Jump to content

Glad Tidings by Paul Le Wol - FINISHED - Model Shipways - 1/24 - pinky schooner


Recommended Posts

I just found your build of this lovely model, Paul, and your work is stunning as usual. The AYC looks great too. It's such a wonderful wood to work with. I'll be following along. Good luck! 

Bob Garcia

"Measure once, cuss twice!"

 

Current Builds: 

Hms Brig-Sloop Flirt 1782 - Vanguard Models

Pen Duick - Artesania Latina 1:28

 

Completed: Medway Longboat 1742 - Syren Ship Model Co. 

Member of the Nautical Research Guild

 

 

 

Link to comment
Share on other sites

Paul this is coming along beautifully. I can’t wait to see how the stern works get finished up.

Ian

Link to comment
Share on other sites

Hi Everyone, thank you for the very nice comments and Likes. The jig that holds the tombstone in place underwent a revision. A strip of wood was glued on to give the bottom strakes something to rest on. A strip of wood was clamped to each side of the jig to keep the planks from rising up and a Ty-rap was used to pull them together.

 

9BA9B15D-6875-4184-A563-B08FC19169C2.thumb.jpeg.fdb837cac06f278525d09250bcd7862a.jpeg

 

1FF2CFCB-AF6A-4FB8-8D4E-42BC3929A763.thumb.jpeg.252a08478dcee519e86eb89453d5041e.jpeg

 

The planks in the next strake were cut out of a 5/16” wide strip. The plans/ directions say that a stealer would probably have been used between the two strakes but I took the easy way out and put it on top. It was cut from 1/16” sheet. This is where the clamping derby started.

 

022BCF7F-8D99-4D2A-8EA8-A362A7CAE94B.thumb.jpeg.36c855c58076a8b9689f6e7565dbffc2.jpeg

 

91668841-E143-444A-B240-AE0F2AD2C619.thumb.jpeg.1870d436ca6e06c60a10f7063f96f088.jpeg

 

764DFB23-9D3B-405F-AC45-A61720BA1293.thumb.jpeg.a84c7cdaec17a5ef54448184fb3ee85e.jpeg8C121787-2716-4F33-B623-AD9A957A01E7.thumb.jpeg.16b244448e94eb127773b2d8c68891af.jpeg

 

EBBCDF85-8372-4680-B4F7-C6A2A1B7BB71.thumb.jpeg.1d54e0b89f9703478377b37244067305.jpeg

 

0BDFF38A-ABBE-4900-981B-F729F1DFB4A0.thumb.jpeg.89481d741c19e0ccefe8cd9a0e34e584.jpeg

 

48394DF6-8E87-4324-BF09-4E0F7FB71E8C.thumb.jpeg.7e3faba01782661dada53cf844ffb630.jpeg

 

79187BBF-B77B-415A-BA54-DB0322757E78.thumb.jpeg.1695dc85152e1d62fe8c5aec7ee0d63d.jpeg

 

905DD91A-05E1-458B-AE85-FC1804886A64.thumb.jpeg.865a41c005223ed7f86b6c6b4ea4e88e.jpeg

 

807F3A0B-15F3-4789-85EB-4A25FA2C4CA1.thumb.jpeg.ee5122f5daabcb69862cadf01677ce7c.jpeg

 

The inside of the stern was framed and then I started checking the fit of the seat of ease which will be made later. 
 

D05C59AD-16DB-49F5-953C-22D0E56070DD.thumb.jpeg.46c0ecbd218c28596f0ad39bcb103e2b.jpeg

 

A few jigs were made to assist in cutting the stanchions to the proper height.

 

DE13B338-E5DB-49FF-B2B1-212050FEBDF2.thumb.jpeg.f56916e526054ad45156bdc614e3fff4.jpeg

 

E382A84C-C6CF-4F1F-969D-AA14B461578E.thumb.jpeg.60d6ddfa5c134362e219cf5399dc1436.jpeg

 

 

 

Then came lots of sanding and a coat of w-o-p.

 

0781F3AA-697A-4DB6-B1FB-FBA6C5C312E4.thumb.jpeg.b3ea6adde4bbabf1059f844fccd3d8b6.jpeg

 

A8A0FD12-E51B-45B4-A9AE-2616E9DF7AB0.thumb.jpeg.d9401512ac6c66cb13fb51cb436446d4.jpeg

 

505FCDE3-3E46-4BF8-9353-93CAFC40A605.thumb.jpeg.82112b63135f1897d6ed77af1156883e.jpeg

 

B898FB3B-EC95-495C-A586-C208FB7FC982.thumb.jpeg.a596279c5bf9b40c0ab2bcc71ef0bbc1.jpeg

 

The cap rails are going to be painted so the kit supplied rails will be used except at the bow where they don’t match. Hope to see you next time.

 

F358853D-D885-4317-B09A-3C5359C1445D.thumb.jpeg.7cf7c2b696e47f6adc16cfbad69106bf.jpeg

 

5ED71190-C9E5-4761-B3D3-68D53CE3AD61.thumb.jpeg.a9bf57be27de781f373fa72174bbd01a.jpeg

 

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

Amazing! Work like yours makes me think we need a third major category for semi-scratch built build logs.

Current build: Armed Virginia Sloop

Previous Builds: , Amati Fifie, Glad Tidings,Bluenose II, Chesapeake Bay Skipjack, Fair American, Danmark, Constitution Cross Section, Bluenose 

Link to comment
Share on other sites

Hi Dsmith, thank you very much for your kind words. I keep thinking that it would be nice if more kit makers would sell their kits in stages.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

She's looking really nice Paul! Love the deck configuration

hamilton

current builds: Corel HMS Bellona (1780); Admiralty models Echo cross-section (semi-scratch)
 
previous builds: MS Phantom (scuttled, 2017); MS Sultana (1767); Corel Brittany Sloop (scuttled, 2022); MS Kate Cory; MS Armed Virginia Sloop (in need of a refit); Corel Flattie; Mamoli Gretel; Amati Bluenose (1921) (scuttled, 2023); AL San Francisco (destroyed by land krakens [i.e., cats]); Corel Toulonnaise (1823); 
MS Glad Tidings (1937) (in need of a refit)HMS Blandford (1719) from Corel HMS GreyhoundFair Rosamund (1832) from OcCre Dos Amigos (missing in action); Amati Hannah (ship in a bottle); Mamoli America (1851)Bluenose fishing schooner (1921) (scratch); Off-Centre Sailing Skiff (scratch)
 
under the bench: MS Emma C Barry; MS USS Constitution; MS Flying Fish; Corel Berlin; a wood supplier Colonial Schooner Hannah; Victory Models H.M.S. Fly; CAF Models HMS Granado; MS USS Confederacy

Link to comment
Share on other sites

  • 2 weeks later...

Hi Everyone, thank you so much for for all of your wonderful comments and Likes. The seat of ease was completed. The base was made from seven pieces because I found it difficult to get measurements for the notches around the frames. So many angles in this area. The cover will be closed so there is no hole in the base.

 

43AF36DF-8E58-4748-8D7E-C502CA697EC0.thumb.jpeg.177c2b7a6caa9724df19c4ccb64b84a5.jpeg
 

635A697D-9EEA-4D32-9C36-10C77DB411E2.thumb.jpeg.400db54b396826200dd443099a4ee898.jpeg

 

The first set of knees that I made ended up being too short so two more were made from 1/8” x 1/8” strips. Then they were glued and pinned into place.

 

58B08400-293B-42B9-B694-ACE6E20D86BB.thumb.jpeg.8666d19c7d7b8154ae879c1a649d1302.jpeg

 

Turns out that none of the kit supplied cap rails played well with the way I installed the stanchions so new ones were cut  from 1/32” AYC sheet. The two layer method was used to make the cap rails mostly because it’s a lot easier to cut 1/32” thick pieces from the sheet with a knife. The first layer was glued to the stanchions with CA and pinned with copper wire

 

3620BB36-418F-4A90-8DD8-7BE3E13DFD53.thumb.jpeg.33f441cb7dd7efcfe5f45f35c45bcf5e.jpeg

 

C3C03251-0B18-4241-B4E4-269CF2EF3BB2.thumb.jpeg.f80c1f16319b63f642d497bdaa653f42.jpeg

 

The second layer was glued to the first layer using white pva

 

80C0F1E8-B70D-46A6-ADA4-3912B1B93CE8.thumb.jpeg.92c2322f76ec4dd5f26e80db1bfa7908.jpeg

 

DF4E3D18-9750-44EE-ABCF-6B400C2BD4AB.thumb.jpeg.a52956a2e20738bd5813fdc372abc437.jpeg

 

13182253-2DC1-4DA8-8B0C-B9FB66CCC6E2.thumb.jpeg.4e3cf8c367c4dabd8ae818c2f14064e1.jpeg

 

6A4B3D03-43D4-4E12-9F04-23D110D6B9C3.thumb.jpeg.4944d0daf570bb755658a00fecf494d3.jpeg

 

The first layer just butts together at the joints and a scarf joint is cut into the top layer.

 

B3CA1564-0711-4EF2-940E-6DEF2AF10AA7.thumb.jpeg.b262fb2a2a1820b94c07a53ab7d98b2a.jpeg

 

19E3BA7A-D478-4BAD-9B94-1FC8ABD3351B.thumb.jpeg.c19100de133f72d315e68c557a5e2a5b.jpeg
 

Then the outboard edge of the rail was sanded flush with the outer face of the bulwark strakes. A compass  was run down run down the sanded outboard edge of the rail to mark the inboard edge. The rail was then cut and sanded back to this line.

 

2B26156A-28CD-48D3-9944-EA247BF7003E.thumb.jpeg.962b164b6765df3c513edcba7e4e6f82.jpeg

 

DBDBEBCB-3720-4333-8049-B4DB01620E78.thumb.jpeg.502ec969f9d4da2014efb863eca7d549.jpeg

 

Next comes making a stand for her. Hope to see you all next time.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

Perfect job as usual. Makes me want to build this beauty.

Ian

Link to comment
Share on other sites

Wow - so nice! You're making me want to build this model again! Love the look of the natural wood tones

hamilton

current builds: Corel HMS Bellona (1780); Admiralty models Echo cross-section (semi-scratch)
 
previous builds: MS Phantom (scuttled, 2017); MS Sultana (1767); Corel Brittany Sloop (scuttled, 2022); MS Kate Cory; MS Armed Virginia Sloop (in need of a refit); Corel Flattie; Mamoli Gretel; Amati Bluenose (1921) (scuttled, 2023); AL San Francisco (destroyed by land krakens [i.e., cats]); Corel Toulonnaise (1823); 
MS Glad Tidings (1937) (in need of a refit)HMS Blandford (1719) from Corel HMS GreyhoundFair Rosamund (1832) from OcCre Dos Amigos (missing in action); Amati Hannah (ship in a bottle); Mamoli America (1851)Bluenose fishing schooner (1921) (scratch); Off-Centre Sailing Skiff (scratch)
 
under the bench: MS Emma C Barry; MS USS Constitution; MS Flying Fish; Corel Berlin; a wood supplier Colonial Schooner Hannah; Victory Models H.M.S. Fly; CAF Models HMS Granado; MS USS Confederacy

Link to comment
Share on other sites

Amazing detail,very nice ship. Someday I hope I will be able to plank like you ,very nice job.:10_1_10:

   Bob M.

Edited by Knocklouder
More info

Start so you can Finish !!

Finished:         The Sea of Galilee Boat-Scott Miller-1:20 ,   Amati } Hannah Ship in a Bottle:Santa Maria : LA  Pinta : La Nana : The Mayflower : Viking Ship Drakkar  The King Of the Mississippi  Artesania Latina  1:80 

 

 Current Build: Royal Yacht, Duchess of Kingston-Vanguard Models :)

Link to comment
Share on other sites

Ian and hamilton, thank you very much. The other day I was routing around on the Maine Maritime Museum web site. They have a nice set of plans for the Pinky Schooner Maine that they finished building in 1986. I think that for my next model  I would like to try building something like that. A POB model just from a set of plans. So many nice boats out there.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

12 minutes ago, Knocklouder said:

Amazing detail,very nice ship. Someday I hope I will be able to plank like you ,very nice job.:10_1_10:

   Bob M.

Thank you Bob. You are doing a great job on your builds. I enjoy looking at your posts because you are always having so much fun!

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

Thank you very much No Idea and bobandlucy. There’s a little bit of wonk in her but nothing too serious 😀

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

  • 3 weeks later...

Hey Everyone, hope you are all well. Thank you for the great comments and Likes. I decided to get going on the metal work for the rigging. There are four turnbuckles attached to the bowsprit. From what I’ve read turnbuckles we’re used when using wire rope and lanyards were used when using rope. The plans say to use black rope for the inner bobstay and the bowsprit shrouds that are attached to three of the turnbuckles. I thought about looking for some light grey rope to maybe simulate wire but I have dark brown and will go with that. These are the kit supplied frames for the turnbuckles.

 

2D271FF7-DFBF-4B3C-ABF0-E76B8760A9A9.thumb.jpeg.287a0e41229fd832a84f4231558fa4aa.jpeg

 

 

I tried drilling the holes for the screws but it didn’t go well. Changed over to 1/16” brass tube. 
 

E2C45E93-5017-46A9-BF0F-389F50A430B2.thumb.jpeg.831e637e6c4cd1e2aae8c7f116f3c967.jpeg

 

The shackles have gone through a few revisions. Started with 22ga copper wire then changed to 24ga to try and get them slimmed down a bit.

 

BD9CFED4-3BE8-49B7-B766-7698294CA41D.thumb.jpeg.d8d1fc0f1a1349da90387496b527bb1c.jpeg

 

67AA4992-C4EB-4D57-B12F-6F15D65A6372.thumb.jpeg.5d1187322de42a389c9a38c30bb827a6.jpeg

 

Low temp soldering paste was applied to the whole assembly and when hit with the flame from a micro torch most of the shackle was tinned

 

2C3F7F40-412D-4186-943F-D5EEBD41C334.thumb.jpeg.18f9efdbe9707e9d5d4d598442a62315.jpeg

 

F18293DF-6CA8-4755-A966-6B5C31DF1FBA.thumb.jpeg.1195dfac4e49db3053c108407088e137.jpeg

 

3FFF865F-B914-47DD-BCF5-BE2F9B9B738A.thumb.jpeg.82528964bb4268d27ab408af955bb84c.jpeg

 

6486A451-3519-4ECB-B0B8-41ADF65F82D0.thumb.jpeg.bc7d8aedc98ec9914c830f9b1067390b.jpeg

 

This version of turnbuckle was glued together with CA. There was just as much drama with the bobstay brackets attached to the stem. They started out being soldered but then I ended up gluing the brass nails into the brass tube. When I look at the photos they look like they could be smaller but when I go over and look at the boat they look okay. The wire sticking out of the lower bobstay bracket is for attaching the chain.

 

33E10235-E16D-4F29-927A-82382E357E45.thumb.jpeg.f1dc8d16f6240362e0742ea3761fea1c.jpeg

 

A626B064-B115-4E88-944E-83C7A6CFE22F.thumb.jpeg.83ee5710856bba54fa7ce2fff2dafbd1.jpeg

 

BDC754E2-7534-49C6-B8D9-165B33B8B5CB.thumb.jpeg.47eb5f94616343336bf3e35ca63ae14b.jpeg

 

Surprisingly the kit supplied cat heads fit really well. 
 

944C6A1B-DBA6-44BE-A657-BC2B785E8D2E.thumb.jpeg.007187bd2b7a20812a0d03f84675d446.jpeg

 

Made a jig to hold the bowsprit bitts while gluing. This is when I decided to do something about the slots that were cut into the hawse timbers. They were not shaped very nicely. They were filled in and hawse holes were made instead. Fortunately this is a pinky and there’s lots of leeway 😀.

 

2957139B-BBE1-4094-A227-CD65DD769586.thumb.jpeg.ecb50cc4f4cbb46760174a2a37757804.jpeg

 

4181EA51-162C-4F5D-989B-5B7C6686C5F7.thumb.jpeg.404c7db45bb37d08ac8d30c7fe4a1fda.jpeg

 

5632F84B-A075-4733-A3FF-853B1CA15421.thumb.jpeg.5f511d8c7bf3ed839b0d70cf32c2b92e.jpeg

 

A hole was drilled under the hawse hole for the eye bolt for the foot ropes but it looked like it would interfere so a bracket was made to be able to utilize the hole while moving the attachment point aft. The bowsprit was attached and then the windlass. The anchor chaffing bars on the cap rails are made from 1/32” AYC that was sanded as thin as possible and then painted with Tamiya Dark Iron. 
 

659AD61B-CFBA-4D6D-9548-EACEE378C6C1.thumb.jpeg.9ba5cc961a99880f8114b40392825f0e.jpeg

 

EF075752-A9F9-43BE-B0E4-5CEE06EE9F23.thumb.jpeg.771f13848f7fe0c873c374c42f6318f2.jpeg

 

81FDD7EF-3DCC-4607-A99A-7B464F2601B7.thumb.jpeg.de0d2be5a61605642c1ad5e850cb1974.jpeg

 

12AE25C3-BCBF-43E6-BFBF-337BA9F0DE7D.thumb.jpeg.66a16762f7b7daf618a3a2298882ceea.jpeg

 

 

 

The tiller was cut from a sheet of 1/8” Cherry. The detent (?) plate attached to the side is a piece of laser board.

 

8E0E3197-C074-4256-951E-937D9F383444.thumb.jpeg.ef647d6fc77c5329b9758d84cf24c6bd.jpeg

 

0AF2BDAC-818D-441E-B278-8FD20793EC33.thumb.jpeg.c180a9491636ee5a07bc658b52773ac2.jpeg


 

Next will be completing the deck furniture. Still need a binnacle, pumps, stove pipe and maybe a barrel. Hope to see you soon.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

  • 2 weeks later...

Happy Boxing Day Everyone, hope you all had a Merry Christmas. As usual I didn’t do what I said I was going to do. Ended up working on both masts. The kit comes with 3/8” basswood dowels. Started by making a tenon to fit into the deck opening. 
 

7A044F75-33EF-4D93-BEC1-1D6CE3807456.thumb.jpeg.08bb84441f6451dc80cc7e61cba8c35c.jpeg

 

Used the tapering method where you blacken with pencil the area that you want to remove material from ( so that you know where you have planed) and then plane that area. Starting with a few inches at the top, blacken and plane. 
 

9745219F-0F5F-44C0-B80E-5D4A3D2862CD.thumb.jpeg.127b2d9d6bae3d53b1fdb6af726eb747.jpeg

 

E2CD2F8C-2054-4C10-A132-E04BFDB9AF3E.thumb.jpeg.155b717cc3e37dfdbc64828eb03ea39e.jpeg

 

Each time you blacken, add a few more inches down the mast. 
 

5433E4C9-2B69-4A7E-815A-93A36962CFBB.thumb.jpeg.d817ea18ea35593d34faba9bf409aaab.jpeg

 

D3E0A380-B520-43DD-B6CD-693F3A101BC2.thumb.jpeg.73700955a715ce0ce64400ec03777984.jpeg

 

E58E2E5E-FAFD-46E8-B9B5-653E50CB8D23.thumb.jpeg.5882fd2feff967f5e9db3f711e7b7361.jpeg

 

213316A5-A847-43AE-A9AB-AA2337CA915B.thumb.jpeg.13b737541d3ffacff95c1a1b1890f360.jpeg

 

When you get down to where the tapering stops, start back at the top and repeat the whole process again until you have the amount of tapering you need.  Eventually you will work your way back up to the top as the lower mast has enough taper and you end up at this point.

 

B4A317CA-8A56-479C-ACB3-FC7D3054484C.thumb.jpeg.90fccbb3a6b1e6ed4ec4514401669c1d.jpeg

 

 I ran 120 grit sandpaper up and down a few times between planing if needed and finished with 320 grit paper. Probably 90% of the material was removed by the plane so very little saw dust. Then gave the masts a test fit.

 

A77590D9-A024-4F48-A708-CA8D7EC27B83.thumb.jpeg.59cc2a021970dc38f7c93ca70533512b.jpeg

 

Both masts have the same number of cleats laid out the same way. Located the fore most cleat and marked the mast. Ran a piece of tape from  that mark, around the mast and back to the mark. Removed the tape and stuck it to a ruler. In this case the tape was 30mm long and needed to be divided into six sections so it worked out pretty good. Stuck the tape back on the mast and laid out the holes for the rest of the cleats.

 

3531968E-42C3-44AA-8B63-E0341624BBDE.thumb.jpeg.6a92b5ad73154f8cf919d51f28debb8d.jpeg

 

255677D3-F4BD-473D-9D5B-93857C168282.thumb.jpeg.509408992f52fc2243eb1e2e9f773c7b.jpeg

 

3E22C30C-9820-4F35-AE29-1317657D1AD7.thumb.jpeg.d04ca322cdee2701a75690f3ebf42d19.jpeg

 

BA515AE3-67F6-49A8-A60F-B5EF0FA5A296.thumb.jpeg.24f51feb0496b96d763b39ad4082700f.jpeg

 

31E56FAF-0A13-4889-8B3A-57B5CF281F5D.thumb.jpeg.47e5d86ff1a4aa30e720d13893f4ae14.jpeg

 

The mast coats and the main boom rest were all made the same way. Two pieces of 3/64” plywood were glued together. 3/8 holes were drilled in the plywood and the rest was all sawing , cutting and sanding.

 

04943125-2156-4CF9-8FAF-EBBF31E3B010.thumb.jpeg.09e7317d65c15eb24925d23410019fcf.jpeg

 

The throat halliard lead blocks were made by sandwiching a 1/32” strip of wood between two 1/16” strips.

 

 

 

27C0837E-95AF-449A-8FDB-449E57F1488C.thumb.jpeg.459cbd4350eb1ee7fdde4178d95090da.jpeg


‘The cheek block was made using a Technell 3mm x 1mm brass sheave from The Crafty Sailor and 1/16” brass strip.

 

 

54DB23E4-E7B5-4669-99DC-8D9D8B39B247.thumb.jpeg.7342e3b03248785f3b569512fb765a48.jpeg

 

5D1E2BDD-267B-4314-92D9-172A381123F1.thumb.jpeg.6f40d51f83a7a7e055c05a789c79d6fe.jpeg

 

7079F887-7D79-4DFB-8017-5994DCA54615.thumb.jpeg.3dfb4d3c5b06c72fcc7584fc21c0077f.jpeg

 

The main mast gets a test fit.

 

1451DEAE-C84D-4328-AF8B-A720E9388A17.thumb.jpeg.887a2d1016fdcd1f918670573885014e.jpeg

 

 

 

The fore mast has a gooseneck mounted for the fore boom. It was attached with CA. Brass nails are used to simulate the bolts holding the two parts together. The kit supplied pin that sits in the gooseneck disintegrated when I tried to clean off the flash so a new one was made with 1/16” brass tube. The top of the tube was squashed, shaped and drilled. A ring made with #24 copper wire was glued just under the flattened part to keep the pin in place.

 

D1AB35EA-BE3B-4250-ABDA-CF9C7B1CD663.thumb.jpeg.60a8e53e88b12fa2cc012c8627995763.jpeg

 

CE178E94-CCE9-4A96-9CCC-7DD839F4E90F.thumb.jpeg.bd491eeabdaed1685f81f23008da4688.jpeg

 

698CEF95-5403-4AA5-B764-1202D49EAD1F.thumb.jpeg.b0996def1afcabf01da93214ef1cca62.jpeg

 

The fore mast gets a test fit. 
 

D5D36A92-B5A1-433E-8124-AA4EE59678DA.thumb.jpeg.c6bb4edc6fc48e0794648ce3ab2cff4b.jpeg

 

Finished stepping the masts.

 

91D491D1-7E15-4712-ABA0-FCF0BCE8B6F1.thumb.jpeg.59cc23962191a4f82e3bc8b0955e91c6.jpeg
 

Have a great New Years and I hope to see you in 2023.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

  • 2 weeks later...

Hi Everyone, Happy New Year to all of you. Thank you very much for the Likes and comments. The fore boom and the main boom have been made. I substituted the supplied dowels with AYC square strips. The fore boom was made with 3/16 x 3/16 strip. First turned into an octagon then rounded and tapered. 
 

288C9CB5-06AC-4D8E-9382-183960F3F51E.thumb.jpeg.6539bc3a0424d15da545559e59058f56.jpeg

 

397ADA5C-CA59-4893-B846-35D23AFFABD5.thumb.jpeg.30415f5fc0603ce02452140e1f59746d.jpeg

 

A89695DA-2433-44E1-AAB7-5353D882DF38.thumb.jpeg.beffe74fd2364f09040dfb1d321e51e5.jpeg

 

A new bracket was made ( from brass ) to attach to the pin in the gooseneck because I didn’t trust the supplied one to not disintegrate like the supplied pin  did.

 

C6377D0C-C47C-4E6F-86A8-175E4E630660.thumb.jpeg.b0d14cc534f97a530fce1c2c5423d389.jpeg

 

9B54CBBE-5A46-472D-9994-820792A29508.thumb.jpeg.b674c2b981dba399b546f987cc58407d.jpeg

 

Next the main boom was made using 1/4” x 1/4” AYC. The supplied jaws were glued and pinned with 22 gauge copper wire. As much rigging as possible will be done before it is mounted. 
 

B2CF161C-65A3-407B-89C9-2C557F3303A3.thumb.jpeg.c164e6222b3c5399410bed5cfbf54ea1.jpeg

 

A697F40A-943B-4B48-8FB9-52B65FFE58C5.thumb.jpeg.2641ce978969aefc3eabe0911e7820bb.jpeg

 

CBB7F01A-1E07-4092-9B66-5BCC911A4B1B.thumb.jpeg.121800caf6de21f8e9dfcfd2664d6f33.jpeg

 

The deadeyes were made using rings cut from 1/4” brass tube.

 

4D043D35-5072-4509-91BE-470447FB0B4D.thumb.jpeg.a0e247d6c12bcecbac470d936cae1411.jpeg

 

The rings are sanded down on 320 grit paper using a push block that has 150 grit paper taped to it

 

550399B3-8FDA-4856-949B-673CA855A58D.thumb.jpeg.47db0b937ef47b18d587ac232554a82a.jpeg

 

F4D30B06-FA52-428A-959C-91CBA8543CE6.thumb.jpeg.06ebb6dfb4e7a5de38b9d1e46c42bd5e.jpeg

 

18D34FFD-8E5D-4FD9-8D9C-3B6E725B4272.thumb.jpeg.c972d18ee87c313b216407416a709fa7.jpeg

 

Dividers were used to start the shaping process and then switched out with round nose plies and needle nose pliers to complete the shaping. The whole thing was dropped into the blackener. Not sure how they managed to do it but no matter which way the deadeyes are oriented, the holes are skewed. 
 

AC358F39-0546-43FA-AD9B-BDA2969C18C7.thumb.jpeg.8d93fc5583d69a73e32c7eae551a9b55.jpeg

 

8CD59A50-900D-4DF0-AC62-F8AA6D1D534F.thumb.jpeg.bc9f206f963fe4816562b97526f6f79a.jpeg

 

2085FF7F-2D9E-462F-B7B4-69F49C137A1A.thumb.jpeg.39c7a7693c85163ebb4cf0b9b2f1fa20.jpeg

 

The plans call for the strops to be bolted to the chainplates but I went for this simplified version. I was just glad to get them all mounted to the boat.

 

908B1A9B-A7C5-42CA-B5DF-840524AA88C3.thumb.jpeg.103703868bc9cb847de70fc313d559fd.jpeg

 

D44E569E-1C5A-4941-A048-745B1302B6DF.thumb.jpeg.84e0e41e462d8bd47a86a17b7e9d5080.jpeg
 

E6FC3DF7-C764-42B6-BE96-1B18679331C3.thumb.jpeg.40df6fac05ff7a4f03bef5447ca55a2f.jpeg


The binnacle has just been started so I want to get that mounted before the booms are attached. Hope to see you next time

 

 

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

  • 2 weeks later...

Hi Everyone, hope you are all well. Thank you for your Likes. They are very appreciated. I’ve been working on booms, gaffs, deck furnishings and rigging. So a bit of everything. I have been watching an excellent YouTube video made by Outlandish Marine called “ The Schooner Prophet: Camden to Rockland “. It has shots of many interesting details so I’m taking cues from some of them. First up is the binnacle.

 

E5C870C0-9896-4C5A-9DC6-41CF3DF4F2E1.thumb.jpeg.9bf63e884ef5e29a3856ae0f38b46689.jpeg

 

6FC6F47D-C6F8-4BA9-9198-105C22243AC8.thumb.jpeg.7bb1550939193abe4b09b275b8cfe4d2.jpeg

 

6E71FA08-725A-4AB5-B39C-15E9B5A654E8.thumb.jpeg.ba5593f0d6a1b754dae5de9f182ec8f8.jpeg

 

3FCB7D89-88CF-4C50-B64C-AEE7E5CECF53.thumb.jpeg.1ce541ff115929508549dbd8376b7916.jpeg

 

0C3093C7-7B1E-48F5-B990-70E29510FCE3.thumb.jpeg.7ce8d5df64e8610cf64db2b474346702.jpeg

 

Next came the pumps. 
 

D4747FDE-FF4C-4C43-9A33-11F488C909F7.thumb.jpeg.afc0321826ce36227d0183488a624ebe.jpeg

 

5F25CAC2-0058-4A36-AAC2-6007ED04437E.thumb.jpeg.59df3695997b5e0d506bd5d9659a517b.jpeg

 

5288E56F-094B-4625-A1E1-1075570500F8.thumb.jpeg.7eca85fd77a99ca6155541c121d627ca.jpeg

 

9D35B607-5F11-46D3-B301-BD08225AC883.thumb.jpeg.2bdaa679358bed1e5a8720c3d40e89e0.jpeg

 

Once they were mounted the booms were finished being rigged as much as possible and then mounted. The main boom’s clapper is pinned to the end of the boom with #22 wire. A piece of insulation is between the clapper and the boom let’s the boom flex a bit if needed

 

15FE0BC2-6B4E-4EAD-A4E6-7A7B05093032.thumb.jpeg.2a90c67011c3ddfe93077ab9deabb3bb.jpeg

 

Then the fore boom was mounted and rigged.

 

C8E67DE4-236E-4E51-9275-209229EA9711.thumb.jpeg.dca7cf3bd84135054121fad26c43c802.jpeg

 


F4EFB071-9BDD-49F4-ADCC-DD1AAA93108D.thumb.jpeg.3ca3d4bca7b3649564ab13a72a8ccee0.jpeg

 

EACC7F84-7441-42AF-A804-97BAA5F0EB2C.thumb.jpeg.80536dc26fc41644d1754b7d6b0b68fc.jpeg

 

5F97A5B0-D055-498B-AE18-172519903B21.thumb.jpeg.7a20f75a1125da10271de45acfc7e458.jpeg

 

71E98955-67C0-42A1-9CA1-8CA86C3304E3.thumb.jpeg.49904efefd5f5d030ea62342314dec41.jpeg

 

The supplied water barrels were too big for where they were to be mounted so a new one was made. This is what I was going for.

 

B35AEF06-C9B0-4721-8B1A-F4B144C57F9C.jpeg.a62d3097faea7efbfd9b9eeec0c23a3e.jpeg

 

 

 

There was a lot of scrap left over from the mast hoops. Nine of the plywood disks were glued together and covered with 1/16” strips of AYC. The back corners of the strips were relieved to let them fit together more closely. 
 

64CE44EF-22B2-48B2-9F90-B3F248B067A9.thumb.jpeg.d0dd0bb0e48c02c6c3768afa5c8757ad.jpeg

 

8EB9D982-A896-4A57-A58A-17749B53F764.thumb.jpeg.74383c803f3bbc572a59e085aa8dc5d6.jpeg

 

036CDE06-D7A5-4F4B-AED5-B5BB4D33C91A.thumb.jpeg.8cc010d2e73d4235543dcc4de93a94f5.jpeg

 

B2C363AD-2BEC-4767-9814-2A26A81742E8.thumb.jpeg.d9fb757b5b579d812856bc5f6546d082.jpeg

 

The hoops are made with art tape. Gave it a test fit on deck. Not sure if there’ll be one made for starboard. The gaffs where mounted in the same manner as the booms.
 

1B7DF2A4-FB9C-4143-A390-F97079E520DD.thumb.jpeg.78224836490ef27cfac85fd5be6f05e1.jpeg

 

FFE1B378-4F4F-44DF-9AA3-E48134C49000.thumb.jpeg.15c4dcd06b4dfaba5dd3ee5fc424d6f0.jpeg

 

395C1F05-65B9-4534-BBA8-4BC131EEA74E.thumb.jpeg.0b185f0316ba6d2084c045139f873f48.jpeg

 

F0F79300-AFF6-42E5-99ED-2FCC31A8486E.thumb.jpeg.8766558f872a0e2be5c2c82898d07e78.jpeg

 

Getting close to completion. Just have anchors, stove pipe and a bit of rigging to finish. Hope to see you next time.

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

  • 2 weeks later...

Hi Everyone, hope you are all well. Thank you very much for dropping by and for the Likes. A bunch of little things were cleaned up this week. The stove pipe was made with 5mm aluminum tubing. A 4mm dowel was pushed into it and glued with CA. A pin was inserted into each end of the dowel for pinning to the deck and for attaching the T-piece at the top of the pipe.

 

DF8B02AA-1883-40A8-889C-D4EFE4C03C39.thumb.jpeg.88283aed93b1405a6d63eeaa530059d2.jpeg

 

1D8B7A13-961F-415A-B265-FAFB6E7B7C44.thumb.jpeg.d12efa583ee4ab8d8e1abc6d124eb1cb.jpeg

 

Stocks were made for the cast anchors. The anchor section in Chapelle’s American Fishing Schooners shows an anchor from a large schooner so I used some of those details when attaching the stock to the shank.

 

28703F28-BE3B-40AE-B642-455CED94D118.thumb.jpeg.62d3e473f27eb5e8bb0277f4ea65ca53.jpeg

 

8970A57E-8844-4E9E-BF6A-47A76D2CD848.thumb.jpeg.c70f493b2fc079664d6593ee821329ff.jpeg

 

BEC9ABCD-67C2-454E-9BC8-69B3256A167A.thumb.jpeg.db5d392c0324d05fe10833f77cd49ca0.jpeg

 

The dreaded ( for me ) rope coils were next. Cotton thread was used to tie the top of the coil through the loop and the free ends at the bottom of the coil

 

0D9D4017-76EF-42B9-9272-E91930498D13.thumb.jpeg.682c7f58620a0267b381cad1bf47727b.jpeg

 

93C231C1-641C-487D-B90C-7EFF55D59CCA.thumb.jpeg.7262656a2e253117f12278014afc60d3.jpeg

 

Drill bits were used to weigh them down while they had diluted PVA brushed on them. Three coats were applied over the course of a day 

 

CE23E537-48EE-4CB0-B525-7970C2F24A6D.thumb.jpeg.0316ac050b67ee802df1fc3300f7efcf.jpeg

 

445D25CA-0B84-4F3A-8318-76B9EF5A1F2B.thumb.jpeg.e84e30b2ed10c44252d6375a2b2fc234.jpeg

 

 

 

0353F4A1-950F-4786-B538-9E1536EC04CC.thumb.jpeg.2ca3a0f1a7917f50c0a57beea486f551.jpeg

 

8086857E-201E-4D1D-83E2-BEC7A7C031F0.thumb.jpeg.d4792081e260b32ba1abb11f7bdb3228.jpeg

 

They still need a bit of shaping. Then the stack was glued to the deck.

 

A71E7017-6044-4719-A425-953BAEB73EAB.thumb.jpeg.d4d695238e3f6e45e7947f175cd9866a.jpeg

 

EF0312E4-FAED-4D44-8040-5AD059D14E5D.thumb.jpeg.e9897ef8694afdb7a1d6f9921865e9c7.jpeg

 

 

 

Belaying points were finished up and the firkin was lashed down

 

436A8E14-0DB2-4DE7-B175-F62F6BF057AC.thumb.jpeg.e238249bd06a351448382fd5183fb325.jpeg

 

302880EF-4499-4778-A08E-ACDDDEC9CF58.thumb.jpeg.f27fc90bd29c268ac5fea486792afb44.jpeg

 

76FC2AE5-9A2B-45FB-B055-FF805E270C6D.thumb.jpeg.6358ac405ac619b145b19539b4316ad1.jpeg

 

Foot ropes were added to the bowsprit. The gaskets are still being coated with PVA to convince them to hang a little nicer.

 

C10861BE-3CCB-4C0E-BDA8-A1BF793C21A6.thumb.jpeg.c5f407a33a9377f09776c0764d6f31b8.jpeg

 

Now it’s time to start on the port side. Take care and hope to see you soon.

 

Edited by Paul Le Wol

Regards……..Paul 

 

Completed Builds   Glad Tidings Model Shipways. -   Nordland Boat. Billings Boats . -  HM Cutter Cheerful-1806  Syren Model Ship Company. 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...