Woodwork/Model making workshop. Scale 1:1


Charter33

Recommended Posts

  • 4 weeks later...

At last the weather has changed and the forcast is for a several consecutive dry days. I can finally remove the tarpaulin and polythene sheets, which have often appeared more like sagging water balloons recently, and work on making the roof waterproof.

I reversed my original plan and worked on the more straightforward sections first before attempting the more challenging one adjacent to the garage wall.

A bit of advanced planning to find the optimum way to cut the six 8' x 4' 18mm to minimize waste resulted in less than half a square metre of ofcuts.

20230810_130431.thumb.jpg.c419cfcd8ed782aeebc2e3544c8c1bbe.jpg

Not pretty but it does the job. Now for the fun part....

IMG-20230811-WA0008.jpg.8c26a752b0ccf4b0e631543891c34965.jpg

Relying heavily on the three 'Ls', leverage, lateral thinking and luck, the the final panel was constructed on the roof and dropped into place. I took steps to ensure the whole assembly couldn't fall down the narrow gap between garage and workshop wall. At about 16' long and a couple of feet wide it was quite weighty! After marking the end profiles it was pulled back out and trimmed ready for covering.

20230810_130406.thumb.jpg.a372ad604c2a393c7a14979856d0b93e.jpg

First a layer of breathable membrane, then one of bitumen felt underlay. Next the detail trim was tacked into place followed by one course of bitumen shingles. I could have added a second but found that they would be accessible for nailing when the section was in place so dropped the idea as the already weighty panel was even heavier now.

20230811_165851.thumb.jpg.3936e455710a5a04b2d6ba350db544dd.jpg

With much care and trepidation the section was eased across to its balance point and then nudged over while being supported by a loop of rope. The plan worked! Next I had the Admiral maning a 4' length of 2" x 4" on the inside to lever the panel up to fine tune the fit while I screwed it to the top of the roof frames. Membrane and underlay sheets that had been left unattached were now fixed down. 20230811_190920.thumb.jpg.085b186b8f69d57be6269325d4a36511.jpg

Job done. The plan for tomorrow is to complete these two layers across the whole roof making it watertight. The shingles won't be added until the six roof lights are in place. These will be the next challenge 😉

Cheers,

Graham.

Link to comment
Share on other sites

  • 2 months later...

Having achieved a water-tight roof covering 

20230813_143430.thumb.jpg.49b857ba682e70de8d5617fe3b8b553f.jpg

it's time to start cutting holes through it!

Took the best part of the day, but the six roof lights are now in place....

20231011_105127.thumb.jpg.35fb3d5e7847af75c38285bffdb10a0d.jpg

Here are a couple of 'before' pictures.....

20231009_124246.thumb.jpg.77eb4addb6cecaa9486028344635afdd.jpg

20231009_124223.thumb.jpg.76051d61654c2920bf28c7996148c982.jpg

The camera has compensated in the second image and lightened it. In reality it was as dark as the previous picture.

And 'after'.....

20231011_114807.thumb.jpg.1b09c12ab9fc236943dca44a0d6d1a01.jpg

20231011_114752.thumb.jpg.aec7d21ccdbced05a05b14c9f3c65bb4.jpg

All units are double glazed with the right-hand middle one opening for additional ventilation.

Time now to complete the roof by adding the bitumen shingles.

Progress 🙂

Link to comment
Share on other sites

  • 2 weeks later...

That's the plan! 😄

Storm 'Babet' has halted work on the roof shingles for a few days but I'm aiming to complete the last couple of rows and the top ridge tomorrow.

In the meantime I'm working on the recess surrounding the porthole.

20231020_115227.thumb.jpg.8bbf1c14f4d4250149c74dcb22b308ec.jpg

Card template made,

20231020_142727.thumb.jpg.7706fbf4961686cf3952e95288ce0187.jpg

After adjusting the amount it projects out of the wall the template was cut to suit the available material, an offcut of aluminium sheet.

20231021_094034.thumb.jpg.ca48c6277933b2ca5c95399b064fa294.jpg

I'll add more pictures once these have been cut out and shaped.... 

Cheers,

Graham

 

 

Link to comment
Share on other sites

Bitumen shingles in place. The sun was setting as the top ridge was fitted so sealing with a heat gun and finishing edges with felt adhesive will have to wait until tomorrow...

20231022_174045.thumb.jpg.bdea4fad3e3051827e4f9f5354802da8.jpg

Top ridge was completed using offcuts of shingles and 'detail strip' minimizing waste. The roof has stood up to some exceptionally wet weather this week without any leaks which is encouraging. I'm going to neaten up the gable ends with facia boards, and apart from adding some guttering, and the porthole lining, the outside is pretty much finished.

Cheers,

Graham.

 

Link to comment
Share on other sites

The roof shingles are now all sealed.

This is my neighbour's view of the build, a better one then I have!

20231024_133012.thumb.jpg.7bc7827ba534ebec87deeaa669dd9985.jpg

The aluminium porthole lining panels have been cut to size, 'engine turned'

20231027_150124.thumb.jpg.bdfe99cd923dee98cac74f16e94db92f.jpg

and rolled to profile.

20231027_151729.thumb.jpg.b38d02ab89f058931c746828ec9a1cd1.jpg

These panels have had a preliminary fixing and my next job is to remove them and then re-fit with additional sealant.

20231027_154415.thumb.jpg.d786cdb893214dc95e3527c3bf298c74.jpg

The barge board/ fascia board has also been completed on this gable end using the spare length of wall cladding I had left over.  

20231027_155422.thumb.jpg.eb606678940f8f0c709b5c8685394b07.jpg

20231027_155535.thumb.jpg.47a85ecdff1de9d44129a4af697b1863.jpg

Once the front gable end has been finished I can start working on the interior beginning with the floor.

Progress!

Cheers,

Graham.

Link to comment
Share on other sites

Nicely done. I really like the finish on your porthole liner. 👍

Ken

Started: MS Bounty Longboat,

On Hold:  Heinkel USS Choctaw paper

Down the road: Shipyard HMC Alert 1/96 paper, Mamoli Constitution Cross, MS USN Picket Boat #1

Scratchbuild: Echo Cross Section

 

Member Nautical Research Guild

Link to comment
Share on other sites

Thanks Canute. The ali sheet has been stored for a few years and needed something to hide all the dings and scratches. I used to use valve grinding paste and a piece of wooden dowel for this, but this time lashed up a tool using a dremel mandril, a 22 mm dia. disc of 4 mm thick softwood with the central hole recessed for the screw head, double sided tape and circles of abrasive Scotch Bright pad. The porthole faces north west and this finish catches the setting sun nicely on a good day.

Cheers,

Graham

Link to comment
Share on other sites

  • 3 months later...

With the worst of the winter weather behind us, and a bit of financial jugging, work on the workshop is underway again. Just taken delivery of the tongue and groove softwood flooring. Six bundles, fortunately well wrapped against damage and the rain, manhandled through the house and into the garden.

20240208_114417.thumb.jpg.2845b8fd6fc063af1c344fd9ed6a378a.jpg

The workshop can just be seen through the arch.

This is a slightly clearer view, the best that it can be seen from the house, and benefitting from the jasmine over the wooden arch having had it's annual trim. Another soggy day!

20240208_114501.thumb.jpg.e741f5fe32ac08c37ea6c21c192db803.jpg

The final addition to the exterior, the white gable end, is just visible.

The boards are now unwrapped and stacked inside to adjust to the humidity etc. for a few days before laying starts.

20240210_151411.thumb.jpg.32d93ca28df0910e4b4da804bca6be47.jpg

Another opportunity to add to the nautical aesthetic of the build perhaps.....we'll see! 😄

Cheers,

Graham.

Link to comment
Share on other sites

Wow - thanks for all those 'likes', very much appreciated.

To be honest, Javlin, air conditioning hadn't occurred to me. Here in the UK it's not something that's usually found in domestic settings but I'll do a bit of research into it. Thanks for the suggestion. Once the flooring is down and sealed I'll be putting in insulation to help with heat retention and sound issues. At the same time the first fix for the electrics will be done. I was thinking of using an oil filled portable electric radiator that I have currently in storage for residual background heat. A good friend uses one of those diesel oil cab heaters for his workshop, but that's not really what I want. Did consider a small wood burning stove but decided it would be impractical. The building is tucked away and pretty much out of direct sunlight so I think using natural flow ventilation, from the french doors, porthole window and opening roof light will cope on hot sunny days.....🥵😄

Link to comment
Share on other sites

Climate control is not as much for you as it is for your tools and equipment.  High humidity and condensation can rust tools overnight.  It is, therefore, wise to provide some means of controlling humidity even when you are not present in your shop.  It is also a good idea to put down a plastic film vapor barrier on the concrete before laying down the wooden floor.

 

Roger

Link to comment
Share on other sites

Totally agree Rodger, and tool protection is very high on my prority list. I'll be looking to fit a de-humidifier in there, especially after seeing what happened to one of my friends last year when a freak temperature swing of over 12 degrees one night made his pre-fab concrete workshop look like it had rained inside. He was mopping up pools of water and had to spend days dealing with surface rust on tools and equipment.

I started preping the floor area yesterday and this included laying a vapour barrier on top of the OSB sub- floor base. The softwood boards have had nearly a week to acclimatise, so I plan to escape to the bottom of the garden later and begin fitting them......

Cheers,

Graham

Link to comment
Share on other sites

You know, the ceiling joists kinda make it look like a ships' framing😉

I love the porthole window as well.

Excellent design features, really look forward to seeing it develop and finish off 😎

I did a porthole window in the door of my  house attached workshop...now taken over as the dog's room😒

 

IMG_1736.jpg

Scott 

Current Build:
1/72 Zvezda The Black Pearl 

Link to comment
Share on other sites

Installing the floorboards started with a plan, much used throughout the build, and now well worn....

20240218_104044.thumb.jpg.1d4d0543d725a90984be0c25c756b024.jpg

In keeping with the nautical flavour there was only one method guiding the laying, the four step butt planking pattern.

Once a board was cut to an appropriate length fixing holes were pre-drilled with a 12 mm spade bit and each piece secured to the sub-floor. 

20240217_121738.thumb.jpg.5a1412f023f18c2125427c3d0890b56d.jpg

A 1/2" plug cutter was used to convert offcuts of boards into covers for the screws.

20240217_114308.thumb.jpg.b736484ec0dd0c5b8e70debc8fb89892.jpg

Mixing metric and imperial tools in this way resulted in a nice tight fit. Once these plugs had been glued in place a sharp chisel made quick work of getting them level and flat.

20240218_103717.thumb.jpg.4f717077f7dd101786f39763e37576f3.jpg

The floor after sanding -

20240218_153020.thumb.jpg.cffa06fb73b68f90e7f25e99abdf9629.jpg

No, not quite treenails, but visible at this scale?

20240218_162917.thumb.jpg.7e116436c809bdcfea3d84b5e86db39d.jpg

Oh yes, but nice and subtle.....

The first coat of finish has been applied,

20240218_162929.thumb.jpg.4b6317d2189eb74b3584c64bbbe22322.jpg

the second and final coat will go on tomorrow evening after a light sanding.

Cheers,

Graham

 

Link to comment
Share on other sites

There are quite enough gun ports and gun muzzles on a model of Victory to last a lifetime, without adding more to the workshop itself, Ron 🤣

....but the Admiral's input to the build was a request for a weather vane above the door, and you've now planted the seed of an idea..... and I love a challenge!

Link to comment
Share on other sites

I think it's a Model making workshop..😁

“Indecision may or may not be my problem.”
― Jimmy Buffett

Current builds:    Rattlesnake (Scratch From MS Plans 

On Hold:  HMS Resolution ( AKA Ferrett )

In the Gallery: Yacht Mary,  Gretel, French Cannon

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...