Jump to content

HMS Sphinx 1775 by Glenn-UK - Vanguard Models - 1:64


Recommended Posts

HULL ASSEMBLY

FIRST PLANKING – SANDING

FITTING LOWER STERN, PROW, KEEL AND RUDDER POST PATTERNS

BUILD MANUAL STEPS 144 - 163

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Sandpaper 120-grit and 400-grit

Titebond original glue

Old paint brush

Clamps

 

Gathering the materials required

The following kit parts are required for this section of the build:

155, 187 (x8), 188, 189, 190, 191, 192, 193, 196, 272, 274, 445, 446, 447, Brass pins

 

Assembly Process – Sanding The Hull

I was reasonably happy with how the first planking turned out and did not take as much sanding as I was expecting. I started with 120- grit sandpaper. After about an hour the hull looked smooth.

 

001.thumb.JPG.d6e67a6694e5d3a35445ce791a97681a.JPG

 

I mixed some wood filler with water and titebond and applied the paste to a few areas and then once it had dried sanded the areas smooth. I completed the sanding process using 400-grit sandpaper.

 

The lower stern counter pattern had already been bent around a tin can. I applied glue and pined the lower counter in place. There is a couple of areas will be filled before the 2nd planking stage. Taking note of the build instructions I positioned the top edge stern counter pattern with the stern timber slots.

 

002.thumb.JPG.dcd6d4aae832d5691ea54744450b7ff9.JPG

 

The prow, keel and rudder post patterns were then glued in place.

 

003.thumb.JPG.0d933321076c0f75862be5a2c8193927.JPG

 

004.thumb.JPG.2e4ab3ba8c87d4280dedc5c615cd165d.JPG

 

005.thumb.JPG.54a20cf6f05e8237ccee9d8e665b2586.JPG

 

Once the glue had dried the outer patterns were fitted, using the location pegs to align each pattern. The outer patterns were clamped in place.

 

 

006.thumb.JPG.3bf39aa993808e2dd1d143eaf888593e.JPG

 

007.thumb.JPG.9d63fae950ac5802e7573b3522441a98.JPG

 

008.thumb.JPG.88d41cc3e38ca49bd4790fb6690c3a06.JPG

 

I then tried a test fit of the outer planking patterns and I was happy with how these parts looked.

 

009.thumb.JPG.a307939a84e14cb0c4d44ca316c56c52.JPG

 

010.thumb.JPG.b24d2ea859eaea11f04bb4815422e3c1.JPG

 

Finally fore outer planking patterns (272 & 274) were soaked in hot water for 30 minutes and then clamped to the hull. They will be left to dry overnight ready to be glued in place in the morning along with the aft outer planking patterns (271 and 273). I did contemplate soaking and clamping the lower fore outer patterns also but I decided that I was not going to rush this stage so this will be done once the upper patterns have been glued in place.

 

011.thumb.JPG.deb1cbbde20499be4864f651b13784dc.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

HULL PLANKING

OUTER PLANKING PATTERNS

BUILD MANUAL STEPS 164 - 181

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Titebond original glue

Gorilli super glue gel

Old paint brush

Clamps and tape

 

Gathering the materials required

The following kit parts are required for this section of the build:

76, 271, 272, 273, 274, 305, 306, 307, 308, 309 (x2), 310 (x2), 311 (x2), 312 (x2)

 

Assembly Process – Sanding The Hull

The fore upper planking patterns that had been clamped to the hull and left to dry overnight had retained the required shape.

 

001.thumb.JPG.4cb8b0aff10ad764e1a70df235ec7c32.JPG

 

As a guide I clamped the left-hand side aft upper planking pattern in position. I then applied some diluted Titebond glue to the hull, using an old paintbrush, ready for the fore upper planking pattern.

 

002.thumb.JPG.de3d6d34806e9ebe1fe754b5fe332a4b.JPG

 

The left-hand fore upper planking pattern was then positioned and clamped in place. Great care was taken to make sure everything was correctly aligned. The guidelines provided on the upper hull side pattern was a great help, another great feature of the kit design. The left-hand aft upper planking panel was also glued and clamped in place.

 

003.thumb.JPG.b045076d870c8a9bab065d49269e7a56.JPG

 

I waited for the glue to cure before repeating the process for the right-hand side upper planking patterns, due to a lack of clamps.

 

004.thumb.JPG.3749b09bb6947f8551d0c1dff02b1dcb.JPG

 

005.thumb.JPG.77270f552f907eb290a43be2becdf24c.JPG

 

The lower fore planking patterns were then soaked in hot water for 30 minutes and then clamped to the hull and left to dry for a minimum of 12 hours.

 

006.thumb.JPG.de13be50c8dca50703d65a8ee2f8add0.JPG

 

The lower planking patterns were glued in place. I noted a slight alignment issue with some of the gun port edges. This was soon corrected with a bit of trimming and sanding.

 

007.thumb.JPG.85147a3af0021d0419587cef5a304d3e.JPG

 

008.thumb.JPG.fd7322e75bf8fdf8d6887be8d4d0f4a1.JPG

 

The stern lower counter pattern was then added. I used Titebond for this.

 

009.thumb.JPG.cf322b372c53bc5c03938e9dde49e960.JPG

 

010.thumb.JPG.81e7c00f3f5fef6b201a43f5bdc20b38.JPG

 

The final task was to fit the two lower plank patterns to each side. I opted to use gorilla super glue gel.

 

011.thumb.JPG.ec52811151d727d79384fc4273cc584e.JPG

 

Despite being very careful I still managed to get more glue on my fingers than the planks. The hull is now ready for the 2nd planking stage.

 

012.thumb.JPG.9a0d916133172ce6040b4cc488bf7687.JPG

 

013.thumb.JPG.38ff3de60eaee024de5899a0ec63b283.JPG

 

014.thumb.JPG.67c95c7857179a488240f180ebace1c1.JPG

Glenn (UK)

Link to comment
Share on other sites

This post is not in my normal format, as it  not really covering a build stage.

 

After fitting the outer planking patterns I noticed a problem with the left-hand side stern where the patterns and stern counter meet. The shaped planking patterns should follow the  shape of the stern counter, as it does on the right-hand side of my model. However has can be seen in the photo below there is a gap,

 

001.thumb.JPG.6530a8a09da9806ebf1dba976062201f.JPG

 

I did consider leaving the gap until after the gallery had been fitted to see what I could do but in the end I decided to fit a small filler piece and can then take further action, if needed, later on in the build.

 

002.thumb.JPG.eca323a8d360f639474a032be32b8d0e.JPG

 

I have made a start with the 2nd planking I have add the first two top planks on the left-hand side. I have also fitted the garboard (2 planks wide). Given the majority of the 2nd planking will be covered with white paint I am not going to worry too much about the method I used to get the planks fitted.

 

003.thumb.JPG.c375653c06d86e71be8f77c20d2c90a7.JPG

 

004.thumb.JPG.698dc1934570dca2669aa9380dd9843e.JPG

Glenn (UK)

Link to comment
Share on other sites

HULL ASSEMBLY

2ND PLANKING STAGE 1

BUILD MANUAL STEP 182

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Craft knife

120 & 400-grit sandpaper

Gorilla super glue gel

Plank nipper

 

Gathering the materials required

The following kit parts are required for this section of the build:

Planking strips

 

Assembly Process

I have started planking both directions, i.e., from the keel upward and the planking patterns downward. I am happy with how the planks are looking. Unlike the tradition method of sanding and filling the completed plank hull I am tending to sand as I go along and using the sawdust to fill around the edges and joints. So far this seems to be working well, but time will tell if this was a good or bad idea. I am fully expecting the completed hull may need some extra filling and sanding before the painting phase.

 

The use of the gel ca glue is good and is proving to be a great way to complete this task. As per build instruction suggestion I am fitting the planks as two halves, except for the first two planks located below the planking patterns.

 

This shows the upper bow section. I will decide if I need to sort the gap between the upper planking patterns later on in the build as I think the rails, when fitted, will cover the gap.

001.thumb.JPG.267034bb27c72bd6211d9bc3eef98dc4.JPG

 

The garboard planks fitted

002.thumb.JPG.2d6971800aa78589aa914f777d5d8a97.JPG

 

The stern area. At the moment I am using a plank nipper to shape the planks which seems to be working very well at the moment. Once the sawdust filler solution has full dried the excess sawdust can be brushed away. I am hoping the gallery, when fitted, will help hide the infill

003.thumb.JPG.5198d1f4f03d4dd4fbd06af2ca1e5b44.JPG

 

A broadside view

004.thumb.JPG.628118f6c507ce8872731ac23383b5dd.JPG

Glenn (UK)

Link to comment
Share on other sites

1 hour ago, Jasseji said:

are you collecting the dust and mixing it with glue or how ?

@Jasseji I am using three very similar methods.

 

a) In the first instance, straight after the plank is glued in place, I will sand the joint line between the two planks. This will remove any excess ca gel and the sawdust can sometimes bind with any residual ga gel in the joint area to fill gaps.

 

b) For the plank edges with the stern counter, stern post and stem post I am sanding the planks in situ and then using an old paint brush which is dipped in diluted pva move the plank sawdust to the joint between the planks and posts where needed.

 

c) Where the plank joint has been made (i.e. when I have cut a plank in half and then fitted one half for the bow and the other half for the stern) I brush some diluted pva over the plank joint area and sand so any gaps get filled with the sawdust / pva mix. This is also will be used if there a small gap between adjacent planks.

 

I hope that explains what I am doing.

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

5 minutes ago, glennard2523 said:

@Jasseji I am using three very similar methods.

 

a) In the first instance, straight after the plank is glued in place, I will sand the joint line between the two planks. This will remove any excess ca gel and the sawdust can sometimes bind with any residual ga gel in the joint area to fill gaps.

 

b) For the plank edges with the stern counter, stern post and stem post I am sanding the planks in situ and then using an old paint brush which is dipped in diluted pva move the plank sawdust to the joint between the planks and posts where needed.

 

c) Where the plank joint has been made (i.e. when I have cut a plank in half and then fitted one half for the bow and the other half for the stern) I brush some diluted pva over the plank joint area and sand so any gaps get filled with the sawdust / pva mix. This is also will be used if there a small gap between adjacent planks.

 

I hope that explains what I am doing.

 

Right, i was using Method 3 for the 1st and 2nd planking on the LN, also mostly on the 1st Planking of the Sphinx (basically paint the Hull with diluted PVA before sanding so the mix gets into the gaps)

 

I was wondering if using Varnish would be better or worse than PVA ?

Jacek

 

Current Build: HMS Sphinx 1775 - Vanguard Models 1/64 

On Hold/Parallel: Lady Nelson - Amati/Victory Models 1/64

 

 

Link to comment
Share on other sites

10 minutes ago, Jasseji said:

I was wondering if using Varnish would be better or worse than PVA ?

I have just experimented to find what works best for me. This is the first time I have tried to sand the hull as plank. So far it seems to be working as I can focus my attention to a small area. Once the hull has been full planked it may need some more work before it is ready to be painted.

Glenn (UK)

Link to comment
Share on other sites

HULL ASSEMBLY

2ND PLANKING LEFT SIDE

BUILD MANUAL STEP 182

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Craft knife

120 & 400-grit sandpaper

Gorilli super glue gel

 

Gathering the materials required

The following kit parts are required for this section of the build:

Planking strips

 

Assembly Process

Following on from my last post I have completed  the 2nd planking to the left-hand side. Each plank was cut in two with one half used for the bow and the other half used for the stern and a joint around the midship area. This made the job so much easier.

 

I found by sanding the joint line once the plank had glued the sawdust could bind with any residual ga gel in the joint to fill gaps.

 

Occasionally I found it necessary to brush some diluted pva over the parts of the plank joint area so the gaps would get filled with the sawdust / pva mix during sanding.

 

Overall I am reasonably happy with the 2nd planking and I do not think it will require too much more work (sanding and filling) before the painting phase. The right-hand side 2nd planking task will be done next.

 

005.thumb.JPG.f13be7027754e06f9c2db0647615b7f5.JPG

 

001.thumb.JPG.14d9806e18c8a1956d62fae46a7c4cd5.JPG

 

002.thumb.JPG.d0a37e7e3d77b7874c4270e466581bfe.JPG

 

003.thumb.JPG.a0c6b4c56dacdde14e2c8a33c436c6ee.JPG

 

004.thumb.JPG.74a84fab4f6d09b6ec88535b898ae019.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

HULL ASSEMBLY

2ND PLANKING RIGHT-HAND SIDE STAGE 1

BUILD MANUAL STEP 182

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Craft knife

120 & 400-grit sandpaper

Gorilla super glue gel

 

Gathering the materials required

The following kit parts are required for this section of the build:

Planking strips

 

Assembly Process

I have made slow and steady progress with the 2nd planking on the right-hand side, my time in the shipyard is a bit limited at the moment.

 

I have completed the 2nd planking along the bottom edge of the stern counter which I find this the hardest aspect of the planking task.

 

I am not very adept at the planking aspect, but I am reasonably happy with how the stern area has turned out.

 

001.thumb.JPG.969312736fd283779928de6c14346303.JPG

 

002.thumb.JPG.2f63c9217ddf664b1ee67054ee4633bd.JPG

 

The bow is not too bad, the bottom edge looks a bit odd in the photos below which may be a weird shadow effect. It will require a small amount of filler however in one small area.

003.thumb.JPG.325cd78de31ae90c8e2cb9363a73f590.JPG

 

004.thumb.JPG.be97a2781e4ec46047dddbf00e47ea33.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

34 minutes ago, Jasseji said:

My progress is slow as well, on Stern side i am half way down but i have 4 more planks at Stern than bow now

I hope to complete the planking in the next couple of days. We have our 10 month granddaughter (and her parents) staying with us for a few days but I'm sneaking a bit of time in the shipyard during her naps. I also having to make all the arrangements for my Mum's funeral who passed away last week after a short illness, aged 92.

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

Sorry to hear of your Mum, Glenn.   Nice work on the planking.

 

 

Mark
"The shipwright is slow, but the wood is patient." - me

Current Build:                                                                                             
Past Builds:
 La Belle Poule 1765 - French Frigate from ANCRE plans - ON HOLD           Triton Cross-Section   

 NRG Hallf Hull Planking Kit                                                                            HMS Sphinx 1775 - Vanguard Models - 1:64               

 

Non-Ship Model:                                                                                         On hold, maybe forever:           

CH-53 Sikorsky - 1:48 - Revell - Completed                                                   Licorne - 1755 from Hahn Plans (Scratch) Version 2.0 (Abandoned)         

         

                                                                                                                                                                                                                                                                                                

Link to comment
Share on other sites

10 hours ago, glennard2523 said:

I hope to complete the planking in the next couple of days. We have our 10 month granddaughter (and her parents) staying with us for a few days but I'm sneaking a bit of time in the shipyard during her naps. I also having to make all the arrangements for my Mum's funeral who passed away last week after a short illness, aged 92.

Sorry to hear that

Jacek

 

Current Build: HMS Sphinx 1775 - Vanguard Models 1/64 

On Hold/Parallel: Lady Nelson - Amati/Victory Models 1/64

 

 

Link to comment
Share on other sites

HULL ASSEMBLY

2ND PLANKING RIGHT-HAND SIDE COMPLETED

BUILD MANUAL STEP 182 - 186

 

 

LINK TO MY BUILD LOG INDEX

 

Tools Used

Craft knife

120 & 400-grit sandpaper

Gorilli super glue gel

Waterline marker

Tape

 

Gathering the materials required

The following kit parts are required for this section of the build:

Planking strips

 

Assembly Process

I have finally completed the 2nd planking stage. I am not very adept at planking but each new model I have planked is better than the previous model. I would love to be able to buy a kit that allows me to just practice the fairing and planking process.

 

 I have also trimmed the jig supports, as these are now longer required.

 

With reference to the plan sheet provided I marked and taped the water line. I started the process by taping both the stem and stern posts areas, using the reference points provided on the laser engravings as a guide. Then using my waterline marker I drew the line between the two taped points. I then added tape so I can sand and fill the area below taped waterline.

 

 

001.thumb.JPG.f32e8777b8ff6ea819658ab6f899c1ea.JPG

 

002.thumb.JPG.a1d21486c407c48676ba0b97ba998c03.JPG

 

003.thumb.JPG.646255920281b7e6dd856b8aaade5ffb.JPG

 

 

The Sphinx is now taped and ready for the sanding and filling phase.

 

004.thumb.JPG.556fd9c2c66569ffd057fc71e0617185.JPG

 

005.thumb.JPG.e98cebc02a34088c6df211c05986a612.JPG

Edited by glennard2523

Glenn (UK)

Link to comment
Share on other sites

1 hour ago, glennard2523 said:

 

 

Assembly Process

I have finally completed the 2nd planking stage. I am not very adept at planking but each new model I have planked is better than the previous model. I would love to be able to but a kit that allows me to just practice the fairing and planking process.

 

 

Looking good. You're making quick progress.

 

Have you seen the NRG half hull planking project. looks like exactly what your looking for to practise fairing and planking. Its in the NRG online shop at top of page although shipping to us in UK may make it expensive.

Matt

Current Builds

HMS Winchelsea by Mnewsholme

Duchess of Kingston by Mnewsholme Vanguard models 1:64

 

 Previous Builds

Lady Eleanor Vanguard models 1:64 completed

Link to comment
Share on other sites

1 hour ago, mnewsholme said:

Looking good. You're making quick progress.

 

Have you seen the NRG half hull planking project. looks like exactly what your looking for to practise fairing and planking. Its in the NRG online shop at top of page although shipping to us in UK may make it expensive.

It sure does, I may look at that after I have built the Sphinx

Glenn (UK)

Link to comment
Share on other sites

35 minutes ago, glennard2523 said:

Thankfully I had plenty of acetone to clean my fingers after each session

hm, luckily the Admiral has enought Nail Polish remover (and it worked for me), i am actually more concerned if i can safely remove the stains from the model (or actually paint over them as they appear mostly below the waterline on the Stem)

Jacek

 

Current Build: HMS Sphinx 1775 - Vanguard Models 1/64 

On Hold/Parallel: Lady Nelson - Amati/Victory Models 1/64

 

 

Link to comment
Share on other sites

32 minutes ago, Jasseji said:

hm, luckily the Admiral has enought Nail Polish remover (and it worked for me), i am actually more concerned if i can safely remove the stains from the model (or actually paint over them as they appear mostly below the waterline on the Stem)

Cotton buds and acetone should do the trick, that's is going to be my plan where needed.

Glenn (UK)

Link to comment
Share on other sites

A thin line applicator like I’ve shown in my log helps manage the flow and amount of CA used and keeps it off your fingers. Plus it takes very little CA to hold the plank. I run the applicator behind the plank as I press down and wind up with very little on my fingers or on on the plank. I’d be careful with acetone on the wood, you might first try gentle scraping first (one of the many uses for my dental scrapers). The Chuck method of edge bending is a big help since the plank is already formed to fit.

 

As you said though, ultimately it comes with practice.  Congratulations on finishing the planking,

 

I hope you don’t mind a little more input but I suspect you’ll have paint runs with your taping as it is. Tamiya tape will stretch and conform to curves. I use a 6mm size to run as a single strip as much as I can, overlaying only where there is a straight line. Then a put 10mm tape above that less concerned with the line just to prevent paint going where I don’t want it, the 6mm tape curves more easily. Every overlay, especially short pieces, is an opportunity for a paint leak, paint build up, or a less than smooth line.  Just a thought having recently painted Flirt’s hull. 

Edited by glbarlow

Regards,

Glenn

 

Current Build: Don't know yet.
Completed Builds: HMS Winchelsea HM Flirt (paused) HM Cutter CheerfulLady NelsonAmati HMS Vanguard,  
HMS Pegasus, Fair American, HM Granado, HM Pickle, AVS, Pride of Baltimore, Bluenose

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...