Jump to content

Tobias

Members
  • Posts

    195
  • Joined

  • Last visited

Posts posted by Tobias

  1. Thank you for your comments and the likes received, always much appreciated.
     

    The waterway has been made and the first planks have found their place on the deck. As Mark already mentioned in his build log, this is a bit tricky because they are twisted and have changing angles. Make decorative strips, measure the height and mark them with the help of tape.

     

    eZyWatermark_09-04-2024_07-28-39-6590PM.thumb.jpeg.86f6ed851c66167eb15f245618dcf3a9.jpeg

     

    eZyWatermark_03-04-2024_09-19-23-5800PM.thumb.jpeg.a5e02efb83e94406f218908332920841.jpeg

     

    eZyWatermark_14-04-2024_12-56-35-8940PM.thumb.jpeg.393a02a9bd2c7b8493ba37e7914a6ee6.jpeg

     

    eZyWatermark_14-04-2024_12-55-45-7260PM.thumb.jpeg.a1b8bf27ca3556edfb3c41a58232b65d.jpeg

     

    eZyWatermark_03-04-2024_04-41-33-4740PM.thumb.jpeg.6c22bfef872cf4679acae0a4e4aa8847.jpeg

     

    eZyWatermark_03-04-2024_04-42-29-2500PM.thumb.jpeg.5fe55739a035031892f69b0e6efdfdbd.jpeg

     

    eZyWatermark_03-04-2024_04-45-58-8540PM.thumb.jpeg.059dff9f96bf2d7be53affb92046269d.jpeg

    Thank you for your visit and see you soon.

  2. Hello Chuck @Chuck, thank you for your comment, much appreciated. I am following your construction of the Speedwell with great interest, as I plan to start it after Le Rochefort and La Palme. I bought the books almost two years ago and have already enlarged the plans to 1:36.

    eZyWatermark_26-06-2022_10-54-31PM.thumb.jpeg.5dd9c0b622b33f8d0eddb0bd37fe9289.jpeg

     

     

    @giampieroricciRicci, thank you too for your comment, it is always a pleasure when you stop by my blog, see you in October in Evina.

  3. 9 hours ago, No Idea said:

    Nice Job Tobias they are tricky parts to make.

    Good morning Mark @No Idea, thank you. Yes, the side pieces are awful. The first time I tried Adrian's method, but I failed. Then I remembered your report and tried this, it was much better, but still not satisfactory. Somehow I can't draw well enough to get the same effect. So I went back to the method I tried with the small side pieces on La Palm. First cut out the curved shape and then the side profile. It worked very well.

  4. Hello everyone,

    I've been back on my little harbor yacht for almost 14 days. The plan is to work on Le Rochefort until August. I have completed all of the deck beams and will now install and adjust them piece by piece. At the moment I'm busy with the metal work on the pump house and the pumps themselves and will show another update soon.

     

    eZyWatermark_22-02-2024_06-58-24-0210PM.thumb.jpeg.9fc621e3ad80fcbf71bc5f50d907da4d.jpeg

     

    eZyWatermark_03-03-2024_04-30-06-2170PM.thumb.jpeg.5452438f7d7ea342564bd262763a05b1.jpeg

     

    eZyWatermark_03-03-2024_05-18-26-8490PM.thumb.jpeg.79b09d5e56e361621a06f6f0bb81f605.jpeg

     

    eZyWatermark_03-03-2024_09-14-18-2150PM.thumb.jpeg.341e0b5f0e1eb2faf5905c9bd57be4a2.jpeg

    eZyWatermark_03-03-2024_09-03-54-5280PM.thumb.jpeg.8b8263e4a96d1b6e43a6d538b2999b3b.jpeg

  5. On 11/6/2023 at 4:18 AM, bdgiantman2 said:

    Very realistic blocks you have made for adjusting the tilt of the mast, a detail rarely seen on many models. Great progress, sir!

     

    Brian D :)

    Hello Brain, thank you. There were 7 small elements in total, to be able to drill them accurately I glued 3 pieces and 4 pieces together and then finished the edges with a file.

  6. On 11/4/2023 at 6:14 PM, No Idea said:

    Very nice work Tobias :)  I found that getting the beams to sit in the perfect position quite time consuming but worth it to save loads of sanding to bring the deck fair.  I love the dovetail joints - top job 👍

    Hello Mark, thank you. You are absolutely right, it was a very time-consuming job, especially constantly taking beams out and back in and out again and so on.
     

    On 11/4/2023 at 12:15 PM, druxey said:

    Nice progress, Tobias. That internal work is not easy to do. Well done! 

    Thank you Durex for your interest and your comment.
     

    Thanks to everyone else for your likes.

    A few more pictures of the finished interior after I treated it with Clou sanding primer.

     

    eZyWatermark_05-11-2023_02-31-17-4440PM.thumb.jpeg.4236c5abb4c07fcad1238bb9a940bdbd.jpeg

     

    eZyWatermark_05-11-2023_02-33-42-4670PM.thumb.jpeg.a7d743758fb7116cccfed02a5021f148.jpeg

     

    eZyWatermark_05-11-2023_05-22-04-6510PM.thumb.jpeg.b00f8d947c9e9bb38116232fa9c9c773.jpeg

     

    eZyWatermark_05-11-2023_05-22-46-7820PM.thumb.jpeg.c48ceb19b1f7a52bc6a0e8fd38a93e01.jpeg

     

    IMG_7188.thumb.jpeg.ce64e4753c2ba6cde433bdf3fb309bf0.jpeg

     

    eZyWatermark_05-11-2023_05-23-29-8080PM.thumb.jpeg.e28554ecfc6252e8091907d02587ca97.jpeg

    eZyWatermark_05-11-2023_05-24-19-4380PM.thumb.jpeg.27060c3bea1b067722e617eedf84f30d.jpeg

     

     

  7. Hello everyone, after a tip from Gerard Delacroix, Le Rochefort did not have eyelets to remove the planks but holes to engage them, so this had to be changed.
     

    eZyWatermark_21-10-2023_11-06-09-7140PM.thumb.jpeg.a7efb78fdc582b6ac894a82863d25dec.jpeg
    In the next step, I made and fitted all the deck beams and the beam walkways. The rear bulkhead fitted. There is still some work to be done on the deck beams, which will happen in the next few days. For this work I would have liked to have Le Rochefort in 1:24 scale 😂.

    eZyWatermark_31-10-2023_03-22-05-9500PM.thumb.jpeg.09d8c3d9b7e7d079c23c1613bbfd178e.jpeg

     

    eZyWatermark_01-11-2023_11-04-55-4310AM.thumb.jpeg.058a6028fd5fde8e2eddbd3f59d3259a.jpeg

     

    eZyWatermark_01-11-2023_10-59-54-0710AM.thumb.jpeg.7bc27299b69f0bc500cf71f46d675b5d.jpeg

     

    eZyWatermark_03-11-2023_12-49-53-8560PM.thumb.jpeg.6000abf1d670f1cfa3ea998ea67679b9.jpeg

     

    eZyWatermark_03-11-2023_12-51-12-1650PM.thumb.jpeg.538e0c98cb32e63708e569173e8b314c.jpeg

  8. Hi all,

    thanks for your interest and likes, much appreciated.

     

    Over the last few days I have been able to get a bit further with the interior. Making the front bulkhead, the hold floor and the front false floor.  According to the monograph, the middle 4 (2) rows are not nailed to be able to remove them to access the limber boards underneath. Here I have provided them with small ring eyelets, I hope this is correct, as I could not find anything in the monograph.

     

    eZyWatermark_12-10-2023_10-04-30-6690AM.thumb.jpeg.f06b63adf258ec2d15197a5cecf89fc4.jpeg

     

    eZyWatermark_12-10-2023_10-01-48-8780AM.thumb.jpeg.d5600cd67b85734d679992ee0303e883.jpeg

     

    eZyWatermark_19-10-2023_08-57-51-0390PM.thumb.jpeg.461684af3f0e60b56c89c7c3d0d7d52d.jpeg

     

    eZyWatermark_19-10-2023_08-56-56-3280PM.thumb.jpeg.f1bc43b1390cb634ebad3cca358a2856.jpeg

     

    eZyWatermark_19-10-2023_09-00-11-4270PM.thumb.jpeg.affffbb1f17c7b164c4733ea92d7462a.jpeg

     

    eZyWatermark_19-10-2023_08-58-42-5830PM.thumb.jpeg.b0d08dce74092b29497af35ffdb26003.jpeg

     

     

  9. Hello everyone, another update on Le Rochefort. After the small break in the summer, I'm more drawn to the workshop again in the evenings. I have started with the cross beams for the cargo area and the nails for the interior floorboards. I'm still waiting for my new tools to finish the rest of the nails.
     

    eZyWatermark_24-09-2023_07-43-07-7870PM.thumb.jpeg.bd1d8ad4f54146ab63dc1e4aa2b3bf92.jpeg

    eZyWatermark_24-09-2023_09-21-03-2670PM.thumb.jpeg.88ddbdb83073eaea5d51f0cc24a78757.jpeg

    eZyWatermark_26-09-2023_07-36-54-2300PM.thumb.jpeg.90cb230c01996ed34c306611004853b2.jpeg

    eZyWatermark_26-09-2023_10-50-06-8400PM.thumb.jpeg.262976fbab1ea8e3f0de40faba91bab2.jpeg

     

×
×
  • Create New...