Jump to content
MORE HANDBOOKS ARE ON THEIR WAY! We will let you know when they get here. ×

Kevin

MSW Social Media Moderator
  • Posts

    7,006
  • Joined

  • Last visited

Everything posted by Kevin

  1. Good morning everyone, worked late last night, sorting the wiring out, the power supply connections are now in position, each connection brings another ray of light into the build, hopefully today, subject to DIY projects the top section will be powered up at the same time as the hull for the first time
  2. thats a novel and brilliant idea to use the outside section of the frames, for the deck support
  3. good morning everyone getting the hull ready to accept the superstructure, prop shaft and rudder fitted but they are removable, in case someone else takes the hull in the future and wants to make her water tight, they will also have to fill another couple of holes as the power supply connectors are going to be fitted into the hull just under the bilge keel, this will be the same side as the dock side when in its diorama, most likely port side to, that way no wires will be seen
  4. 2 kits for the price of one, and no one outside MSW will know thew difference,
  5. bulk load the phot as you have been doing, they will auto load when you post, but in the drop box you can select each photo and insert or delete one at a time to place directly into the post
  6. the hull has come up a treat, whats the rest of the wood like after 30 plus years like?
  7. good evening everyone its been a strange few months, i thought that being retired, life would be great, and it is, but obvious things outside my garden are not, But after a couple of weeks feeling quite low/fed up, i have pulled myself back together and the St Nectan continues i have gone back to the superstructure now and have sorted the bridge wings, and today most of the lighting has been commissioned, all working for the first time, i will work on no flash photos in the next few days, i have a remote built in that will control the brightness, navigation lights will have there own power supply
  8. just read your log from the start, lovely work, and an enjoyable couple of hours, thank you
  9. good evening everyone starting from the front i am now working aft to ensure everything is where it should be, but not necessarily complete, taking her outside has allowed me to look for some missing bits and to clean her off again i never did find the otter board hinges, so make some glazing of some of the windows using white pva glue steam winch mounting board is now pinned into position, the winch will be one of the last items to be fitted and the boat deck supports get a yellow coat, these will be cut to size when the superstructure get fixed on, as they sit on top of the capping rail
  10. glad you finished her, she looks great
  11. personally i would use white PVA and pin it in place, and as mark said the planking would cover the hole
  12. have a look through these logs, im sure you will find your answer open up the wooden kits file, which downloads in a PDF format, each entry for Lady Nelson will take you to the relevant build log
  13. oooooooo David, Coppering, lol we all love coppering your build looks fantastic, i might evern get to start another build this summer
  14. good evening everyone the waledeck is nearly complete apart from touch ups and weathering i added the chain stopper, but have no idea if it is correct or not, deck portholes are glazed with PVA glue, tomorrow i will tidy up the main deck and think about rigging
  15. Good evening everyone slowly the front end is looking like a, well, a front end, a very light weathering so far, not sure how far i will take that, railings and anchor capstan are secured, as well as the ladder, next the bollards, cleats, anchor and associated gear, and securing points for the stays will be hopefully in place by tomorrow night some of the remaing bits to be identified, cleaned up and a home on the build found for them
  16. actually they were one of the easiest bits of the build, the ladder handrails ( not fitted yet) took far longer
  17. Thank you Edward, although very much in the early days, and im not racing ahead with it, but the log is ni my signature list below
  18. Good morning everyone Waleback fitting out getting the pointy end over the finishing line, the railings are still to be trimmed to size, nothing is fitted yet, i may use this area as a dumping fround when in the diorama setting, boxes, bikes, ropes, lol my mind runs riot with ideas, actually doing it is a different thing altogether my next build will be the Talisman Paddle steamer in cutaway, having failed to do it on here as promised
  19. Wonderful build, and belated Happy Birthday
×
×
  • Create New...