Main Lower Mast Construction Completed

As my wife and I are still waiting for the birth of our newest granddaughter I have been able to spend a bit more time in the shipyard. The banding was added to the square section of the mast. I also added the banding to the the mizzen mast. I then added the deadeye to the main mast.

I-1062.thumb.JPG.6a19180618f7a7f60796e7cb32eb91da.JPG

The next job was to add the burton pendants. As can be seen in the next photo(s)  I also added a hole ready for the pinning the lower main mast yard.

I-1063.thumb.JPG.9da85e95a1b5547d3b8068c603de7457.JPGI-1064.thumb.JPG.57f8f54fb8faae344073eff307fb3b87.JPG

With the burton pendants in place I then add the shroud lines to the main mast. In the photo below the shrouds are looped around the chain plates to get an impression of how they will look when rigged.

I-1065.thumb.JPG.557557f530e1a39bc93552ffacd6dda6.JPG

The shrouds are nicely positioned around the main mast above the platform.

I-1066.thumb.JPG.23c8971354c181e5835bbc00e542b5b6.JPGI-1067.thumb.JPG.3d5942845ffc3b9194f61b7f6e5fa903.JPG

Glenn (UK)

Posted

Main Mast Shrouds

Our new granddaughter has decided she is quite happy where she is no rush to come out of the womb to meet her parents or brothers, etc. This means I have been able to spend a bit more time in the shipyard so I was able to started to add the deadeyes to the main mast shrouds.

 

I was using a jig to set the deadeyes to the same height but as I added the lanyards I was not happy with the alignment. It may not be that evident when looking at the photo below but the deadeye on the left hand side (arrowed) is much lower than the other two deadeyes. The middle one is also a bit to high.

I-1068.thumb.JPG.93cf83577cd571acf476fe05dcf64d88.JPG

I ended up removing all the deadeyes (and seizing thread) and starting again, refining my working method, so I could (hopefully) get a more consistent result. The refined method is detailed below as so far is yielding much better results.

 

Step 1 - Position the shroud in the jig and apply a known amount of tension

With the jig in place the shroud was positioned. Two pins were added to the bottom of the jig to aid the alignment. The line is held in place using reverse action tweezers. This should ensure the same amount of tension is applied to the shroud in readiness for the seizing.

I-1069.thumb.JPG.dcacbe6bb1eb205d8c5086a8a997eac4.JPG

Step 2 - Ensure the seizing starts at the same point for each shroud

Next a length of seizing thread was feed through the shroud line, whilst the line was held under tension. This should mean the seizing is set to the same height for each shroud.

I-1070.thumb.JPG.69ad20fe4a11d3c57abc81b8e42542fa.JPG

Step 3 - Create the loop, ready for the deadeye

With the seizing thread in position the shroud could be held in the quad hands so a loop could be formed.

I-1071.thumb.JPG.041b48d2729b554b4e093065a957da4d.JPG

Step 4 - Add the seizing

With the shroud held in the quad hands it was a simple job to apply the seizing to the loop.

I-1072.thumb.JPG.f9932eb2024f9bdeb87b822ca563dc9f.JPG

Step 5 - Add the deadeye

After a touch of ca glue was added to the seizing the excess seizing thread was trimmed. Next a deadeye was added and the loop could be closed up by pulling the free end of the shroud.

I-1073.thumb.JPG.0e68c1a9638e8a578ae1a922c35d038f.JPG

Step 6 - Check the alignment

The final task was to add the lanyards and to then check the overall alignment. So far the refined method seems to be working much better.

I-1074.thumb.JPG.a0c0dc04cce69460ccee9a0f9780fe31.JPG

 

I-1073.thumb.JPG.0e68c1a9638e8a578ae1a922c35d038f.JPG

Once the lanyards were added it was possible to look at the alignment. It is looking much better.

I-1074.thumb.JPG.a0c0dc04cce69460ccee9a0f9780fe31.JPG

Glenn (UK)

Posted

Using the refined method outlined in my last post has resulted, in my opinion, a set of shroud deadeyes which are fairly well aligned with each other.

 

A little bit of tweaking will be possible when the lanyards are tied off around their respective shrouds.

 

I also have found that my refined method is much easier and quicker to use, compared with some of my previous methods.

 

I am also happy with the how the chainplates and links follow the same path as their respective shrouds.

I-1075.thumb.JPG.0b50c35f48278adeeb0f46cea6cee81a.JPGI-1076.thumb.JPG.d3a33df394c219dc7f056f2a84933aa5.JPG

Glenn (UK)

Posted

Mizzen Mast Shrouds

Our new granddaughter Betsy Beau Constance finally arrived early on Monday morning which this meant there was no time in the shipyard as my wife and I had to look after one of the other grandkids for a couple of days.

 

Returning to the shipyard this morning I started work on adding the shrouds to the mizzen mast, The first task was to add the burton pendants. There is one pendant per side required.

I-1077.thumb.JPG.e7bac106ed280f8c77c21aa4498e1180.JPG

There are 3 shroud line pairs per side required for the lower mizzen mast and these were added to the mizzen mast. The position of each shroud pair was carefully adjusted as they were installed.

I-1078.thumb.JPG.02285b8843a6f3a003ae4d3d41e05428.JPG

A jig is used to set the position of the deadeyes in the shrouds. With the jig in position a deadeye can be added to the first shroud. You will note there is a hole in the top of the jig which is there to aid the process.

I-1079.thumb.JPG.00c16c5926b8ee503230101ce88554fb.JPG

The purpose of the hole in the jig is to help set the position for the start of the seizing, as can be seen int he next photo.

I-1080.thumb.JPG.a3fbd4fa9f0ce0c368dbe3f9f39dccb3.JPG

With the deadeyes added to the first shroud pair the lanyards were added. The jig seems to be working a treat as the shroud deadeyes look to be set to the same height.

I-1081.thumb.JPG.c2b129f5a1191b45f8ac986c4ce6eac5.JPGI-1082.thumb.JPG.78745b2cacd25ca0aae1b38227228008.JPG

Glenn (UK)

Posted

Nice jig! What are the 2 pins on the bottom of it for?

Tim

 

Current build: Continental Navy Frigate ALFRED (build log)                      

Past builds:     Steam Tug SEGUIN (build log in the kits 1850-1900 section)       

                         Liberty Ship SS Stephen Hopkins (Gallery & Build Log)

                         USS Basilone (DD-824) (Gallery & Build Log)

                         USS Olympia (Gallery)

                         USS Kirk (FF-1087) (Gallery & Build Log)

 

 

                        

Posted
8 minutes ago, schooner said:

Nice jig! What are the 2 pins on the bottom of it for?

Thank you. With reference to the attached photo the two pins at the top and bottom of the jig are simply guides which will hold the shroud line in place before the tweezers are added to keep the tension before the needle is passed through the thread. Another option which I did consider was to feed the thread through the top hole and then to use a similar hole at the bottom to hold the thread in place but thought this would be more time consuming. The jig, as shown in the photo, works really well for me. I did have spent a bit of time perfecting the method.

 

Hope that helps

image.thumb.jpeg.ecdb82f6c6663761a258819b588014f5.jpeg

Glenn (UK)

Posted

Main and Mizzen Mast Work

With the shrouds tied off on the right-hand side of the main mast it was time to add a few ratlines. I created a ratline template and marked off every 5th ratline position and the positions which require the ratline to connect to all the shrouds (F). My normal working method is to add the ratlines around the shroud seizing's and then to add the full length ratlines (F) first . Once the F's have been added I will then add every 5th ratline. I find this method helps me maintain the shape of the shrouds and reduces the risk of the hour glass effect.

 

The template is in position and the F's and 5's marked up.

I-1083.thumb.JPG.26c88f95003d03874d25957d7e37ddc4.JPG

Close up of the shroud seizing's, noting I opted to only add two seizing's per shroud, although 4 were shown on the rigging plans.

I-1084.thumb.JPG.ae224778c8ccdb4ddd3006442d4b2ec7.JPG

The top two main mast F ratlines have been added next to help with the shroud shaping. The apparent droop of the lower ratline toward the right hand edge is an photo optical illusion.

I-1085.thumb.JPG.82fa3cfe757eff9e885d4a69e3bcdf44.JPG

Once the main mast F ratlines have been added I plan to move on to getting the mizzen mast ready for the ratlines. The mizzen mast shrouds have already been added and the lanyards added but not tied off.

I-1086.thumb.JPG.0e062460ae4bf5be18e2d3daefbf106b.JPG

As can be seen in the final photo all the shroud deadeyes look reasonably level.

I-1087.thumb.JPG.14713615fc34af6f3dbb82d7625baa3d.JPG

Glenn (UK)

Posted (edited)

Main and Mizzen Mast Ratlines

Work is progressing slow and steady with adding the ratlines to both the right-hand side main and mizzen lower mast. It seems to break the monotony of task by switching between each mast. I am using a stiff card for the templates and have found it stays in place best when clamped to the deadeyes. The photo below shows both the templates in place.

I-1088.thumb.JPG.ebacd0ab7a9002b8beea173fbc3df7dd.JPG

I have completed adding the full length ratlines on the main main mast (F). I have also add every 5th ratlines to both masts.

 

Main Mast

I-1089.thumb.JPG.570894b225499b1b9f54790303ed08c4.JPG

The next photo shows some of the completed F and 5th ratlines

I-1090.thumb.JPG.03a324bc6e990809db38397fe0081137.JPG

I have added the ratline between the 35th and final F ratline, as can be seen in the photo below. This will help with keeping the spacing between the shrouds.I-1091.thumb.JPG.831a21ba056fecef39a4657e3f6d64d1.JPG

Mizzen Mast

I-1092.thumb.JPG.31b3f352f0b7753cec8c50ea4b2ba601.JPG

Some of the completed 5th ratlines

I-1093.thumb.JPG.fcbd03e706d2d52ebb4540f9e8c2d581.JPG

Adding a few more near the top, as this helps with retaining the spacing between the shrouds.

I-1094.thumb.JPG.51f41352da9a97cde8e4cdded50de617.JPG

Edited by Glenn-UK

Glenn (UK)

Posted

Main and Mizzen Mast Ratlines

I have now completed adding the ratlines to the right-hand side of the main and mizzen lower masts. I am reasonably happy with how they look. I have managed to avoid the dreaded hourglass effect and apart from the odd one there is not a great deal of ratline droop between the adjacent shrouds. I am still undecided weather to leave the ratlines beige or to dye them black using Indian ink.

 

I have it all to do again for the left hand side main and mizzen mast. My time in shipyard will be limited over the next few days it might be next week before I can start to make progress.

 

When taking the photo's below I used some scrap wood to try to show the ratlines.

 

Main Mast

I-1095.thumb.JPG.20baea4d0d1c0dc73e5b6e962b97d5af.JPG

Upper section main mast

I-1096.thumb.JPG.b8e8c9d545ac01c2fed1bc13b5eeda28.JPG

Mid section main mast

I-1097.thumb.JPG.f63096c8eb7a97b51ee2934529be99a2.JPG

Mizzen Mast

The lower section

I-1098.thumb.JPG.b7693ab9d41fc7832fd1fea3f5fd89aa.JPG

Mizzen mast top section. I have highlighted a couple of ratlines which I may redo as they do not look good.

I-1099.thumb.JPG.f13279db86c37846ffbc5c23fdb24cd1.JPG

To complete this post see the following two photos

I-1100.thumb.JPG.8c5f1e97af7a2127baa3470b307b1ef4.JPGI-1101.thumb.JPG.bbdd917f0538eead0bc1d191224a4b52.JPG

Glenn (UK)

Posted

Modified Deadeye Jig

Before commencing work on adding the deadeyes to the left-hand side main mast shrouds I decided to improve the jig used to set the position of said deadeyes.

 

Using the two locating pins the jig is placed on the first channel deadeye. With reference to the blue arrow on the photo below the shroud is then brought down placed between the alignment pins.

 

The modification to the jig was adding a hole at the bottom, as shown by the yellow arrow. The shroud is then passed through the hole and held in place with a clamp (red arrow). The addition of the hole helps to keep the tension in the line when clamped.

I-1102.thumb.JPG.01bda073c883cc4c553a04f2f0a722ca.JPG

With the shroud line in place the deadeye seizing thread is then added. Using the same reference point as per the right-hand side I am using the top edge of the jig as the reference point, as can be seen in the photo below (blue arrow). I have added the shroud deadeye seizing thread to all the main mast shrouds in readiness to creating the loops and inserting the deadeyes.

I-1103.thumb.JPG.908e56b261daa25775e9633eb10efdbd.JPG

Glenn (UK)

Posted (edited)

Adding deadeyes to shrouds

Following on my from last post I thought I would detail how the deadeye is seized.

 

Step 1

With the jig in play a length of seizing thread is pushed through the shroud line, with the aid of a needle.

I-1103.thumb.JPG.917e6d6ca1aac7621320d188bb72f42e.JPG

Step 2
Using the quad hands the seizing loop is formed.

I-1104.thumb.JPG.29f18bfb0afd51d82a2dd2c0065ccd2c.JPG

Step 3

Using a simple cross over knot the loop is secured.

I-1105.thumb.JPG.c2821d55a0d5df56208a8db7fe299f51.JPG

Step 4

The two free ends of the seizing thread are looped around and another simple crossover knot is formed.

I-1106.thumb.JPG.75ceee2ec2195c5be5190c79ec60796b.JPG

Step 5

The two free ends of the seizing thread are passed through the loop once again

I-1107.thumb.JPG.701e2148b1096e42b181965b3db3a07a.JPG

Step 6

Another simple crossover knot is used and the seizing process is complete.

I-1108.thumb.JPG.b43b2ee1ec3845c4c5750f34c07d74a7.JPG

Step 7

Once the free ends of the seizing thread have been trimmed the loop can be pulled tight around a deadeye.

I-1109.thumb.JPG.9a1bd2e255ca7e4efa1985525b76da36.JPG

Step 8

As each deadeye is seized the lanyards are added to check the alignment. As can be seen in the next series of photos the jig and seizing method has worked well as the shroud deadeyes are nicely aligned. I will adjust the rotation of some of the shroud deadeyes when it is time to tie the lanyards off.

I-1110.thumb.JPG.fe790d12a0d94cd4aa45ad58a161b53c.JPGI-1111.thumb.JPG.ab10465c5d5fe3b90ca77543112543de.JPGI-1112.thumb.JPG.bcc5fd2fd618e7b1c95257bebd72138f.JPGI-1113.thumb.JPG.533fd9aa842ab706718b9206101a10b8.JPG

 

I-1114.JPG

Edited by Glenn-UK

Glenn (UK)

Posted

Left-Hand Side Main Mast Ratlines

After a short break from the Indy, due to a visit to Manchester to see a great concert at the Lowrey plus a visit to see two of the six grandkids, I made a return to the shipyard. The lanyards were tied off and the free ends of the shrouds seized. I then prepared the template for ratlines. I marked the approx run lines of the shrouds. These are a useful guide and helps prevents the dreaded hourglass effect. As indicated in previous posts my preferred method is to start with adding all full length ratlines (every 7th one). I added a F reference on the template. Once all the F's have been added I like to add every 5th ratline, indicated by a 0 on the template. Next with the middle ratlines between every 5th one, marked with a 1 on the template.

I-1115.thumb.JPG.091b02b21e02e6545fa765a87f22d7cd.JPG

The template is then carefully aligned and clamped in position.

I-1116.thumb.JPG.b71553b0b1e6527314f5b04f53a1d395.JPG

The next photo shows the shroud seizing's and lower ratlines. You will note I have added the F and 0 ratlines.

I-1117.thumb.JPG.369a2beff2b735331b8052cf7a9c0952.JPG

More photos of the progress of the F and 0 ratlines. They have all been added so on my next shipyard visit I can start work on the 1 ratlines.

I-1118.thumb.JPG.6a1b7156cc80ec748842d3c6c37a12ee.JPGI-1119.thumb.JPG.30482f16448ff5f1efdee3a7008c7bb9.JPGI-1120.thumb.JPG.7a87ed88ec79c586d95f95cdaad4575b.JPG

 

 

Glenn (UK)

Posted (edited)

Lower Masts Shrouds and Ratlines Completed

Today I tied the final clove hitch knot required for all the lower masts ratlines. I feel like a huge weight have now been lifted of my shoulders now this task is complete. I am very happy with how the shrouds and ratlines look apart from the left-hand side main mast which has a slight kink on the lower lead edge section. I do not have the inclination or patience to remove the ratlines and redo as I suspect I will be the only one to see the defect once the model is complete.

 

My next job is one of my least favourite rigged tasks which is to add the futtock staves and catharpins to each of the lower masts. I have been contemplating how to go about this to make it easier to complete. I have an idea with regards to adding the futtock staves which, if successful, should make it a relatively painless and simple task to complete. I also have a couple of ideas with how best to fit the catharpins which I will experiment with before trying to add them to the Indy.

 

I have added a few photo's of the current build status.

I-1121.thumb.JPG.62f43a8bf28d4b23c9503c118678e689.JPGI-1122.thumb.JPG.035dd698d11e88dc885be162cedee3de.JPGI-1123.thumb.JPG.28b075f93b9fa8d6734952a3c22f9112.JPGI-1124.thumb.JPG.ccf342978a335a77247a4f9b62874b3e.JPG

Edited by Glenn-UK

Glenn (UK)

Posted
23 minutes ago, Blue Ensign said:

I think rigged to the point you have her now makes for a nice display option, I always like the 3/4 bow shot angle when masted and rigged with lower shrouds.

 

B.E.

Many thanks. I agree is does look great as is, however I will push on to complete all the masts, yards and associated rigging even though I am itching to start another model but I will try to remain patient. Hoping the Indy will be completed in the next few months.

 

Your Indy looks amazing, excellent building skills.

Glenn (UK)

Posted

Foremast Futtock Staves and Catharpins

One of my least favorite rigging tasks is adding the futtock staves and catharpins. Adding the futtock staves to the lower foremast actually turned out to be a relatively simple and painless task. After chemically blackening two lengths of material the futtock staves were held in position using my quad hands. Once I had tied the futtock stave to the two outer shrouds using a figure of 8 pattern the quad hands were removed and the remaining shrouds secured.

I-1126.thumb.JPG.c03955c19e7fa967d2a9dc500971212c.JPG

The shroud pairs are to be linked together with 4 catharpins. I opted to run the futtock staves parallel with each other therefore after careful measurement I decided the required length was 45mm for the aft and 50mm for the leading catharpin. The leading one needs to be longer as it has to fit behind the foremast. Before they were fitted I did coat them with diluted wood glue and then dried them off with a hair dryer to get help with the look of tautness. With these two catharpins in place I am pleased with how they look. The two inner catharpins still need to be added.

I-1127.thumb.JPG.916370902c1ec4430dcb9da2e9d0747f.JPGI-1128.thumb.JPG.72b5bef8ea6e91abb096094e76197ed8.JPGI-1129.thumb.JPG.8f14df8ae2f23d59ba396c69ca029bb3.JPG

 

Glenn (UK)

Posted

That foremost Catharpin doesn't look right to me Glenn, severely chafing against the mast.

As I understand it catharpins were not applied to the foremost shrouds for that very reason.

 

Starting with the ninth shroud(aft)  I think alternative fixings to the 7th, 5th, and 3rd shrouds are a more likely arrangement.

I know the plans show the catharpins attached to the first shroud but I don't think that is correct.

100_1619.jpg.79b303ccdf9d7977ae425690b1f536cc.jpg

1619

As you can see here on Victory, they don't extend to the first two shrouds and clear the back of the mast.

 

B.E.

Posted (edited)
6 hours ago, Blue Ensign said:

That foremost Catharpin doesn't look right to me Glenn, severely chafing against the mast.

As I understand it catharpins were not applied to the foremost shrouds for that very reason.

 

Starting with the ninth shroud(aft)  I think alternative fixings to the 7th, 5th, and 3rd shrouds are a more likely arrangement.

I know the plans show the catharpins attached to the first shroud but I don't think that is correct.

100_1619.jpg.79b303ccdf9d7977ae425690b1f536cc.jpg

1619

As you can see here on Victory, they don't extend to the first two shrouds and clear the back of the mast.

 

B.E.

Very informative and many thanks for the heads up. I really like research like this as it really helps improve my limited knowledge base.😀

 

I will leave as fitted for my Indy build as I am happy with the alignment of the futtock staves and once fully rigging it will not be that noticeable.

Edited by Glenn-UK

Glenn (UK)

Posted

This topic continues to be very interesting.   With only four catharpins being appropriate for the time period, I have not been able to find if there was a standard for which shrouds would have had them.   Common sense suggests they would not rub against the mast as B.E. has pointed out, but which ones would have been used as the norm?  Those in the photo aft of the mast on the Victory seem to make a lot of sense. 

Allan

PLEASE take 30 SECONDS and sign up for the epic Nelson/Trafalgar project if you would like to see it made into a TV series.   Click on http://trafalgar.tv   There is no cost other than the 30 seconds of your time.  THANK YOU

 

Posted

Fitting the inner foremast catharpins

I thought I would share the method I have used to fit the two inner catharpins for the lower foremast. This method has worked really well for me.

 

When looking at method for how these were fitted the two diagrams shown in Longridge's book indicates the catharpins had thimbles (loops) at each end. Seizing thread was then passed through the loops to secure to the futtock stave. As per @Blue Ensign comment above the leading catharpin should not really be secured to the first shroud position and then bent around the mast.

I-1128.thumb.JPG.5203fe00b7c60eccda8765224690465b.JPGI-1129.thumb.JPG.f21c5d65646900522630ae7bd7074f2e.JPG

 

Step1 - Making the first loop

I cut a length of 0.5mm black thread a wrapped it around a copper bar to create a loop. 

I-1130.thumb.JPG.4cb7bb2edb20e551d1ac21fb56722d25.JPG

Step 2 - Add first seizing

I opted to use 0.1mm black thread and added the seizing. I think it may have been better to used fly tying thread for the seizing in hindsight.

I-1131.thumb.JPG.7b2360bf447e7974ba4209868631f020.JPG

Step 3 - Add the second seizing

As shown on the rigging plans there are two seizing's required.

I-1132.thumb.JPG.459e669f8e9d34690150554b372b2774.JPG

The thread is removed from the quad hands  and a touch of ca glues was used to stiffen the loop.

I-1133.thumb.JPG.5367d478d654fab68c26a736fcc70313.JPG

Step 4 - Create the second loop

Using the same method as before the loop at the other end of the catharpin was created. I had made a simple jig to set the required length of the inner catharpins. Once the first seizing of the 2nd loop had been added the catharpin was place on the jig. The position of the seizing was carefully adjusted until the require length was achieved.

I-1134.thumb.JPG.a864436cb0009a0db1d01f6ee86bd4ab.JPG

Step 5 - Completing the Seizing

The catharpin was returned to the quad hands so the seizing to the to the 2nd loop could be added. Once that was done the catharpin was held taut in quad hands and a light diluted coating of pva was applied. A hairdryer was then used to to quickly dry the diluted solution.

I-1135.thumb.JPG.46d38fedecf002f069831b34086889e0.JPG

Step 6 - Adding the thread to the loops

A length of 0.1mm black thread were added to each of the catharpin loops.

I-1136.thumb.JPG.2022be092e92e5235c6604112bd267ae.JPG

Step 7 - Fitting the catharpin to the futtock stave

The flying leads are then thread over and under the futtock stave and secured using a standard reef (square) knot. 

I-1137.thumb.JPG.c9760db8cffd3aa12f52ac52974a8540.JPG

I-1138.thumb.JPG.b726b152438b6193322398ecc3d560bb.JPG

Step 8 - Repeat the process for the other inner catharpin

A second catharpin was made using the exact same method as detailed above and added to the foremast futtock stave.

I-1139.thumb.JPG.407ed408d4e90e798a9949ce5d62eff3.JPG

Glenn (UK)

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...