Jump to content

tlevine

NRG Member
  • Posts

    1,940
  • Joined

  • Last visited

Posts posted by tlevine

  1. Mark and Pat, thanks for looking in.

     

    The mast partner has been installed and now it is time to install the upper deck clamps.  There are four strakes and an air space between the top of the lower deck and the upper deck beams.  The first task was to measure the top of the beams on the draughts and transfer this to the Mylar.  The sheer is less pronounced fore and aft than shown on the Mylar.  This height was then marked on the inside of the hull and a strip of tape was placed to ensure a smooth run for this line and also make sure that the line is parallel to the gun port sills.  The second photo shows the model laid on its side in order to show the run of the clamp to the stemson.  The beams are 7" in height and let into the clamp 1".  Therefore I measured down 6" to find the height of the top of the clamp.  This line was marked in pencil. 

     

    post-262-0-23794700-1369346067_thumb.jpg

     

    post-262-0-60042800-1369346077_thumb.jpg

     

    post-262-0-29151800-1369346047_thumb.jpg

     

    post-262-0-16080100-1369346055_thumb.jpg

  2. A milestone has been achieved.  The lower deck structure has been finished.  I have been applying finish to the underside of the beam sets before installing them.  The gap in front of lodging knee 17 in the fourth photo occurred because the assembly is not glued in yet and it shifted.  The last photo shows it better positioned.  I will not put on any upper surface finish until after the decking is installed.  Now on to the mizzen partner.

     

    post-262-0-58853100-1368905164_thumb.jpg

     

    post-262-0-22599800-1368905163_thumb.jpg     post-262-0-89496300-1368905163_thumb.jpg

     

    post-262-0-84669400-1368905161_thumb.jpg

     

    post-262-0-33950600-1368905160_thumb.jpg

  3. Danny, thanks for the head's up.

     

    Not much has been accomplished the last week.  The spring here has been particularly cold and cloudy so now that it is a little warmer (50 degrees with a 30 mph wind!) I have been occupied in the gardens.  We finally saw the sun yesterday so I took Atalanta sailing in the lawn.

     

    post-262-0-87628800-1368488250_thumb.jpg

     

    post-262-0-68056000-1368488251_thumb.jpg

     

    post-262-0-53571700-1368488252_thumb.jpg

  4. The longboat has been completed so I can concentrate on Atalanta.  Beam 16 set has an opening for a ladder to provide access to the aft platform.  While looking at this I discovered that the bulkhead for access to the magazine was too far forward.  The ladder would either have to be 18" wide or I would have to rebuild part of the aft platform bulkheads.  It was just too big a problem to ignore so I removed everything forward of the pillar for beam 16 and rebuilt them.  Some of the walls could be reused so it was not a total disaster.  I took pictures of all of this but discovered too late that I forgot to put the card back into the camera.

     

    The result is not perfect but there is now room for a 24" ladder.

     

    post-262-0-90651300-1368278510_thumb.jpg

  5. Thanks, Joe.  The door frames are mahogany and the shelves are glass to allow the light to illuminate both sheves.  For builders who leave one side of the hull unplanked, the mirror allows you to enjoy both sides without having to move the model.  Because of the lights, I could not make them completely air tight.  So a  light dusting once every two years is necessary.

  6. Thank you, Grant and Kurt.  Chuck, I do not make individual cases for my ships.  When we built our house I incorporated display cases into the design of the living room.  This will sit along side my Swan class cutter.  As far as next projects...back to Atalanta.  That will take me at least two years if I don't rig her and sky's the limit if I do.  Just as my Victory which is waiting for me to complete her rigging above the mastheads!

    post-262-0-34641100-1368186215_thumb.jpg

  7. I have finished the remaining details and have permanently mounted the longboat on its stand.  The anchor flashing was removed and it was painted flat black.  I looked at the prototype on the NMM website and noted that the anchor cable goes through a ring, not through the anchor itself.  It is a heavy, dark left-hand twist rope.  I happened to have just the thing left over from rigging my Victory and used that instead of the kit supplied material.  The rope coils have been added and the paint touched up as necessary.

     

    This was a fun build and although I used a lot of replacement material, I think it is a great project that won't take forever to complete.

     

    post-262-0-56854800-1368122786_thumb.jpg

     

    post-262-0-46153100-1368122801_thumb.jpg

     

    post-262-0-94305700-1368122808_thumb.jpg

     

    post-262-0-08546300-1368122818_thumb.jpg

     

    post-262-0-19286500-1368122773_thumb.jpg

     

    post-262-0-61561500-1368122794_thumb.jpg

  8. I had a little fun with the oars.  I laid out all eight oars in the boat prior to shaping and found it a bit overwhelming.  I decided to go with four oars, instead.  The red looked a little boring to me so I added a white stripe for contrast and applied the same decorative medallion found on the rudder to the oar blades.

     

    post-262-0-40398700-1367684727_thumb.jpg

  9. I have finally had a little time to work on Atalanta.  Beam 15 assembly has been installed.  The hardest part of this assembly was keeping the line of ledges straight across the ship.  Slight differences are a lot harder to notice if there is a hatch, mast partner or beam arm visually breaking up the run of ledges.

     

    post-262-0-94459000-1367321848_thumb.jpg

     

    post-262-0-64258600-1367321849_thumb.jpg

  10. Thanks, Bob.

     

    I remade the seizings for the shrouds using fly tying line.  It looks much better to me now.  The starboard shrounds have the flag halyards tied off to them as well. 

     

    post-262-0-84789400-1366903587_thumb.jpg  post-262-0-68681300-1366903605_thumb.jpg

     

    The rest of the rigging was installed per the directions without any difficulty.  I painted the belaying pins tan and permanently installed the rest of the lines.

     

    post-262-0-42410400-1366903597_thumb.jpg

     

    post-262-0-70901700-1366903577_thumb.jpg  post-262-0-34342500-1366903567_thumb.jpg

     

    The mounting base is courtesy of Hobby Lobby.  I broke the bank on it (79 cents...OK, 85 cents with tax).  I sealed and stained it and then applied two coats of Watco's.  The holes for the brass wire had previously been drilled into the keel.  The rudder was removed for safe keeping.

     

    post-262-0-17001400-1366903558_thumb.jpg

     

    I am getting close to the end of this little adventure.  All that remains is making the rope coils, anchor and oars and touching up the paint.

×
×
  • Create New...