Jump to content

Recommended Posts

Posted (edited)

Take two - Fore topmast stay block arrangement

I detailed the method I used for seizing the fore topmast stay and preventor blocking arrangement in my last post. I also indicated that I thought the seizing was a bit to chunky and that I would need to redo it. Take two turned out much better as can be seen in the photo below. When adding the eyebolt I used black tying thread this time rather than the 0.1mm natural thread. This does produce a much better end result. I also used ratline thread for the seizing to link the 4mm block to the 5mm block which again produced a much better result, maybe it is still a tad too chunky, but it is Ok.

017.thumb.JPG.d0af4daa5c019ca8a3809e2ef0773eab.JPG

Edited by glennard2523

Glenn (UK)

Posted

she is looking great Glenn

 

Posted

Topgallant Stays WIP

I have now completed the work with regards adding the main and fore topmast stays and preventors. The first photo shows the fore topmast stay secured to the hull. There is an identical blocking arrangement on the starboard side for the topmast preventor. I did describe the method I used to seize the 3 block arrangement in my last two posts. You will probably note that I did make a slight miscalculation when added the double block section to the fore topmast stay as it is a bit closer to the single block section that I had planned. That said I think it looks OK so I have no plans to redo it.

001.thumb.JPG.2136f13b87d8a81c3a7c75837005392e.JPG

With the topmast stay work completed it was time to move on to the topgallant mast stays.

 

The mizzen topgallant stay feds through a thimble on the main mast and will then be belayed to the main mast platform via a double thimble arrangement. A hook will be added to the lower thimble so it can be added to one of the platforms eyebolts.

 

The main topgallant stay feds through a thimble on the fore topmast and will then be belayed to the fore mast platform via a double thimble arrangement. A hook will be added to the lower thimble so it can be added to one of the platforms eyebolts.

 

The fore topgallant stay feds through a single block located right at the end of the bowsprit before being belayed to the bowsprit cap via a double thimble arrangement.

 

I have added all the topgallant stays and they have been run down to their retrospective belaying points. The next two photos shows how the Sphinx is now looking. You can see some of the various tweezers I have used to apply some tension to the stays. My next task will be to add the double thimbles to each of these topgallant stays

002.thumb.JPG.62f83c70ada99dfb8a951c44e7849dac.JPG

003.thumb.JPG.030c402cb73b2d41363b5514a5eb7415.JPG

The final photo shows the Sphinx on my workbench getting ready for the photo shoot.

004.thumb.JPG.c705403187a0a077a1f3f2f80aad2048.JPG Once I have completed all the work on the stays I turn my attention to all the yards and my first task will be to manufacture all the top and topgallant yards. Once that is done the actual yard rigging should not take too long to complete, famous last words!!

Glenn (UK)

Posted

Fore Topgallant Mast Stay

A length of 0.5mm black thread is used for the fore topgallant mast stay. The first step is to make a loop at one end of the thread which is place over the fore topgallant mast. Once the size of the loop as been adjusted so it is a goof fit over the fore topgallant mast the free end of the thread is fed through a 3mm single block located at the end of bowsprit, as shown in the photo below.

001.thumb.JPG.a848655a438265db24b9c0af70ad34ec.JPG 

Once the thread has been feed through the 3mm block the free end is then belayed, via a double thimble arrangement, to an eyebolt located on the end of the bowsprit cap. In the picture below I am in the process of adding the seizing a thimble to the end of the fore topgallant mast stay. The thimble is held in the quad hands as the seizing is added.

002.thumb.JPG.8d285cb066c074601e7e56ec1b85de6c.JPG

The other thimble had already been secured to the end of the bowsprit cap during the manufacture of the bowsprit. Therefore the next task was to take a length of 0.1mm natural thread and tie one end to a thimble (at the bowsprit end). I then proceeded to link the two thimbles, as can be seen in the next photo. I have found it important to set the required tension in the stay early on in this process.

003.thumb.JPG.bd6b791a8d017bd29171e99ec59858f5.JPG

After a few passes of the thread between the two thimbles the free end was tied off and the excess thread trimmed away.

004.thumb.JPG.182957807a31e3eeffa42f0aa369cca0.JPG

The final photo shows the completed stays and preventors for the fore mast, topmast and topgallant mast.

005.thumb.JPG.22fe17058ed77a59fa25b50b7cf5eb87.JPG

Completing the main and mizzen topgallant mast stays will be a bit more fiddly due to the limited access around the fore and main platforms. That said I think I should be able to complete these stays in the next day or two. Once complete my attention will then turn to the manufacture of top and topgallant yards which I should be able to complete before my wife and I leave for our trip to France at the end of the month.

Glenn (UK)

Posted

Rigging Plan Sheet 2 Completed (or so I thought!)

I was really pleased with my morning work thinking I had finally completed all the tasks shown on rigging plan sheet 2. This was proven to be incorrect when I then discovered I had made a error with the belaying of the main stay and preventor. This error will be covered later on in the this post.

 

Mizzen and Man Topgallant Stays

This morning I pressed on with completing the work for the mizzen topgallant and main topgallant mast stays. These stays are to be belayed to the main and fore platforms respectively via a double thimble arrangement with the lower thimble secured to the platform eyebolt via a hook. Therefore the first task was to add a hook to the bottom thimbles. This did not take too long to complete and both completed thimble / hook arrangements are shown in the photo below.

001.thumb.JPG.c53311d9ddf462da901cfca0dab81a39.JPG

The next task was a little bit more complicated which was to add the other thimbles to the end of the stays. The main topgallant mast stay is fed down to the foremast platform via a thimble located on the fore topmast therefore adding the thimble to the end of the main topgallant mast stay was not so bad with the aid of the quad hands.

 

The mizzen topgallant mast stay is fed down to the mainmast platform via a thimble located on the main mast therefore adding the thimble to the end of the mizzen topgallant mast stay was much more difficult as there was little thread available so I was unable to use the quad hands. In the end I decided to remove the stay from the mizzen mast so I could add the thimble without restrictions. Once the thimble had been added I was able to rerun the stay before making a new loop which was then placed over the mizzen mast.

 

The bottom thimbles were then hooked to their respective eyebolts on the platforms. Two lengths of 0.1mm natural thread were then cut (approx 25cm each). It was then a case of using these threads to link both of the stay thimbles with their respective hooked platform thimbles. It was a bit awkward due to the limited access but I took my time and without any mishaps the task was soon completed.

 

The photo below shows the rigged double thimble arrangement for main topgallant mast stay belayed to the foremast platform.

002.thumb.JPG.d13eaec9ef502739f66aee7d04c15637.JPG

The photo below shows the rigged double thimble arrangement for mizzen topgallant mast stay belayed to the mainmast platform.

003.thumb.JPG.bc33b0c42da1b0e776ba341da2a00f2e.JPG

With the work on rigging all the stays finished I took some photos showing the completed work and I have attached a couple which can be seen below. The Sphinx is really taking shape.

004.thumb.JPG.a8d9afa3b45ff1e3a10d684ae55c7a19.JPG

005.thumb.JPG.f4309378e2d036bc500b03d813a7b676.JPG

Checking The Plans

Happy that the work was complete with regards to the stays I decided to double check the rigging plans. My eyes were then drawn to a detail for the main and main preventer stay tackle, as shown in the picture below. I was not overly concerned and thought it was something I needed to add. Whilst looking at the picture I noticed there was a number 1 and 2 shown at the top and also a 1 and 2 shown at the bottom which did confuse me somewhat.

006.thumb.JPG.11e8b8649d44b985a6a9d1fdb7946f6c.JPG

I soon realised I had made an error with how I had belayed the main topmast stay and preventor. When adding the main stay and preventor I had noted the 1 and 2 on shown on the stay and preventor lines and then wrongly assumed they should be taken to belaying points 1 and 2. The picture below shows the stays and preventor with the 1 and 2 identifiers which actually relates to the numbers shown at the top of the main and main preventer stay tackle. The 1 and 2 shown at the bottom of the main and main preventer stay tackle are the belaying points.

007.thumb.JPG.bc72f57f8f2a3a76cdf7ce8845af4687.JPG

The belaying point 1 and 2 for the main and main preventer stay tackle are shown in the picture below.

008.thumb.JPG.a0cbfe80434aab1afffe683dd9d70d0a.JPG

Choosing not to use the belaying pins I wrapped the stay and preventor (minus the main and main preventer stay tackle arrangement) around the crossbeams, as shown below.

009.thumb.JPG.16c1b37e300f9f16c4cbba12714cfeba.JPG

I should be able to remove the both the stay and preventor belayed to the bitt crossbeam without too much trouble. It will then be a case of making up the required blocks and completing the rigging as per the plans.

Glenn (UK)

Posted (edited)

Main and Main Preventer Stay Tackle

As indicated in my previous post I had made an fundamental error with belaying the main topmast stay and preventor as I had missed adding the tackle arrangement. The blocking arrangement for the main and main preventer stay tackle is shown in the picture below.

006.thumb.JPG.825d5e3d647ab9caadaf8407f39699d5.JPG

Using the same techniques and methods which I have detailed in some of my previous posts I spent about an hour making the various block assemblies, as can be seen in the photo below.

001.thumb.JPG.11642202c8d33cbe4daea4521da46e37.JPG

With the blocks assembly complete I then set about removing the main topmast stay and preventor from the bitt crossbeam. This turned out to be a relatively pain free 5 minute activity. The stay and preventor lines were then seized to their respective double block assemblies. I was able to hold the blocks in the quad hands which meant adding the seizing was an easy task to complete. You can see the end result of one of the seizing's in the photo below.

002.thumb.JPG.f2ea10a050ccd40b198bda01dc43f47a.JPG

With the double blocks added to the stay and preventor the two single blocks were hooked in to place. It was then a simple matter to run the 0.5mm natural thread through the blocks before belaying the free end to a belaying pin on the bitt crossbeam. Each side took about 15 minutes to rig with most of the time spent securing the free end around the belaying pin.

 

Main Stay Tackle Pictures

003.thumb.JPG.340b928e9c9f6b2af9acbaac4c95e311.JPG

003A.thumb.JPG.938795841dc2e3ace0fce7ed1bea1f42.JPG

Main Preventer Tackle Pictures

004.thumb.JPG.7d7b83fa1ecea6794c492a41fa451fa6.JPG

004A.thumb.JPG.f395fca2c50aa89a456f2c195766137c.JPG

Over the next few days I will be turning my attention to the manufacture of 6 yards for the three top and topgallant masts. It will be nice to have a break from the rigging and hopefully I can complete the work before my luxury French river cruise next week.

 

 

 

Edited by glennard2523

Glenn (UK)

Posted

Top and Topgallant Yards - Woodworking

For the last two days I returned to the woodworking workshop to make all the top and topgallant yards, plus the staff ensign. Apart from creating a lot of sawdust as each yard was turned on my Proxxon mini lathe the task was completed without any problems.  Once I had completed shaping all the yards all the cleats and ironwork were added. The yards are now ready to be painted black which will be done later today (after tea) as it is now time for my daily afternoon run. Once they have been painted black I will spend the few days seizing and adding the various blocks and foot stirrups rigging to each yard. I should be able to complete this work before my holiday next week.

 

With a brass rod inserted in each yard the completed top and topgallant yards were pinned to the yards for a photo shoot. The Sphinx looks resplendent with all the yards pinned in place.

001.thumb.JPG.186c6914a4745330c874c6ca6b9529ca.JPG

The Staff Ensign

002.thumb.JPG.a7729c77d52a55d7702ff00322a0d4cb.JPG

The Mizzen top and topgallant yards

003.thumb.JPG.a09325bd3c937c58c38f4ae5ec973932.JPG

The main top and topgallant yards

004.thumb.JPG.fa4705f8f61c5bd391a0862902ba1156.JPG

The fore top and topgallant yards

005.thumb.JPG.2fd55479472e4290ee46d53904c13e72.JPG

 

Glenn (UK)

Posted

Top and Topgallant Yard Block Manufacture

It has been a busy period over the last 2 days as I have been seizing a multitude of blocks for the various top and topgallant yards. I had to push on to complete the task before my holiday next week. I also realised I would have precious little time in the shipyard on Friday or Saturday as we are looking after three of our 4 grandsons.

 

Thankfully the ship building gods were looking down on me and allowed me to work without any major mishaps or misadventures.

 

I started with the Mizzen Top and Topgallant yards which have been painted black. There are only two 3mm single blocks required for the Mizzen Topgallant Yard. There are 11 blocks in total required for the Mizzen Top yard. As can be seen in the photo below the blocks have been seized and are ready to be secured to the yards. I am planning to secure each block to their respective yards using clove hitch knots.

483690388_001Mizzen.thumb.JPG.67952a4fbbe140db34edc896f517954b.JPG

With the Mizzen block seizing completed I moved on to seizing the various blocks for the the main top and topgallant yards. There are only two 3mm single blocks required for the Main Topgallant Yard. There are a total of 11 blocks required for the main top yard. As can be seen in the photo below the yards have been painted black and all the blocks have been seized and are ready to be secured to their respective yards. I am planning to use a clove hitch knot to secure each of the blocks to the yards.

1133227623_002Main.thumb.JPG.6226625037018393ab36c8b9e4b9f0a8.JPG

I then moved on to seizing the various blocks for the the fore top and topgallant yards. There are only two 3mm single blocks required for the Fore Topgallant Yard. There are a total of 11 blocks required for the fore top yard. As can be seen in the photo below the yards have been painted black and all the blocks have been seized and are ready to be secured to their respective yards. I am planning to use a clove hitch knot to secure each of the blocks to the yards.

2021599770_003Fore.thumb.JPG.2527c836b7bee25c1c34441be7c50269.JPG

The final picture shows all the top and topgallant yards

004.thumb.JPG.4cebfdb6312f3e3b13716e529b21b0d5.JPG

 

Glenn (UK)

Posted (edited)

Mizzen Topgallant Yard

I managed to sneak 30 mins in the shipyard this morning and completed all work on the mizzen topgallant yard. After fitting the yard fixtures and fittings I held the yard in quadhands and used a couple of clamps to shape the foot stirrup's. Once I was happy with the foot stirrup shaping I applied a coat of a diluted pva solution. Overall I think the end result passes muster.

20220827_132323.thumb.jpg.9e4721aa8e6b936183f437dbbabf344d.jpg

 

Edited by glennard2523

Glenn (UK)

Posted

Main Topyard Fixtures and Fittings

I was able to spend a couple of hours in the shipyard today and completed both the main topgallant and main top yards. I thought I would detail the method I used to add the fixtures and fittings to the main topyard.

 

With the yard held in the place using the quads hands, as shown in the photo below, the central double 4mm lift block was added, secured to the yard using a clove hitch knot.

001.thumb.JPG.751da7611c48a5a673b17f8d10ccb041.JPG

I then added some tape to mark the position of the 2 off 5mm single blocks on the yard, as can shown in the photo below

002.thumb.JPG.0b6836e54f3e21cf6018ab0bbd9037de.JPG

Using the tape as a guide the first 5mm block was added to the yard, secured using a clove hitch knot, as shown below

003.thumb.JPG.cc8e21fa690251cd96639d306c4da893.JPG

With both 5mm blocks added I repeated the taping process and added the 2 off 4mm single blocks. The work on the central part of the yard is now complete as shown in the photo below.

004.thumb.JPG.c0b18b34c5fe655cfb6106dcf84e29cc.JPG

 

Next I added the 2 off double block assemblies to each end of the yard.

005.thumb.JPG.b1daa55726884915bc71cf9497eba4fb.JPG

Before adding the two brace blocks I have found it is better to add the footrope stirrup rigging. To do this I started by wrapping a length of 0.5mm black thread around the yard, next to the one of the central cleats. I used a clamp to hold the thread in place as shown below.

006.thumb.JPG.93a19b0ab84e4314ec5e7c031e6d7184.JPG

With the thread held in place it was an easy task to add the seizing. The loop was then tighten and the excess thread trimmed.

007.thumb.JPG.67c8fd0f7f79b5c3b24b0c134ce930ae.JPG

I then added the second thread to the other central cleat using the same method. The two threads were then fed through the yard footrope stirrups as shown in the next photo

008.thumb.JPG.5323d26bfe4efad74352a5dd049fe9e9.JPG

Next I created the loops in the other end of the footrope stirrup threads. To do this one end of the yard was removed from the quad hands which then allowed me to seize the loops, as can be seen in the next photo

009.thumb.JPG.c412dd11d240ffec57f8d9b9912c0569.JPG

The loop was then placed over the end of the yard and the position of the seizing adjusted, as required. Once I was happy with how the footrope stirrup rigging was looking I then moved to to adding the two brace block assemblies to each end of the yard. I used a template to set the length of these braces, as can shown in the photo below.

010.thumb.JPG.1a70c95f6c839f5b1b0ee71c4a3dc2db.JPG

The completed main topyard is shown in the photo below

011.thumb.JPG.678b5543c45efd4b30333fb4db595d4b.JPG

 

 

Glenn (UK)

Posted

Fore Topgallant Yard

I thought I show how I shape the yard footrope's with today's post.

 

When the footrope is added to the the yard I adjust the position of the footrope seizing as necessary to get the require shape. It take a bit of trial and error to get right but is not a very long process.

 

Once I am happy with the footrope the yard is held in place using the quad hands. I then use a clamp on each of the footropes to create the required shape, as can be seen in the photo below. With the clamps in place a diluted solution of pcv glue is brushed on the footropes which are then left to dry.

002.thumb.JPG.6e0aa7b8d321d7f8e6d896147c660c37.JPG

The next picture shows more of the quads hands holding the yard in place.

001.thumb.JPG.aef6f703ddedf54fabd3305cc7f7909c.JPG

I have just one more yard to complete (Fore Topyard) which I hope to do later on today.

Glenn (UK)

Posted

Yard Work Completed

Another major milestone on this build project has now been completed as I have now finished all the work related to the manufacture of the top and topgallant yards. I am pleased I managed to complete this activity before leaving for an 8 day river cruise on the Seine tomorrow morning.

 

This means on my return back to dear "old blighty" next week I am just left with the rigging all the yards. Assuming I do not encounter any major snags I hope to be able to complete the yard rigging by the end of September. There is then just the small matter of building the 3 small boats.

 

As I bid you au revior here is a nice selection of photo's of the Sphinx as she will be left for the next 8 days.

001.thumb.JPG.2f40e37fe6b50afb6c5ab8775c24813d.JPG

002.thumb.JPG.4258e5674ab3fad48b985ecdf9352bdd.JPG

003.thumb.JPG.65ebb7ec181655eae6a1bd9da310fb6c.JPG

004.thumb.JPG.de2ec70f690741c06ddc1948017a7f6d.JPG

005.thumb.JPG.c75cb17db4aca610677acb9b539d187d.JPG

Glenn (UK)

Posted
9 minutes ago, Dave_E said:

Most excellent! I really liked the way you formed the foot ropes, that tip is in my book! 👍😀

I can't take credit for the footrope shaping method but it does work really well so I'm pleased it will help others.

Glenn (UK)

Posted

Your photos and explanations are better than ANY kit instructions or practicums I have seen! Thanks!

Tim

 

Current build: Continental Navy Frigate ALFRED (build log)                      

Past builds:     Steam Tug SEGUIN (build log in the kits 1850-1900 section)       

                         Liberty Ship SS Stephen Hopkins (Gallery & Build Log)

                         USS Basilone (DD-824) (Gallery & Build Log)

                         USS Olympia (Gallery)

                         USS Kirk (FF-1087) (Gallery & Build Log)

 

 

                        

Posted
10 hours ago, schooner said:

Your photos and explanations are better than ANY kit instructions or practicums I have seen! Thanks!

Many thanks for your kind words Tim, they are very much appreciated. I like to detail what I am doing. They might not be the best or correct methods but they seem to work for me.

Glenn (UK)

  • 2 weeks later...
Posted

Mizzen Topyard

I really enjoyed my cruise up and back down the Seine but now I am home my attention returns back to completing the Sphinx. The next task was to start securing the top and topgallant yards to their respective masts. Over the last couple of days, I have been working on the mizzen topyard which is secured to the top mast using parral beads and ribs. It was a bit fiddly to add the parral beads and rib arrangement but thankfully I was able to complete the task without any mishaps.

001.thumb.JPG.5b59ee6c6617f8a1731741faeef67715.JPG

With the topyard secured to the mizzen topmast I then looked at the tye and hilliard rigging requirement. As can be seen in the plan sheet the rigging (0.5mm natural thread) starts from the topgallant crosstrees. The thread is then passed though the central 3mm single block on the topyard. The thread is then passed through a hole in the topmast before it is belayed via a two 4mm single block configuration. One block is secured to the channel via an eyebolt the other block is seized to the end of the 0.5mm natural thread. The rigging between the two 4mm blocks is then belayed to a cleat fixed to the back of the rear starboard mizzen shroud.

002.thumb.JPG.aded02138d5a3709a0b92c741cdcb862.JPG

With the 0.5mm natural thread tied to the crosstree I was able to feed the thread through the central 3mm block, as can be seen below.

003.thumb.JPG.84325d94aa9454e0a5814bd6ec3a1da6.JPG

Once the thread had been passed through the topmast hole a 4mm single block was seized to the free end. When adding the seizing a thimble was added to the block so a length of 0.25mm natual thread could be added, as can be seen in the photo below.

004.thumb.JPG.c58e3f4adcb4e84228cff4744e326093.JPG

A second 4mm single block was seized to a short length of black thread, complete with an eyebolt. The completed arrangement was then added to the mizzen starboard side channel as shown below.

005.thumb.JPG.8ac8400a65961ec5c89c839d0342a474.JPG

The natural thread was then rigged between the two 4mm single blocks. As can be seen in the final photo below the free end is now ready to be belayed to the shroud cleat. I still need to add the cleat to the shroud line.

006.thumb.JPG.bcdad9c44cdc5d7fd6be32556d9ee1c5.JPG

 

 

 

 

 

Glenn (UK)

Posted

Following on from my earlier post I added the cleat to the mizzen shroud. I then belayed the free thread end of the mizzen topyard hilliard rigging to the newly added cleat, as can be seen in the photo below.

001.thumb.JPG.02127ce516d5c4dea1aa7bdd50e2aa02.JPG

Mizzen Topgallant Yard

The mizzen topgallant yard is to be secured to the topgallant mast using parral beads. I used a spare piece of dowel to work out how many parral beads were required. It was a fairly straightforward task to add the threaded parral beads to secure the topgallant yard to its mast.

002.thumb.JPG.8bfc805a35f02ca6faefe007695c8c38.JPG

The following picture shows the required rigging for the topgallant yard hilliard.

003.thumb.JPG.e51a1db0c72617b1d44b3b733d3e6971.JPG

The hilliard thread was secured to the yard as can be seen in the next two photos.

004.thumb.JPG.e9b5504526752c415bde700c66a7cd6b.JPG

005.thumb.JPG.3217d4b3dd030f868b32a814bd1b2a33.JPG

The hilliard thread was then fed through the hole in the topgallant mast as can be seen in the next two photos.

006.thumb.JPG.806c9ec2e0d455655e96ca002df349b3.JPG

 

007.thumb.JPG.e9d8ed8fbd472b51fcad628740f45631.JPG

The next task was to add a double 4mm block to the end of the hilliard thread, as shown below.

008.thumb.JPG.8dd88f5609c785a578f0e4dca57811f6.JPG

As was shown on the plan sheet a single 3mm block, complete with a hook, is to be added to an eyebolt on the mizzen mast platform.  The next photo shows the block arrangement, before it was fitted in place. A long length of 0.1mm thread was also seized to a thimble on the other end of this block.

009.thumb.JPG.b5051939b95b938e0705abc8767906ed.JPG

I was then able to add the hook to platform eyebolt without any problems as can be seen in the next two photos

010.thumb.JPG.048d7c9246f06160c5b96f0d6ac47cd3.JPG

 

011.thumb.JPG.eb1ed6a5d92b040add4ec1aa676d229d.JPG

The final two photos in this post shows the completed rigging between the two blocks. The free end is ready to be terminated to a belaying pin on the rack fitted near the base of the mizzen mast

012.thumb.JPG.bb7ce245f655ad423fbf690c9f79fa01.JPG

013.thumb.JPG.819b7f4248311ca44f216b63d5bdc4d6.JPG

 

 

 

Glenn (UK)

Posted

Mizzen Yard Braces

This morning I added the braces to the mizzen crossjack, top and topgallant yards. I have not belayed the free ends of these braces which I will do once I have secured the main and fore top and topgallant yards to their respective masts. As I have moved the build to a different location in the shipyard for better all-round access it is much harder to get good quality photos.

 

The first photo shows the crossjack yard braces. You may note some reverse action tweezers in the photo. I am using these to keep some tension in the various braces before I belay the free ends to the pin rack on the mizzen mast.

001.thumb.JPG.1e897983216a58ed9812c5ba81e028c3.JPG

The next photo shows the topyard braces. The free ends will be belayed to cleats located on the leading mizzen mast shroud line.

002.thumb.JPG.85590b616b2ef479de3bc42461aece70.JPG

The next photo shows the topgallant yard braces. The free ends will be belayed to cleats located on the topmast shroud.

003.thumb.JPG.5cc6324b026382a5a10e91808cd632c2.JPG

The next photo shows the mizzen mast in full. My IJN Yamato (Model Space) can be seen in the background.

004.thumb.JPG.b40fe0686c0b0fe12fa2866d4da6d264.JPG

I am now working on securing the remaining yards to the masts. The final picture shows the main topyard which has been secured to the topmast using parrel ribs and beads.

005.thumb.JPG.b9d66ebae345ffa863d1c75b6c33f8d0.JPG

Glenn (UK)

Posted

Main Topsail Yard Tye and Hilliard

The photo below shows the rigging plan for this task. Two lengths of 0.5mm natural thread are secured to the leading topmast crosstrees. These threads are then passed through the central double block located on the topsail yard. The two threads return to the topmast platform and are fed through single blocks. The two free ends are then secured to single 5mm blocks. A second set of 5mm single blocks are then secured to the main mast channel using eyebolts. 0.25mm natural thread is used to join the two blocks together.

001.thumb.JPG.04d9db128f6886f1c14c6c4e60a8c68c.JPG

I took two lengths of 0.5mm natural thread and ran them through the central double block on the yard and to the two 3mm single blocks on the upper crosstrees. This is shown on in the photo below, noting the free ends are still to be belayed so the rigging is not very taut

002.thumb.JPG.0e3009db9560f1fcfdb4d5cce0d86ba4.JPG

Close up of the central double block

003.thumb.JPG.489c34e70d488ba08335758f95e590ff.JPG

The free ends of these threads are then belayed to 5mm single blocks. I thought I would detail the method I used to seize one of the blocks. It might not be the correct method, but it is a method which I have found to be relatively easy do and does produce a passable end result (in my opinion). The picture below shows the block arrangement required and as can be seen there are two thimbles required (top and bottom).

004.thumb.JPG.8240193beb84e0d90ec3fa3e83f192b0.JPG

Starting with a length of 0.25mm black thread I create the upper thimble. A large loop is formed and is then held in place using my quad hands.  The seizing is the applied using fly tying thread. As detailed in some of my previous posts all seizing is done using a series of half hitch knots (top and bottom).

005.thumb.JPG.1c7952975b69d8abaa18749d0c2341ce.JPG

As the created loop is over sized it is then placed over a metal pin and closed up by pulling the two free thread ends. This is shown in the photo below.

006.thumb.JPG.969114261a542bcbc8419b80b7f8c474.JPG

With the top thimble created the thread is then wrapped around the 5mm single block, taking care to ensure the upper thimble is correctly positioned with the block. With the two free ends of the seizing thread held firm in the quad hands a long length of 0.25mm natural thread is added. This arrangement is shown in the next photo.

007.thumb.JPG.11a28a24015cacbc84719b38c84f3b4a.JPG

Using flying thread, the bottom thimble is formed, as can be seen in the following photo.

008.thumb.JPG.65ea969eaad146d84200b6b9d34712c6.JPG

The two free ends of the seizing thread are then pulled so the seizing can be pull up tight against the 5mm block which is shown in the next photo.009.thumb.JPG.1b1792bbfc0fc27f206dc6986ca2eed1.JPG

One of the seizing thread ends is trimmed away so that the 0.25mm natural thread can be placed alongside the remaining seizing thread. This arrangement is then held in place with the quad hands, as shown in the next photo.

010.thumb.JPG.f1218e3c5d4d357d56724a6c2336b211.JPG

To complete the process the natural thread is seized to the remaining black thread end, as shown in the photo below. I opted to use the black ratline thread for this.

011.thumb.JPG.d44084d552a7d4c1f0caf5e1eab8bb6f.JPG

I hope you found this post of some interest. The competed block is now ready to be added to the Sphinx.

012.thumb.JPG.71001eef9e0652c1ef0b2696415a5980.JPG

 

Glenn (UK)

Posted

Fore topsail and topgallant yard preparation

When securing the topsail and topgallant yards to their respective masts there is a bit of preparation work required. The yards are secured to the masts via parral beads (topgallant) and parrel beads and ribs (topsail). I determined that the topgallant yard would require 7 parral beads and the topsail yard would require 7 ribs interspersed with 6 parrel beads (top and bottom).

 

The topsail halliard, after passing through a hole in the topgallant yard, is belayed to an eyebolt located on the rear of the foremast platform via a double block arrangement. The upper block is a 4mm double and the lower block is a 3mm single complete with a hook to secure it to the platform eyebolt.

 

The topsail tyes and halliards are belayed to cleats located on the aft foremast aft shrouds via double 5mm single blocks. The lower 5mm blocks are secured to the aft of the fore channel via an eyebolt. The upper 5mm blocks are seized to the tye thread after it has passed through the 3mm blocks located on the topsail platform crosstrees.

 

It has taken me a good couple of hours of effort to prepare the various blocks and parral beads/ ribs required for the fore topsail and topgallant yards. The two pictures below show the completed parts which are now ready to be installed. I have just noticed I have only threaded 6 parral beads for the topgallant yard. Note to self I must learn to count better!

You will also note that I have added a half hitch knot to either end of the topsail parral beads / ribs arragment as I have found this makes the fitting around the mast and yard so much easier. The long tail on the 4mm double block will be removed once the halliard thread has been passed through the thimble. I have found it is useful to keep it there as it acts as a nice guide when the halliard thread is being seized.

002.thumb.JPG.c19ff7f98118b0b73600ec49acff810c.JPG

001.thumb.JPG.6d795d250fb67768cd122f614ae630c9.JPG

Glenn (UK)

Posted

Yard Tyes, Jeers and Halliards

I have now completed stage 4 of the rigging of the Sphinx now that the foremast topsail and topgallant yards have secured to the masts and the tyes and halliards have been rigged. The next stage of the rigging will be to add all the yard lifts, noting I have already added the mizzen yard lifts but they free ends have not been belayed as yet.

 

After the yard lifts have been added the final phase of the rigging will be to add the sheets, tacks and braces. I am still hoping to complete the rigging phase by the end of this month as I am very keen to start work on the Erycina and Saucy Jack.

 

The first three photos below show the current build state of the Sphinx, which I think is looking quite nice.

001.thumb.JPG.4644def4544014ae3936ef670422e6c1.JPG

002.thumb.JPG.334e4abb21d2b2fa4a7636cd9feaa275.JPG

 

003.thumb.JPG.bea68a82e5c594182971860037d6ad70.JPG

The next few photos are some close ups of the fore topsail and topgallant yard tyes and halliards.

 

004.thumb.JPG.c8b964deb343c2d41ae2e4aebde32d46.JPG

005.thumb.JPG.61c2b47fc431270dc7c3afa689bb3499.JPG

006.thumb.JPG.f85aaf859061ce5da4d29cbbc008f7d0.JPG

007.thumb.JPG.c9cfc4eff65d0c0ec8fc1c96bfbf449a.JPG

Glenn (UK)

Posted

Yard Lifts - A Slight Setback

As I set to work adding the various yard lift rigging, I did not foresee too many problems. I started out making the loops the lifts which needed to be secured to the end of the yards.

001.thumb.JPG.093d13142b2ea1bc3b4f3223c4f39256.JPG

Some yard lift rigging started by being seized around their respective masts, just above the mast cap. These were added without incident.

 

As each lift thread was added and fed through the appropriate blocks the free ends were then carefully brought down to the deck level ready for belaying. After a few hours work all the yard lifts had been rigged and were ready to be belayed.

 

I was really pleased with the how the Sphinx was looking. I expected it would take me another days effort to belay all the free ends.

002.thumb.JPG.077f9756850ffe811963be5b4a6f8b73.JPG

003.thumb.JPG.fb02698be72d0345eac4051ab1b5761c.JPG

When looking at the rigging plans I noted that all the yard lifts are belayed to cleats located on the back of the shroud lines. They only problem is that I had forgotten to add these cleats when installing the shrouds.

 

The various stay rigging which has been belayed to the various channels has meant access to the back of the shrouds is now much more difficult.

 

I now in the process of adding all the shroud cleats which is a very fiddly and very time-consuming task, but I am making slow and steady progress. I expect it will take me a few days effort before all the shroud cleats have been added which is a minor setback.

004.thumb.JPG.bfb757d816cf3ad0bc3c9474a1c3bee2.JPG

005.thumb.JPG.a33cbd5b1ef8b29a2fa5fe428c35cec4.JPG

Glenn (UK)

Posted (edited)

Shroud Cleats

In my last post I detailed that I had failed to add the shroud cleats. I thought would share the process I am now using to add them.

 

With the cleat held in the quad hands I use a simple half hitch to add a 15cm length of black thread. I am using left over ratline thread. I only add the thread to one side of the cleat at this stage. It seemed to make task of securing the cleat to the shroud much harder when I had added the seizing thread to both sides of the cleat at this stage.

001.thumb.JPG.866102993db6b65a0995bc3586569a5e.JPG

As can be seen below, showing the work in progress, I am making this a production line task.

002.thumb.JPG.9dbe8d72bd969701d5605511003ca474.JPG

When adding the cleat to the shroud I apply a bit of ca gel to the cleat and press it in place, ensuring the thread that had been attached is at the bottom. The two thread ends are brough to the front

003.thumb.JPG.49e6d68d1bb1922c4476b7ea4643c79a.JPG

I use a standard reef knot to secure the bottom thread ends and, after adding a touch of ca gel to the knot, the excess thread is cut away. I then take a 10cm length of black thread and position it around the cleat and shroud which is then secured with another standard reef knot. In the picture below I have started to add the reef knot to the top section of the cleat.

004.thumb.JPG.a1857c5d416a9929c3bd34b58c13e699.JPG

 

 

Edited by glennard2523

Glenn (UK)

Posted

Yard Lifts - Completed

Over the last couple of days all the missing shroud cleats were secured in place. With these in place I was then finally able to belay the free ends of the yard lift rigging. It was not the easiest task to complete, some free ends took no time at all to belay whilst some other free ends put up a bit of a battle. I have shown the rigging of one the lifts in the following three photos.

001.thumb.JPG.fa36b7d7f003e0b058ff2799cb5fc645.JPG

002.thumb.JPG.a6f3d8f48ea403138b027be87887cecb.JPG

003.thumb.JPG.d88a09e06d272ec1e25bfc00e39c1277.JPG

This now means that I have completed all the work shown on rigging plan sheets 1, 2 and 3 and will now move on rigging plan sheets 4, which is the last rigging sheet.

 

Sheets and Tacks - Work In Progress

Starting with the mizzen mast the rigging for the sheets and tacks has been run in and is now ready to be belayed. The belaying points for the various free ends will be on the mizzen mast shroud cleats.

 

The photo below shows the rigging fed through the larger of the double block arrangement fitted to the end of the yard. Another part of this rigging can be seen where a length of thread has been seized around the yard

004.thumb.JPG.16ebe143a3821075d0df8fae68b578fb.JPG

In the photo below a length of thread has been fed through one of the yard blocks and is ready to be belayed. I need to rerun this rigging before it is belayed so it sits behind the footrope rather than either side of it.

005.thumb.JPG.8ee6b74d87023c227b0876adebc7a9e4.JPG

The sheets and tacks for the main (and fore) mast is a bit more complicated in terms of the blocking and belaying requirements. I have noted the requirement for tack toggles which, on the real ship rigging, is a quick release mechanism. As can be seen in the picture below the rigging between the double block can be quickly released when the bar is removed.

007.thumb.JPG.bfc75920aca439f97f5b197224a55286.JPG

@chris watton did provide an excellent detailed method on how to replicate the tack toggles in his rigging plans and is a credit to his attention to detail. For example, with reference to the previous picture in this post I should have added a tack toggle between the double blocks. I opted to add the thread with a simple seized loop as can be seen in the shown in the photo below which shows the additional blocks required for the main mast. I think it will take a keen eye (once rigged) to know the toggle tacks have not been fitted on my model. Having said that I think I need a bit more space between the double blocks so after my morning tea-break I will try adding the tack toggle arrangement for the double blocks.

006.thumb.JPG.7946a5c566fca32d86ebd46be56265f1.JPG

Glenn (UK)

Posted

New Tool Alert

When rigging on all my previous build and on my current Sphinx I have always had found it troublesome to secure the free ends to the belaying pins and / or cleats. I have a great pair of small straight reverse action tweezers which has been my main tool, but they are not ideal. I also have a nice pair of right-angle tweezers (normal action). However, I find it difficult to retain hold of the thread as these tweezers are not reverse action. In the past I have looked and ordered a pair of reverse action right-angled tweezers, but they were much too big for belaying free ends.

 

Yesterday afternoon I took delivery of some small craft tweezers, reverse grip tweezers. Today, when I started to belay the mizzen sheets and tacks free ends to the shroud cleats, I used the new tweezers. I am happy to report that the belaying task suddenly became so much easier and I wish I had discovered these tools many years ago. I have added a hyperlink to these tweezers below.

 

Craft Tweezers Crossing Lock Soft Gripping Tweezers Reverse Grip

 

Glenn (UK)

Posted
1 hour ago, James H said:

I've always wanted a really long wait of tweezers with precision tip, and reverse grip too.

 

These would be for belaying, and I reckon about 8 inches long. I really do need to look for some.

The ones I have just bought are ideal for belaying in my opinion.

Glenn (UK)

Posted

Mizzen Mast Rigging Completed

After belaying the mizzen mast sheets and tacks rigging, I decided to add the mizzen yard braces. The first two photos show both the topsail and topgallant yard braces as they pass through the final blocks located on the end of the mizzen gaff.

004.thumb.JPG.c9043a388886ec019c05415edc65e741.JPG

005.thumb.JPG.39914603a255eb04736df9e26945d1a2.JPG

The crossjack yard brace threads are secured to the rear most main mast shrouds and are then fed through the yard brace blocks. The threads are then fed through blocks located on the same shroud lines. The starboard shroud line, with the brace rigging, is shown in the next photo

007.thumb.JPG.dee1792f7e39bd5c71023ab3fc367bc1.JPG

The next photo shows the crossjack brace with the thread rigged.

008.thumb.JPG.501a91ab0b0f8d609b6964dec15711d3.JPG

The crossjack braces rigging is then belayed to cleats located on the back of the main mast shroud line, as shown below.

009.thumb.JPG.c96863173ecb85f690247ed8d4990600.JPG

I have added a few photos of the completed mizzen mast rigging.

003.thumb.JPG.0357ecdfaca965ae4e4984ad58e5ec60.JPG

002.thumb.JPG.6f5f26219122ea5ad0f9f14c7da4f575.JPG

001.thumb.JPG.a079f2ddcc973052e675e078c8d456c7.JPG

Main Mast Sheets and Tacks - WIP

With the completion of the mizzen mast and yard rigging I moved on to the main mast sheets and tacks. As can be seen in the picture below the main yard rigging is quite involved. I did cover the preparation of the blocks for this task in a previous post.

010.thumb.JPG.c3c26d68b4ea009a422eb2d8ab9360e2.JPG

The next photo shows the start of the rigging with the thread (blurry) seized around the main yard. The thread can also be seen passing through the yard block also.

014.thumb.JPG.4a709d0a0d2ff01fe08bbc274dce64bd.JPG

The next photo shows the upper part this rigging.

011.thumb.JPG.15fb8c62df7071a5d107d8dd2c119bfe.JPG

Now a close up of the double block.

012.thumb.JPG.f885f950b68e1f8a448e43580bcc79a7.JPG

The thread from the center of the double block is fed through a hole in the hole and then belayed to a cleat on the inner bulwark. Not brilliant belaying but the thread is secure.

013.thumb.JPG.60d6414959ae6c2a7dfff805ca258acb.JPG

There is still a little bit more rigging to add to complete this task.

 

Glenn (UK)

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...