Jump to content

rafine

Gone, but not forgotten
  • Posts

    2,932
  • Joined

  • Last visited

Posts posted by rafine

  1. I've now made, mounted and rigged the fore topgallant/royal mast. This included the topgallant shrouds, stay and backstay and the royal stay and backstay. Also added the main royal stay and backstay.This completes the standing rigging, with the exception of the ratlines, which will be done next (always save the best for last 😀).

     

    Bob

    fullsizeoutput_8c0.jpeg

    fullsizeoutput_8b9.jpeg

    fullsizeoutput_8ba.jpeg

    fullsizeoutput_8bc.jpeg

    fullsizeoutput_8bd.jpeg

    fullsizeoutput_8be.jpeg

  2. I've now made up, mounted and rigged the fore top mast.This included the shrouds, two stays and a backstay.The topmast stay runs through a bee block at the bowsprit and then to a tackle hooked to the bow.The jib stay runs through  a traveler at the jibboom and then to a tackle hooked to the bowsprit cap.

     

    Next will be the fore topgallant and royal mast.

     

    Bob

    fullsizeoutput_8b2.jpeg

    fullsizeoutput_8b4.jpeg

    fullsizeoutput_8ae.jpeg

    fullsizeoutput_8b0.jpeg

    fullsizeoutput_8b1.jpeg

    fullsizeoutput_8b6.jpeg

  3. I've now done first rigging on the lower main mast. This included the burton pendants and shrouds and the main stay.  Before doing these, I added cleats and eyebolts to the masthead and trestletree-crosstree assembly, as shown on the Smithsonian drawings.

     

    After finishing the shrouds, I added sheer poles.The stay is double and set up to tackles that are hooked to deck eyebolts forward of the fore mast. Lastly, I lashed blocks for the boom topping lifts and the gaff peak halyard to the mast head.

     

    Next, I will repeat this process for the lower fore mast.

     

    Bob

    fullsizeoutput_891.jpeg

    fullsizeoutput_88d.jpeg

    fullsizeoutput_88f.jpeg

    fullsizeoutput_88e.jpeg

    fullsizeoutput_892.jpeg

  4. Finally, something new to report. After getting the rigging plans and data, I decided to start with the bowsprit assembly and rigging. This really wouldn't have been my usual order of doing things, but I just felt like doing it.

     

    I began by making the bowsprit, jibboom and flying jibboom, the spritsail yard, the cap and the dolphin striker. I assembled these after shaping and filing shoulders, where needed, and painting the appropriate areas black. Before mounting, I added cleats and eyebolts as shown, and then added the deadeyes for the bobstay, shrouds and forestay and blocks for the spritsail yard braces and lifts. I then mounted the assembly.

     

    I began the rigging with the gammoning and then did the bobstay and shrouds. After those, I did the martingales and guys.The martingales reeve through hoes in the the dolphin striker, then through eyebolts on the bowsprit, then through fairleads at the bow and to the bow pinrail. The guys lead through eyebolts on the spritsail yard  and then to tackles hooked to eyebolts on the forward side of the catheads. I also added the spritsail yard lifts, which also run back to the forward pinrail. There is still considerable rigging left to do in this area when the various stays are run from the foremast.

     

    Bob

     

     

    fullsizeoutput_87a.jpeg

    fullsizeoutput_87c.jpeg

    fullsizeoutput_884.jpeg

    fullsizeoutput_886.jpeg

    fullsizeoutput_887.jpeg

×
×
  • Create New...