-
Posts
1,312 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Events
Posts posted by Kevin Kenny
-
-
-
Thanks John. We have made lots of mistakes. Understanding this complex hull shape has really taxed John and i. When i got the finial plans from John last week they varied quite a bit from the NMM plans so we are adjusting the hull now and will proceed to build the first draft of this model.
- hexnut, paulsutcliffe, yvesvidal and 2 others
-
5
-
-
- GrandpaPhil, mtaylor, Ras Ambrioso and 5 others
-
7
-
1
-
Another referance i just came across is
https://www.naval-history.net/WW0Book-Sennett-MarineSteamEngine.htm
-
-
-
- FriedClams, GrandpaPhil, druxey and 1 other
-
4
-
Any feedback on what a Thornycroft boiler of 1904 would look look like would be greatly appreciated. This is what i have been able to take off the plans but there were no visuals of the front and back just a side and top view. The steam engines were illustrated in an article from the Engineer but the boiler has been a challenge.
-
Hi Tom
i am so glad you found them useful as that was the sole purpose of doing them. When i started out modeling I found so little video content on YouTube that could guide and help me to acquire the skill necessary to build some of the more complex models. There was a lot of written stuff but much of it difficult to understand and follow. That was the motivation to do the videos. Today many years later there are now over 190 short videos that follow my building process on various ships. Your comment is greatly appreciated as recently i was unceremoniously thrown off a build that i followed, having been accused of “promoting my videos” , when all i did was respond to a new builder who had made an inquiry, and a request for help. I have long passed any desire to “promote myself” having discovered the wonderful craft of model building. I have found it challenging and stimulating having had a long successful career in business but still found the need to “stress” my brain to take me where i am uncomfortable and where most of the time I am ill equipped to handle the challenge. In Trinidad and Tobago where i live i have only recently found one modeler that i can discus my challengers with. So i am back to this forum as the only source of feedback. The two people who have been extremely helpful are Greg Herbert and David Antscherl whose support has been nothing short of fantastic.
best regardskevin
-
- yvesvidal, willbor-237, druxey and 7 others
-
10
-
Hi Bob
i was just surprised at the errors as Thornycroft was a major boat builder and i did not expect to see the number of errors.anyway John is progressing nicely with the plans and i have finished the solid model including the twin tunnel hull. As you can see by the amount of filler it was a challenge to get it accurate. When i come to build the plank on frame finial model this is certainly going to be the greatest challenge.
Kevin
- mtaylor, hexnut, Mirabell61 and 4 others
-
7
-
- Moab, mtaylor, GrandpaPhil and 5 others
-
8
-
-
- yvesvidal, Ryland Craze, mtaylor and 7 others
-
10
-
-
- hexnut, mtaylor, Haliburton and 9 others
-
12
-
The plans are being drawn up by an architect friend John Otway at 1/4” scale. The photographs that i have posted before were from a first draft of the project. We had lots of problem trying to get the sections to line up. It was incredible that on the same sheet of paper there were major discrepancies . We had the same problem with the sections. It was then i decided to build two models. By building the first we would be able to figure the problems. Building a solid block model using auto body filler i could easily fill in and build up the hull to compensate for the errors. The tunnel hull was extremely complex. Also when we reduced the size of the plans it did not match the overall dimensions shown in the written specifications.
- mtaylor, thibaultron, G.L. and 1 other
-
4
-
-
-
-
-
I am actually going to build two models. The first is a solid hull while the second is a plank on frame.
- tarbrush, thibaultron and mtaylor
-
3
-
General History
The vessel was ordered by the Crown Agents in Trinidad which operated the Trinidad Government Railway. She was designed in 1904 and built by J I Thornycroft and Co. Ltd. of Chiswick. The construction was under the inspection of Sir Edward Reed. She was launched on the 7th March 1905. She was purchased to run from end of the railroad at San Fernando down to Cedros, a journey of some 40 miles. Further details can be read in Glen Beadons notes included in the appendix on page 23 of this report.
She left London on the 19th May 1905 arriving in Barbados on the 16th June and motored on to Port of Spain Trinidad the following day arriving at 2.00pm, some 28 days after leaving England.
There are a number of advertisements placed in the newspaper over her life showing that she traveled to Tobago on occasion particularly during holiday periods such as Easter and Christmas. This means that over time she took on an expanded role by becoming a true coastal steamer for both islands instead of simply an extension to the railroad service from San Fernando to Cedros. The photograph above no.7 shows the remanence of the jetty at Cedros the most southerly point of her route.
The ship was designed to accommodate 40 first class passengers on a promenade deck which also offered a refreshment department and dining room. The kitchen was on the main deck connecting to the promenade deck by a lift. The main deck catered to 100 second class passengers.
Details of the ship.
Length 140 '
Width 21'
Depth 6'
Freight 42 tons.
We were able to find a reference at the National Maritime Museum in Greenwich in box No. THY B0137 No. 367 which contains the original plans for the coastal steamer. They have been very helpful in the past in providing copies of a number of the ships that are part of the history of Trinidad and Tobago. There are 7 plans which are available for purchase. The cost of the plans is £370 as such we will only purchase these just before starting the build project.
"We do charge for the digitization of our ship plans which for private use is £70 for the first plan and then £50 per subsequent plan placed in the same order. This process takes 2-3 weeks to complete and we supply exact scale 300 dpi jpegs via ftp link via email. The total cost therefore with all the ship plans below would come to £370 +VAT (if applicable)."
In the past I have purchased plans from various sources only to find that they provided me with no additional information. I decided to take the plunge and order all the plans
Naparima by Kevin Kenny - FINISHED
in - Build logs for subjects built 1901 - Present Day
Posted