Jump to content
MORE HANDBOOKS ARE ON THEIR WAY! We will let you know when they get here. ×

mtbediz

Members
  • Posts

    1,259
  • Joined

  • Last visited

Everything posted by mtbediz

  1. I have finished working on the head for now. I made and installed the grating, seats and the other details.
  2. Thank you so much Bob. Your Essex built log is helping me a lot. Thank you again.
  3. The main rail and lower rail have been completed at the head.
  4. Thank you so much. The hull is 710 mm stem to stern.
  5. I continued with the forecastle planking and cap rails. Forecastle has been covered partially like quarter deck and waist deck,
  6. I added a grate and completed minimal planking of the waist deck.
  7. The waist deck requires support stancions. I made a simple jig which helped me to produce stancions.
  8. I have made the waist deck but not glued in place yet. This part of the decking required support stanchions which will be made next.
  9. I have made and installed the quarterdeck pin rails.
  10. I made up the quarterdeck bulwark ringbolts and eyebolts. I also made up cleats. I then drilled the bulwarks and transom for all of them and installed them. I then made two transom knees and installed them.
  11. Quarter deckplanking and internal planking of the bulwarks have been completed. To leave visible the details on the gun deck, I covered the quarter deck partially.
  12. Quarter deck is still in progress. One of the three capstans and the chain pumps are in place.
  13. I have completed the rigging of the guns on the gun deck and started the quarter deck frames.
×
×
  • Create New...