Jump to content

tlevine

NRG Member
  • Posts

    1,937
  • Joined

  • Last visited

Posts posted by tlevine

  1. The framing for the upper deck has started.  Hopefully it will look better than the lower deck framing.  The biggest difference between the two decks is that there are hanging knees at every beam, slowing down the process considerably.  In order to accurately mark the centerline I have wrapped a loop of thread through the ventilation spaces of the hawse pieces.  A second thread is secured to this loop and attached to the stem.

     

    post-262-0-81826000-1378672494_thumb.jpg

     

    The carlings are dry-fit (and at least one of them needs replacing ^_^) and still need their notches for the ledges cut.  The pillar has a tenon superiorly to fit into a mortise on the undersurface of the beam.  Inferiorly it is simply glued to the deck.  The large gap between the hanging knee and the frames occured because I have chosen to omit the ceiling below the deck clamps. 

     

    post-262-0-59013700-1378672495_thumb.jpgpost-262-0-34239600-1378672496_thumb.jpg

  2. Ben and Tom thanks. 

     

    I have installed the bed platforms (three aft and one fore).  These are simple structures with a higher edge medially to help prevent rolling out of bed in rough weather.  Once everything was glued in place I applied a single coat of Watco's.  As I may have mentioned before, it appears their formula may have changed because it is causing a significant yellowing of the wood.  With the Costello box it is not an unpleasant yellowing...almost an aging look.  Compare these pictures with the bare wood pictures on the preceding page.  But I am not sure it works well for the holly.  Well, I have several months to work that out.

     

    post-262-0-44052900-1378336257_thumb.jpg

     

    post-262-0-85651100-1378336258_thumb.jpg

     

    post-262-0-21818200-1378336260_thumb.jpg

  3. Thanks for your encouragement, gentlemen.  As far as interior fittings are concerned...  My perspective is that I like to see the carpentry and do not have much interest in adding things like barrels, ballast, shelves, pots and pans, microwave :D, etc. My next build will probably be a cross section which will show all of those items (except possibly the microwave).  This is also why I am only building out the port side and leaving the starboard relatively bare.

     

    Those are your hinges, Greg.  Blackened with Birchwood Casey and attached with Elmer's yellow glue after the underside had been sanded to bright brass.  I found this worked better than epoxy.

  4. Over the last few weeks I have been continuing work on the lower deck bulkheads and doors.  The fore doors are a simple affair with drilled holes for ventilation and a z-brace on the inside.  The hinges are from the photoetch sheet from Admiralty Models and the door knobs are brass pin heads.  Because the doors are very plain looking, I left two of them ajar to break up the line of wood paneling.  The aft doors are more visually interesting and so are shown closed.  These doors have a lower "floating" panel and ventilation is via louvers.  When making the doors it is important not to simply notch the top of the door for the beams but to notch the entire header where it would interfere with opening the door completely.  

     

    post-262-0-22926800-1378047457_thumb.jpg

     

    post-262-0-04981800-1378047473_thumb.jpg

     

    post-262-0-75337600-1378047487_thumb.jpg

     

    There is a lantern on both sides of the bulkhead separating the boatswain's store room (port) from the gunner's store room (starboard and not shown).  The small piece of wood between the 3rd cant frame and the lower deck hook is a piece of scrap that fell in the space.

     

    post-262-0-16299000-1378047520_thumb.jpg

     

    post-262-0-66703500-1378047504_thumb.jpg

     

    The next task was to make the upper deck hook and eking pieces.  On the lower deck, the hook was rabbetted for the run of the deck planking.  On the upper deck this is not the case.  Although not very apparent in the photos, there is a round-up on the hook to match the round-up of the beams.

     

    post-262-0-65286400-1378047530_thumb.jpg

     

     

    post-262-0-65852500-1378047441_thumb.jpg

  5. Try making your eyebolt by twisting a piece of wire around the appropriate diameter drill bit to give the correct ID.  This leaves you with a "pig tail" rather than a single piece of wire to insert into the deck.  Drill the hole in the deck slightly smaller than required and then screw the "pig tail" in to the hole after applying a little two-part epoxy.  This gives a lot more surface area for the epoxy to take hold. 

  6. There has been nothing to show for the last few weeks since I turned in my workshop and tools in for a tent and hiking boots. 

     

    post-262-0-50110400-1376260194_thumb.jpg

     

    Now I am back and have started on the structures which sit on the lower deck.  My plan is to erect the fore and aft bulkheads first and then install the upper well. 

     

    The foremost structure is a breast hook which is located between the lower and upper beams.  On the Mylar plan this is shown as a horizontal structure but on the NMM draft it is canted up 30 degrees.  This was made using a template out of 8" (scale) stock.  There are nine bolts that secure the breast hook to the frames.  Because of the angle, the bolts are all decorative.

     

    The bulkheads are made of 2" x 6" material.  I made a sheet of eleven rows of planks long enough to fabricate all of the fore bulkheads (approx. 14" long).  The location of the various bulkheads was confirmed from the plan and was identical to the plan shown in the book.  The first five beams had to be temporarily installed so that notches could be cut into the bulkheads. I have attached pictures with the beams in place and removed to show the notches.  At this point, nothing has been permanently installed.  The next steps include fabrication of the lanterns and doors.

     

    post-262-0-29318300-1376261149_thumb.jpg

     

    post-262-0-67375200-1376261150_thumb.jpg

     

    post-262-0-17000600-1376261152_thumb.jpg

     

    post-262-0-66593000-1376261153_thumb.jpg

     

    post-262-0-16423600-1376261155_thumb.jpg

     

    post-262-0-65129300-1376261156_thumb.jpg

     

     

     

     

     

  7. Mark, I have owned the duplicator for several years but because I don't need to use it very often it is always a challenge to set up.  The total set-up time, including making the pattern was about an hour.  Getting a decent pillar...another hour.  After that, at my 2:1 throw-out to keep ratio, each good pillar took another half hour.  The biggest problem for me was holding the pillar square in the chuck.  My two choices are the standard three-point lathe chuck and a Jacob's chuck.  With either one, the blank tended to be just slightly off center, resulting in incomplete cutting of the spindles on one side of the piece.  With the next batch I plan on using an oversize blank to compensate for this and then trimming down the square ends to the correct size after it has been turned.

  8. I have started making the pillars between the upper and lower decks.  The pillars in the hold were simple affairs but these have a spindle on the top and bottom.  There is a drawing of the pillar on the plans and I did my best to copy it.  On one end, the spindle has two turns and at the other end only one.  I am turning them on a Sherline lathe using a duplicator from Vanda-Lay.  http://vanda-layindustries.com/html/duplicator.html   The outline for the pillar is ground onto a single edged razor using very thin grinding discs designed for use in dental labs.  The spine of the razor was removed to allow it to fit into the duplicator holder.  The rough shape was made with the cutting tool and final shaping was done with a triangular needle file.  The top square of the pillar is 5" and the bottom square is 6".  I will remove the extra wood on top after I have a few more pillars made.  The good news is that all the pillars do not need to be made at once.  Since I am averaging one keeper to two throw-aways, that is a good thing.

     

    post-262-0-08679500-1374716155_thumb.jpg

     

    post-262-0-21709000-1374716153_thumb.jpg

     

    post-262-0-35142000-1374716154_thumb.jpg

     

    post-262-0-72712600-1374716155_thumb.jpg

     

    post-262-0-46040600-1374716156_thumb.jpg

×
×
  • Create New...