  1. To install, each rivet shaft must be removed from the spruce tree, making sure they don’t fly away when cut off, and fitted into a hole that must be pre-drilled precisely in the right location. The plastic rivets, due to the nature of the molding process, are not very precise so thickness and shape vary. Mr. Hunt drilled the precision bolt holes directly on his model; a very difficult thing to do and I have no idea how he did that. He did a beautiful job.

     

    The problem I had with his results, was as neat and pretty as it was, they looked out of scale, i.e., the bolt heads looked too high off the surface of the bulwark, in my humble opinion. Other modelers have attempted this tedious, labor intensive endeavor using his method or other ones. They also had results that looked to me out of scale. Usually the bolt head diameter was too big as well as too high, again in my opinion. Compare the actual with the model.

    4296666.jpg

    P5.1.5-6.jpg

  2. Spar Deck Bulwarks

    One of Murphy’s Laws states: “No matter what you have to do, you have to do something else first.” In order to install the spar deck bulwarks, I must prepare the 3/32” x 3/64” basswood stock as planks. That requires the installation of bolt heads.

     

    Bulwark Bolt Heads (“Rivets”)

    The bulwarks, both the gun and spar decks, have their planking fastened with bolts but are commonly referred by many as “rivets.” However, I did not simulate the bolts on the gun deck, again citing too much work for poor viewer visibility. The spar deck is another story. They are very prominent and visible to anyone who has visited the ship.

    The bulwark “rivets” are bolt heads with a raised rounded edge washer. Due to repeated painting over the years, the thick paint build-up covered the bolt head and washer merging many of them into a single mound looking like a big rivet. I could not find a source that would give me the dimensions of the diameter of the washer and bolt head combo nor the height they raise above the surface of the bulwarks, so I took a guesstimate of 1” dia. x ½”. At scale, this reduces to 0.013” x 0.0065”. VERY TINY, but because there are so many of them, they are noticeable at least on the spar deck.

    4296666 - Close-up.jpg

  3. All 22 visible and potentially visible hanging knees with double eyebolts have been constructed, custom fitted to match their individual bulkhead contours, are now installed. Their associated deck beams and the deck beams above the gun ports openings and their associated diagonal knees will installed at a latter date. I still have a bunch of stuff that needs to be install ed on the gun deck and those beams will close off any access if they were to be installed now.

     

    Trying to get back to the practicum, I think building the spar deck bulwarks and caprail should be the next step. Well at least it will strengthen the bulkhead wall extensions so I will stop breaking them

    IMG_1478.JPG

    IMG_1479.JPG

  4. I’ve finally completed installing 154 eyebolts for the gun ports. I had to drill 7 holes per gun port using a push type hand drill: 2 sets of two for the breaching rigging, one eye bolt on either side of the gun port opening, one centered above the gun port opening. All, but the top vertical eyebolt, are orientated horizontally. The 1/16” eyebolts were pre-blackened, trimmed to size, and inserted into the drilled holes. I’ve now started to construct, position, and install the remaining hanging knees.

    IMG_1476.JPG

    IMG_1477.JPG

  5. Walker_Wheeler - Considering that the pin stays are located on the gun deck bulwarks, and will be tucked under the spar deck planking, the dark lighting in that area, and the physical size of the hardware, using two eye bolts installed one over the other, no detail of the pin will be visible to the casual observer. The viewer will be looking through openings created in the spar deck where I will be omitting planking for that purpose. 

     

    I could have done the something simpler for the double eye bolts located on the the hanging knees, but I wanted to try my hand at silver soldering to see if I could make something that looked like the real thing. I could, so I did.  If that didn't work, I was going to use a larger eye bolt so that two hooks could be attached. The layman would not know the difference.

  6. I took it as a challenge to create the double eyebolt, but it really wasn’t too difficult. Using 1/16” eyebolts, I bent the loop such that two eyebolt could lie next to each other without any overlap. These were placed into a slightly modified clothes pin used as a clamp and silver soldered together. I tried using silver solder paste but due to the small and rounded surface area, I could get the paste to stick where I wanted it or well enough. So, I resorted to using flux and a very thin sliver of silver solder from a roll. That worked great. After some filing, trimming, and blackening, I inserted the double eyebolt into the vertical knee.

    IMG_1472.JPG

    IMG_1473.JPG

    IMG_1474.JPG

  7. As it turns out, the rigging hardware are not your typical eyebolts. The side tackle of the gun hooks into a double eyebolt while the breeching tackle connects to two rings, one over the other, on the bulwarks using, such a seized loop of thick rope fits between the two rings and is held in place via a pin which drops through the top ring, through the loop of rope, and finally through the bottom ring. It appears the pin has a cap which prevents the pin from dropping all the way through.

    Gun Deck Gun Rigging Hardware.png

  8. Gun Deck Hanging Knees & Gun Rigging Eye Bolts

    The order of installing the gun deck knees, as I’ve interpreted the plans, are first the vertical hanging knees under every other spar deck brace, next the diagonal knees and remaining spar deck braces above each gun port, (Whether I’ll make those braces completely or partially I’ve yet to determine), and finally the horizontal knees between the spar deck braces. Once all of this is installed, then I can work on building the gun carriages, mounting the guns and rigging them onto the model. I think I’m scaring myself.

     

    So, to paraphrase an old saying, a journey of a thousand miles starts with taking the first step. Following the US Navy Plans for the structure of the gun deck, they indicated that the spar deck braces do not always line up with the kit’s bulkheads. Those braces determine where the vertical knees are located. Therefore, the first thing I fabricated were the braces using 1/8” thick basswood stock. To ensure I had the proper beam curvature, I used as a guide the bulkhead spar deck braces, that I cut off from the bulkheads when I made gun deck. I traced the curves onto the basswood.

     

    Each brace was dry fitted into their proper location as indicated by the US Navy plans. They will be glued into place once the gun deck is completed

    IMG_1469.JPG

    IMG_1470.JPG

  9. K - Thanks for one of many welcome backs. It does feel good to be back at my shipyard.

     

    As for relying on my progress, well let's just say I'm not known for my speed. My next big milestone is the installation of the gun deck cannons. However, in order to do that, I wanted to install all the eye-bolts the cannon rigging will require into the model first. As it turns out, some of that hardware is embedded into the knees that support the structural beams for the spar deck. In order to install those knees with the required hardware, I am now in the process of forming the all those structural beams so I can fit the knees. tight against the bulwarks and the beams. Each one is a custom fit due to inconsistencies inherit in my woodworking skills. Not only that, Those eye-bolts aren't simple eye-bolt., They are double eye-bolts, so they have to be individually made as well. It seems that no matter what I have to do, I have to do something else first. So, to reiterate, you may grow much older at the rate I'm going.

     

    Jon

  10. I just finished installing and painting the gun deck bulwarks. They didn’t come out as even as I would have liked, but by the time I add all the knees and bracings, guns, eyebolts, and furniture, these imperfections won’t be areas of interest to be noticed…I hope. Also, there still are a bunch of painting touch-ups on the waterways and inside the gun ports to be done. Right now, I think the diagonal knees and gun rigging eye bolts need to be installed next.

    IMG_1466.JPG

    IMG_1467.JPG

    IMG_1468.JPG

  11. Just a quick note to let everyone know I’m finally back from surgery and rehabilitation. I had a large herniated disc in my lower back which required immediate removal. This was done through an incision in my abdomen by a surgeon who specializes in that sort of thing. A second surgeon worked from my backside to adjust my vertebrae angles with a wedge (screwed and pinned) where my disc used to be. And then the whole thing was fused together. All told they worked on me for six hours flipping me over four times. I was knocked out for eight.

     

    After spending 3 nights in the hospital working with occupational and physical therapists learning to walk with a walker, I went straight to a rehabilitation center for two weeks for addition therapy. By the time I left I had no need for any walking or stair climbing/descending assistance…for the most part. Surprising, I had very little pain as a direct result of the surgery. Of course, the pain killers might have something to do with that, but I don’t take anything during the day. I then spent a bit of time going through all my snail-mail as well as email, paying bills, etc., reacquainting myself with friends and family and the cat, who has not left my side since I returned.

     

    I’m just getting back to the Conny and will give you an update as soon as I hit a small milestone.

  12. Thanks for the kind thoughts everyone. This will be my second, and more evasive trip to the surgeon. My first was 39 years ago and that worked great, so I have high confidence this time. JT, I know it's going to be painful due to my first surgery experience, but hopefully that pain will be the result of the incisions, etc., as opposed to my spinal defect (herniated disc) that is suppose to be corrected. I will be very happy if I'm back on my feet and on my own in 12 days like you.

     

    Jon

  13. The bulwarks continue with short unpainted pieces in between the gun ports working upward. The excess wood that protruded into the gun port spaces were filed and sanded off. The bulwarks are no completed yet, but I will be taking a break for Thanksgiving week. The following week I will out of commission beginning that Wednesday as I prepare for lower back surgery which will require the services of two surgeons performing separate specialty tasks. I’ll spare you the details but suffice to say, I’m going to be poked through the front side as well as the backside. I don’t know how long recovery will be. The doctors re-assured me they do this all the time and they are confident of a successful outcome.

    IMG_1465.JPG

  14. I purchased the Model Expo USS Constitution Paint package, so I'm using their #MS4801, "Bulwarks Dark Green." I had not used much acrylic paint  prior to the Conny build, so I can't comment as to how it compares with other brands.

     

    Other than the simple clean up, I'm not a big fan of acrylic. I find it does not spread evenly, and drys too quickly. out of the jar. Adding water is very critical - a little too much, it is too loose and it won't cover well. Too little, and the paint layer is too thick. Maybe it's because I have so little experience with it and I'm just not using it right. My sister, who is an excellent artist and paints ultra realistic, uses it all the time and get phenomenal results. I'll see her this Thanksgiving and hopefully get some pointers.

     