Jump to content

rafine

Gone, but not forgotten
  • Posts

    2,932
  • Joined

  • Last visited

Posts posted by rafine

  1. Thanks so much Tom for the comments and the "likes". I appreciate your appreciation.

     

    Fred, I cut my bow margin planks from sheet. I tried edge bending, but got lumps and bumps. At least with the cedar, grain was not an issue from an appearance standpoint. In addition. after the focs'l  framing and decking is in place, it will hardly be noticeable.

     

    BTW, I'm now working on Chapter five and will be posting soon.

     

    Bob

     

     

  2. Thanks so much Glenn, Matt, Derek and the "likes".

     

    My methods and sequence are what I have come to be comfortable with over a long period of time. I don't claim them to be the best or only way to do things and I know from discussions on this site and elsewhere  that there are others who disagree, particularly  about rigging from the mizzen forward. My only concern is with the best methods for me. If they work for others, all the better. Like you, I learned the hard way that it is easier for me to rig shrouds and stays before upper mast sections are in place.

     

    Bob

  3. I have now begun work on the masting and rigging. The first work was to construct and mount the lower masts. This involved shaping the mast heads, adding the cheeks, making up and mounting  the platform assemblies, doing the wooldings, adding  deadeyes and blocks, and mounting the completed assemblies. Blocks attached to the head will not be done until after the lower shrouds and stays are in place. Over the years, I have settled on my own sequence of steps in the rigging process. I will proceed by doing the lower shrouds and stays before constructing and mounting the upper mast sections. The rigging will go from the mizzen forward to maximize access.

     

    Bob

    fullsizeoutput_b67.jpeg

    fullsizeoutput_b68.jpeg

    fullsizeoutput_b69.jpeg

    fullsizeoutput_b6a.jpeg

    fullsizeoutput_b6b.jpeg

    fullsizeoutput_b6c.jpeg

    fullsizeoutput_b6d.jpeg

    fullsizeoutput_b6e.jpeg

  4. I've now completed work on the hull. This include the quarter deck and aft rails, the quarterdeck ladders,  the bow timberheads and completion of work on the head. The head is always fussy work, even if the parts are well designed and made, and I found this one no exception. The surprise to me was the difficulty that I encountered with the aft rails  Perhaps due to my own clumsiness, they proved to be quite fragile and hard to fit into the mortises. My other problem was entirely of my own making. When I had done the quarterdeck bulkhead, I had added finishing pieces at the end of the deck, without looking ahead and realizing that there were pieces that formed the base of the quarterdeck rail. Without the mortises in the laser cut pieces, I had to pin the rail supports in place.

     

    Now it's on to masting and rigging.

     

    Bob

     

    fullsizeoutput_b5f.jpeg

    fullsizeoutput_b60.jpeg

    fullsizeoutput_b61.jpeg

    fullsizeoutput_b62.jpeg

    fullsizeoutput_b36.jpeg

    fullsizeoutput_b63.jpeg

    fullsizeoutput_b64.jpeg

    fullsizeoutput_b65.jpeg

    fullsizeoutput_b66.jpeg

  5. Thanks so much Derek, Bob and the "likes".

     

    I've now completed the main deck furniture and fittings. These included the hatch coamings and gratings; the galley chimney; the main bitts; the gallows; the windlass and belfry; the pumps; the bowsprit bitts and the guns. This work was quite straight forward, using the excellent laser cut and PE parts. The guns presented the only issue-- whether or not to rig them . After experimenting with the tackle, I chose to go with breech ropes only.

     

    Now it's on to finish the remaining hull items, including the head, which I continue to put off.

     

    Bob

    fullsizeoutput_b56.jpeg

    fullsizeoutput_b55.jpeg

    fullsizeoutput_b57.jpeg

    fullsizeoutput_b58.jpeg

    fullsizeoutput_b59.jpeg

    fullsizeoutput_b5a.jpeg

    J66jY9b2Sqei5isuGm6xOg.jpg

    fullsizeoutput_b5b.jpeg

    fullsizeoutput_b5c.jpeg

    fullsizeoutput_b5d.jpeg

    fullsizeoutput_b5e.jpeg

  6. Thanks so much Rusty, OC, Glenn, Ron and Matt for the generous comments and thanks also to the "likes.

     

    Rusty, I'm going to do the breach ropes for sure. The tackle are now a 50-50 proposition.

     

    Ron, trust me that when you get old, some things just get harder to do. I'm just very grateful that I can still do them.

     

    Matt, i'm still pleasantly surprised each time I get to a new part, to see just how well done this kit is.

     

    Bob








    ".

  7. Thanks so much OC and the "likes".

     

    A lot of different items have now been done. They include: the rudder, tiller and tiller housing; the wheel and the rigging for the wheel and tiller; the binnacle; the curved stairway and the railing and coaming for it; deck eyebolts and ringbolts on quarter deck and main deck; the mizzen bitts and belaying pins; quarterdeck timberheads; bulwark eyebolts, staghorns and cleats and drilled holes  for the bulwark ringbolts for the breach ropes.

     

    A few comments on this work: 

     

    The blocks for the tiller and wheel rigging are really small. I wasn't sure how my aged hands and eyes would do with them, but it turned out well enough to get me thinking about gun tackle rigging again.

     

    I pinned the binnacle to the deck because it just seemed so fragile.

     

    The ringbolts for the breach ropes won't be fitted until the cannon are in place.

     

    Bob

    fullsizeoutput_b4b.jpeg

    fullsizeoutput_b4a.jpeg

    fullsizeoutput_b4c.jpeg

    fullsizeoutput_b4d.jpeg

    fullsizeoutput_b4e.jpeg

    fullsizeoutput_b4f.jpeg

    fullsizeoutput_b50.jpeg

    IMG_0683.jpg

    fullsizeoutput_b48.jpeg

    fullsizeoutput_b52.jpeg

    fullsizeoutput_b54.jpeg

  8. The following have now been completed: 1) painting and installation of the PE decoration on the hull; 2) painting, glazing and installation of the quarter galleries; 3) installation of the channels; 4) installation of the hull steps.

     

    The gold paint that I have used is an antique or old gold and is not as bright as others have used. I prefer a subdued look, but I can understand how others  prefer the "pop" of a brighter gold. Although I am intrigued by use of floor polish to attach the PE, I chose to use a method that I have used before. I used the same Micro Krystal Klear that I use for glazing as an adhesive to attach the PE. It is very easy to  use and leaves no visible  residue. I completed the process by applying a coat of Wipe-on Poly over the entire area.

     

    On the quarter galleries, I again used blue, rather than red, as the background color.

     

    I have also begun work on the head, but will leave that for the next update.

     

    Bob

    IMG_0671.JPG

    fullsizeoutput_b45.jpeg

    fullsizeoutput_b46.jpeg

    fullsizeoutput_b47.jpeg

×
×
  • Create New...