure these lines yet, snagging lines that have been tied off can present problems, and there are endless opportunities for this to happen. B.E. 02/02/2020
  11. Cheers Guys, and thanks Don for looking in, glad you're finding the log of use.👍 B.E.
  12. Post 62 Time to attach the shrouds Not one of my favourite jobs stropping the upper deadeyes, but it’s that point in the build. It’s a little more tricky stropping the deadeyes if the correct procedure is followed whereby the line crosses in front of the shroud with a cross seizing above the deadeye before applying two further seizings to the standing part. 0195 Fitting the cross seizing. 0200 Seizing the shroud ends. 0202(2) The seized end lies aft on the Portside and forward on the Starboard side as shown above. I note that the centre channel deadeye has twisted around, one of the benefits of macro photo’s is highlighting issues. 0204 I rig the shrouds alternatively starboard and port, setting the level with the foremost shroud. From that point onwards I set them by eye as I move along the channel. I temporarily rigged a section of the rope guard rail as an additional guide. 0207 The seizings are yet to be dyed, I find it easier with my less than good eyesight to fit them in natural thread, better contrast against the dark shrouds. I am using Morope 0.1mm line for the seizing, and Syren 0.3mm line for the lanyards. I won’t tie off the lanyards until later in the rigging process, when I will adjust the final tension. 0203 0210 0212 0215 0216 A sort of build milestone when the shrouds are rigged, but there’s still a long way to go in this build. B.E. 29/01/2020
  13. Post 61 Blocks and strops around the Masthead There are a number of blocks and strops to fit around the masthead for the yard ties, and other tackles. I held-off fitting these before stepping the mast and fitting the standing rigging so I could better assess the pendent lengths and positions relative to the yards. Atop the running backstays the pendent and strop for the Gaff jeer tackle block is fitted. 4418 A 4mm double block is stropped into the pendent. 4413 At the lower end a 4mm single block is hooked to the gaff. 4417 This now allows for the gaff and its tackle to be fitted to the model, temporarily secured at present in the lowered position. Above this are the pendents and standing blocks for the Spread-sail and Square-sail yards. I adopted the Alert book arrangement of hanging the Yard tye pendents from the mast head rather than follow the kit arrangement of having separate cleats to support the tyes at different levels down the mast. However, once again there are inconsistencies in the Alert Book Drawing H18/3 AND H22/1 show the spread-sail and Square-sail tye blocks in opposing positions. I took the view that the longer Spread-sail tye pendent went over the masthead first. 4408 Seizing the pendent around the mast head. 4416 The tyes were made from 0.3mm ø served line stropped with a single 4mm blocks. The final strop below the T’gallant mast is for the Topsail yard tye. 0180 0181 This fits between the trestletrees and is held in place by cleats on the Topmast head. 0179 The three standing tye blocks for the Topsail, Square-sail, and Spread-sail yards. 0187 0189 Now getting into a very messy stage with loose ends, there are still strops to make and the fitting of the horse to figure out. B.E. 27/01/2020
  14. Annoying but fixable, re-glue and splint either side using shaped narrow strips of limewood that can be faired along with the rest of the bulkhead. B.E.
  15. The Pearwood gratings are a big improvement Chris, and I would purchase them , had I not already replaced mine in Boxwood. I imagine the colour will come up very nicely with wipe-on poly. The Alert deck looks good on the photo with a realistic butt shift pattern, my only concern would be if a good clean finish can be obtained using limewood, it is a fairly soft wood. No doubt you will test it for taking a flat matt varnish before making a final decision. Regards, B.E.
  16. Just checking Derek, is the vertical planking on the transom correct? I've not seen that configuration before, if you visualise the real thing, the stern frames are vertical, the planking is usually horizontal. B.E.
  17. Post 60 Continuing the mast rigging. With the Standing backstay discarded I move onto making the Pendents for the Running Backstays. 4390 Seizing the pendent around the 5mm block, the stropping is also served using 0.1mm ø Morope. At least this can be done off-model. Around the masthead and for several feet the line is served. 4393 Having to seize the pendent on the model makes getting a matched pair a little more tricky, and the higher up you get the more tired your arms. 4396 For the second pendent I levelled the drop before seizing. I can now test out the standing part of the running Backstay. 0169 For this I am using Syren 0.63mm line and a 9/32nd Fiddle block also from Syren. The standing part will have a thimble and hook attached to the aft iron plate, the line passes thro’ the pendent block and has the Fiddle block seized into its end. The Irving Kingman model of Alert has an additional tackle seized thro’ the strop of the Running backstay pendent. The Kingman model was featured in an NRG article in Vol 29, 1983 pp173-184. 4399 This extra tackle is also on a pendent with a 5/32nd double block seized into the end. A tackle is then set up with a single 5/32nd block hooked to the middle iron plate. This arrangement neatly uses the three iron hull plates and I am tempted to follow his example, altho’ he acknowledges that some of the reconstruction of Alert is based on conjecture and therefore possibly not accurate. 0164 So, here’s a reproduction temporarily rigged on the portside of my Alert. The other possible arrangement, and as seen on most cutters is as on the starboard side. 0170 This would follow the arrangement used on the Cole model, the Hawke model, and in the old prints kindly provided by Dirk in the previous post. 0172 So, it’s decision time, and I think I’ve done running backstays to death. 0177 I’m opting for the double tackle option, it has more interest, and as Alert was a large cutter a bit of extra tackle is probably in order. 0166 0176 I have at this stage fitted the boom, easier to get to before the shrouds are tied off. I have also fitted temporary anchor cables; it is useful to find out how the cables lie and whether they foul any of the deck fittings. B.E. 25/01/2020
  18. Cheers Dirk, there's a distinct lack of a deadeyed standing backstay.😉 Those prints are apparently from a set of four by John Kitchingman, (1740-1781) This one has a lot of interest too, altho' launching would have been a tricky business from that location. It seem Kitchingman was a prolific artist covering a wide range of subject matters. B.E.
  19. Post 59 I wrote this mainly to help clear my own mind on the way to proceed on Alert, I have struggled to accept the validity of the standing backstay as depicted in the Alert Book. The tricky business of Cutter Backstays A word about the Alert Book. Those using the Peter Goodwin Alert book as the basis of the model, as reflected in this kit, will find there is some very confusing narrative once you proceed beyond the channel shroud rigging. In the narrative it is stated that: Contemporary evidence suggests that the Alert and Rattlesnake were modified to include a fifth pair of deadeyes either side for the standing backstay. In order to facilitate this modification the third gunport had to be moved a short distance and the channels extended. Running backstays were fitted to iron plates bolted to the ships side. In drawing H4/1 this fifth set of deadeyes is described as relating to the Main Lower standing backstay So far so good, but then……… In drawing H1 a further standing backstay is shown atop the other rigging running to the first iron plate and fitted with deadeyes. Above this a running backstay pendent is shown with tackles fixed to the two aft iron plates. When we come to the detail shot of the mast head in drawing H22/1 things change. Here ratlines run across all five lines fixed to the channel described as shrouds. Above this is a standing backstay, something not listed in Steel’s tables. And atop this a running backstay. Note: the only reference to backstays in Steel’s tables are to standing backstays to the topgallant mast which Goodwin notes in the Alert book as a Topgallant breast backstay (not necessarily standard at this time.) It has been written about cutters of this period that there were many variations in the rigging set up, so there is probably not a clear answer. When looking at the Alert there are several versions, and I have looked at them all. The versions of Alert depicted by Irving H Kingman, N. Roger Cole, Peter Goodwin, all differ in rigging arrangements but none of the cutter models ancient and modern that I have looked at, have this ‘standing backstay / deadeye’ arrangement attached to the foremost iron plate. The Roger Cole model shows a familiar style of running backstay but has small stools to take the tackle set up rather than iron plates. The Kingman model shows a double tackle arrangement to the backstay, which is similar to a model circa 1790. In this case the aftermost iron plate is unused, but the Kingman model uses it for the standing part of the tackle. This is also the rigging plan used by Lennarth Petersson in his book on rigging fore and aft craft. There are other contemporary models to look at such as the well-known model of Hawke 1777. 3303 This is very much of the era of Alert and has simply the familiar style of running backstay atop the shrouds. Given the conflicting information in the Alert book, and the absence of any other examples, on balance I think I will dispense with the standing backstay and its deadeye set up and rig a running backstay only. B.E. 23/01/2020
  20. Post 58 Fitting the shrouds The biggest serving job relates to the fore shroud where the line is served overall. I used Syren 0.88mm line served with the kit provided 0.1mm line. Once served the line was re- dipped in the dye to darken it. An afternoons’ work to prepare and serve the forward pair of shrouds Port and Starboard. With the pendents and first two pairs of shrouds fitted I am in a better position to check the room necessary for the rest of the standing rigging. I had made an estimation in the position of the rigging stop to allow for increased size of rigging due to extra lines and serving but this has proved insufficient to fit it all in. The prospect of moving the stop down the mast was a little nerve jangling but with water and gentle tapping with a hammer this was achieved without drama. 4389 The top of the stop now sits 14mm below the cheeks as compared with 4mm on the kit plan. Something to bear in mind if you intend to go off piste with the rigging, as Dirk found out and noted in a previous post. 0150 It proved less irksome than I had imagined seizing the shrouds atop the stop, but I’m thankful it is only a cutter I’m rigging. 0152 There is now sufficient space to accommodate the remaining lines. 0148(2) The last line in the set along the channel is the *lower mast standing backstay, effectively an additional shroud except the ratlines don’t cross it. * Or is it – see subsequent post. 0155 0153 0156(2) After this point the rigging gets confusing which will be the subject of my next post. B.E. 22/01/20
  21. Thanks Frankie, great painting of a cutter. I can see the mainsail pressing against the Starboard running backstay, but that is a long way aft of the aftermost shroud which Steel noted as being served. Interesting thought baggywrinkles at 1:64 scale, but I think as my Alert will be bare stick, I can dispense with the torment of reproducing those.😉 Cheers, B.E.
  22. Nice first planking job Derek, a good base for the second layer. 👍 B.E.
×
×
  • Create New...