Jump to content

Gahm

NRG Member
  • Posts

    1,217
  • Joined

  • Last visited

Posts posted by Gahm

  1. Gun rigging continued . . . 11 down and 7 to go.

    A little sign of life . . . with more guns being rigged additional deck furniture could be permanently mounted: the ladders, five rail, and pump. The deck starts to get a ‘finished’ look (images 1 - 4) :).

     

    Thomas

     

    IMG_7629a.thumb.JPG.1e0937fc9b24214d24dc8a8205643299.JPG

    Image 1

     

     

    IMG_7636a.thumb.JPG.bc278f92d17538a14e4c1ba7d102a2c8.JPG

    Image 2

     

    IMG_7650a.thumb.JPG.fa6b58d3781b20238ad9909b63cf3f89.JPG

    Image 3

     

    IMG_7651a.thumb.JPG.290aaa344830bb0357a5a02a3e3c991e.JPG

    Image 4

     

     

     


     

  2. Jason, Chance, Richard, thank you for your interest and feedback! It is always highly appreciated!

    Chance, I drilled the holes through the keel when the rough framing was just finished and I still had easy access to the keel. The diameter was determined by the width of the keel.  I inserted in each hole a 2 inch long brass pipe which went through the keel and way up into a basswood filler block. The 2 counterparts to these brass pipes were mounted on my stand. Each pair of brass pipes consisting of the piece in the keel and the piece on the stand were connected via a solid brass rod which fills the inside of the brass pipes. That makes for a pretty stable connection. Whether this will be the final stand solution is still undecided. But these holes are not visible and they give me a lot of options for the final stand design :)

     

    Thomas

×
×
  • Create New...