Jump to content

Recommended Posts

Posted

Wipe On Poly.

Alan O'Neill
"only dead fish go with the flow"   :dancetl6:

Ongoing Build (31 Dec 2013) - HMS BELLEROPHON (1786), POF scratch build, scale 1:64, 74 gun 3rd rate Man of War, Arrogant Class

Member of the Model Shipwrights of Niagara, Niagara Region, Ontario, Canada (2016), and the Nautical Research Guild (since 2014)

Associate member of the Nautical Research and Model Ship Society (2021)

Offshore member of The Society of Model Shipwrights (2021)

Out of State member of the New Bern Maritime Modelers Guild (2025)

Posted
56 minutes ago, Glen McGuire said:

Very handy tools!  I also use them to square things up.

 

Also, what is WOP?

As Alan said it is wipe on poly, a thin polyurethane that you wipe on with a rag and then immediately wipe off. You can build it up in several layers to get a very nice finish. I only used two layers at this point since it will be applied over the whole hull again at some point, but I need to paint / plank before I start adding more. It makes the wood slightly darker for every layer you add and so I want the keel to be slightly darker than the planking (to help differentiate it), but not too much so. If you search you can find a number of guides to using WOP here on MSW.

 

I didn't discuss this in detail in the post, but the reason the upper part of the stem looks much duller is I pretty much sanded away the layer of WOP I added to it initially. I want the ink I am going to use to paint it to sink into the wood and so I don't want the WOP barrier in the way.

Posted

Time for a minor update. I continue to add bulkheads and am getting close to the bow at this point. You may notice some of the bulkheads have been painted black. The reason for this is I am as of yet unsure how much of the main deck I will open up to being visible and so on the off chance that these parts are seen I want them to fade into the blackness of the lower deck. They represent areas that would actually have been open and so we need to create the illusion of space.

PXL_20250524_112713145_Original.thumb.jpeg.b05e084cce4eabee3de31b8b90ad9a47.jpeg

One thing I don’t think I appreciated fully until now is how much minor errors or slight alignment issues can have significant impacts on a model when it comes to the main structure. I ran into one issue (though I was able to correct it) and since have been much more careful about checking everything in all 3 dimensions. This all makes me very thankful that the Vanguard Models kit I used for my first model was so precise. Really I took the structure of the model for granted. It is much harder when you have to cut and align everything yourself and even parts being a millimetre off can make a significant difference.

 

Thanks to everyone who is following along for all your encouragement.

Posted

In awe...

So impressed by your care and attention to detail

 

David

David

 

Previous Builds

HM Cutter Hunter Mamoli 1:74

Baltic Ketch Scotland - Corel 1:64

HMS Fly - Swan Class ship sloop - Victory models 1:64

HMS Diana - Artois Class Heavy Frigate - Caldercraft - 1:64

HM Cutter Trial 1790 - Vanguard Models - 1:64 

18th Century Merchantman Half Hull - NRG-1:48 

HMS Speedy 1782 2023 Edition - Vanguard Models - 1:64


Current Build

HMS Harpy 1796 - Vanguard Models - 1:64

 

Posted

I don't have a tonne of progress to show, but as it has been about a week since I last posted I figured I would give a short update.

 

I continue to work away at the bulkheads and am now nearing the end. The only bulkheads left to put in place are the final two at either end. I have left these till last as the stern ones are the most fragile and the bow ones need some pre-fairing before I glue them in place.

PXL_20250531_003243369.thumb.jpg.8cfb6f80bd43c71fbc9c0965dd78d2e5.jpg

Still lots of structural work to go, but she is starting to take shape now.

  • 2 weeks later...
Posted

Log #24: Structural Supports & Fixing Mistakes

Thanks to everyone who has stopped by to take a look at the log. I do find your comments and likes motivate me to keep pushing forward.

 

Since my last log entry I have continued to work on the structure of the model. I will discuss that in more detail below, but I have also in the background been continuing my work on research. My current focus is on the coppering of Perseus. She was one of the first ships in the RN to be coppered and though I am not planning on coppering her, I am planning some aesthetic choices which will allude to the coppering.

 

The handwriting of the documents I am currently looking at is not as good as some of the stuff I have previously looked at so it is slow going with the transcriptions at the moment. But I thought I would share an interesting tidbit I found.

Quote

Ships coppered between 79 + 1781 inclusive

Ships of the line    82
Of 50 guns            14
Frigates               115
[???] & Cutters    102
                            313

It is interesting to see how quickly the RN went from very few ships coppered to coppering  a huge share of the fleet. You can see in the above transcription that from 1779 to 1781, 313 vessels were coppered.

 

On the model itself, I have now got all the bulkheads in place. You will notice that the front two and stern two bulkheads do not have any bracing pieces as they are closer together.

PXL_20250605_235346341.thumb.jpg.44e7a5b2c5f5cb4a8d4ea98036c7ffee.jpg

The reason for the omission is that I am planning on filling in these sections fully with filler blocks. First I cut the bow filler pieces and glued them in place.

PXL_20250607_174605669.thumb.jpg.38660db0ad76cadcb438d575e31d6ae8.jpg

Then once that was dry I slid pieces of basswood which I had thinned to the appropriate thickness into the gaps between the bulkheads and marked off with pencil the approximate size they needed to be before cutting them out on the scroll saw. There is no need to be particularly accurate here so I have erred on making them oversized as this will all be sanded in the faring process. The most important part of this was making sure the bulkheads remained square through this process.

PXL_20250609_002748552.thumb.jpg.05cbb89e228ed6c7affc485f5e5894f7.jpg

However, it was around this point that I realized I had made a mistake with one of the bulkheads. Essentially the slot was not deep enough and so it was not far down enough on the center bulkhead. It was only off by about a mm, but this is enough to throw off the lines of the ship. So I had to break out the isopropyl and slowly work it free with a knives and solvent. It was particularly unfortunate that the offending bulkhead was at just about the worst possible location (the stern platform also had to be removed). However after a few hours of working slowly and carefully on it, I managed to get it out.

PXL_20250531_114828714.thumb.jpg.95bbb72c17e85de78b29a4897317b9bf.jpg

Then I sanded and dry fitted it back in place, making extra sure of the positioning this time :).

 

Finally, I have also been starting the outer structural supports.  This is a line of bracing pieces which run along the upper deck line. These serve three purposes:

  1. To allow me to correct for any warped bulkheads which might be square at the base, but are not square at the upper deck bulwarks.
  2. To strengthen the overall structure.
  3. To allow me to better see the line of the main deck to determine if I need to make any adjustments.

These pieces are inserted square to the bulkheads, but at an angle such that they follow the sheer of the deck. I will then use a combination of planes and sanding to trim them back in line with the frames.

PXL_20250608_231935237.thumb.jpg.37318b0098d7ee11e72f812a2699e829.jpg

Getting the sheer of the main deck right is crucial as it will determine the height of the gun ports.

 

It feels like this structural work is taking a really long time, but I am trying to avoid future problems by making sure I am constantly checking to make sure everything looks good now while it is easier to fix.

Posted

Excellent work and great catch on the errant bulkhead! The model’s really coming along well.

 

Very interesting statistic about how quickly the royal navy coppered its ships. That's a lot of copper, and as I was under the impression (possibly incorrectly) that coppering was expensive, I wonder how they financed it.

Posted
2 minutes ago, JacquesCousteau said:

Excellent work and great catch on the errant bulkhead! The model’s really coming along well.

 

Very interesting statistic about how quickly the royal navy coppered its ships. That's a lot of copper, and as I was under the impression (possibly incorrectly) that coppering was expensive, I wonder how they financed it.

Thanks Jacques,

 

Oh it was expensive, in many cases it cost almost as much as it cost to build the ship in the first place. For example Perseus was built by contract for a cost of £4,507, but her coppering cost £4,310. That said there were certainly some significant benefits. Many of the refits that you see documented often cost 50% of the ships original cost to complete. One document I have just finished transcribing is an analysis of the impact of coppering and he has this to say:

Quote

Their Lordships will be pleased to observe, that the ships, on which the experiment has been tried, were run up hastily in time of war, and that the sheathing of all the three was put on by task, and yet that their whole defects, after three years unremitting service, were found to be not of so considerable or alarming a nature, as to have prevented their going on foreign service, had the continuance of the war made it necessary.
 

...when we look back and consider new ships, under wooden sheathing, after eighteen months service in the W. Indies, obliged to have every plank stripped and shifted in a six month repair, and two of these very ships here examined ordered to be stored for the East Indies about the time hostilities ceased, after three years constant service without being refitted. 

 

Posted

Very interesting! So, while coppering was certainly expensive, it significantly cut down on the need for expensive full refits every few years of ships sent into warmer waters. So some portion of the funding for coppering could have just come out of the maintenance budget (in theory, although in practice I have no idea if the Royal Navy handled its finances in that way).

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...