  1. First the good news.

     

    I'm slowly learning how to easily make and notch the beams.

    Fitting is slow work. I use a crude sliding stick to measure the distance then cut the stock slightly over size and trim it to fit.

    I could measure off my framing plans... make a mental note to compare the measurements of the next beam I make... nope, better write that down.

    The bow has quite the curvature to it in both axis so that takes some concentration to shape the ends of the beam to rest or nest in place properly.

    I mark the depth of the crutch cut on two faces and was originally sawing multiple notches prior to chiselling out to the mark but I find just notching the extreme ends is enough. I saw just inside the pencil line. The sawing keeps the ends from chipping. Then I fit the crutch stock into the notch and open it a bit as required.

    1-notching.jpg.532d562fe27d01cf317a0129f8a34089.jpg

    So I've progressed to my first two beams having the crutches installed and all glued in place.

    The third beam, the one with the arms, is notched and ready to install and the fourth beam is marked and ready to notch.

    I mark the crutch notch locations off the plan I made for the gun deck. The contract stated the orlop deck beams are laid out like the gun deck above it. This is important to understand as I am about to mention the bad news. First I use my plumb to locate the centre of the beam. I have a string stretched from stem to stern on centre. My plumb is suspended from my height gauge beam and I inch it over, string beside string. The nib or point of the plumb is now just off one side of centre on the beam so I pencil mark the actual centre of the beam to one side of the plumb pointer. Then I place the beam, located with the centre mark, over my 1:64 scale paper plan for the gun deck and mark the notch locations. Easy enough.

    When I stopped late yesterday I left myself a note to work on the standard knees for the first few beams. Standard knees run vertically upwards above the beam. I have to check if they start actually on top of the beam or along side of the beam... make a mental note... nope, I'd best write that down too.

    This morning I awoke with a premonition I'd done something wrong.

    Double check and the plans show quite clearly that the orlop deck beams have none with arms like the gun deck above has.

    So the bad news is I made a beam with arms that is now scrap. The good news is I didn't glue it in place and I now know I can do it. Yeah me!

    2-beams.jpg.a4d07102957c701a4a6b80571f014d40.jpg

     

     

     

  2. If they are ball bearings they are not designed for a side force. As the spindle is vertical I'd suspect they are tapered roller bearings that will take side loading by design so light taps with a soft hammer/mallet should dislodge it.

    If not tapered roller bearings then the machine is a poor design mechanically speaking.

     

    If you use the long threaded bolt you might damage the threads. The rod should be a larger diameter so as not to engage or contact the threads at all.

  3. I do not have this machine but, having said that, there should always be an access hole on the far side to knock it out with a rod if/when it sticks.

    If you cannot see it, there must be a cover over it. It should be a tapered hole.

    Can you remove a cover?

    Put a towel or something below to catch it as it drops out.

    Good luck

  4. Thank you TBlack for that vote of confidence.

     

    Here is a photo of the beginning of the orlop beam fitting. It may be slow going for awhile - until I gain some confidence in myself.

    I hope what I learn here will help with the gundeck beams.

    The orlop beam layout is described as similar to the gundeck beams above it but smaller in size.

    25 - Orlop beams.jpg

  5. On 1/28/2024 at 6:06 AM, AON said:

    Regarding the 22 orlop beams and the original contract.

    They are the only beams that do not mention a rounded or rise dimension per the contract page 7.

    [**correction: page 1 states it is rounded 2-1/2" which is a mere 1/32" at 1:64 scale]

    I corrected  my post #1625.

     

    Started on the orlop deck yesterday

    As the rise or rounding is quite minimal and this deck is below  two others, I will treat it as flat, to make it easier for me.

    I am happy I decided to do this deck as being a novice I am finding it quite the challenge.

    Two beams fitted near the bow and the first tries of each are in the scrap bin. (Actually they are put aside to resize for the ledges and such)

    I hope to get better at this soon.

    I'll post photos when there is something I'm proud of.

  6. No sir. Your message was quite clear to everyone but me. You even had the correct emoji!

    There is only one whale appendage here... oh wait... you meant silly person.  🤣

    That good sir would be me!

     

     

    Regarding the 22 orlop beams and the original contract.

    They are the only beams that do not mention a rounded or rise dimension per the contract page 7.

    [**correction: page 1 states it is rounded 2-1/2" which is a mere 1/32" at 1:64 scale]

    I suppose due to being below the waterline there is nowhere to run off to but down to the bilge.

    These beams range in size from 15-1/4" to 12" square. (0.238" to 0.188"  or 6 mm to 4.8 mm)

    I've cut up stock at 0.235" square and will use that throughout the orlop deck to simplify something that will barely be seen.

  7. Made and installed the main and mizzen mast steps. I simplified them as they won't be seen.

    24-3masts.jpg.3391e1d3c64dc7662ca6fe9c3c37ca3b.jpg

    One thing was desperately needed to be added... a coin for good luck.

    I have an 1896 Queen Victoria 5 cent Canadian silver coin. About 15.35 mm diameter.  It is quite battered up and worth about $12 max. on a good day.

    19-cointailside.jpg.3253a0e7a0bf1ba6845a80d7f516f17a.jpg20-coinheadside.jpg.802bda97bfad0e6f05fe1fa9102a0cfb.jpg

    I drilled out the bottom of the main mast step with a 5/8 spade bit, inserted the coin face up, and installed it in place permanently.

    18-coinpocket.jpg.e721a626c194037c066d0f3f3b861394.jpg21-coinfitted.jpg.b5d729f03cb09462b2af43bcc87fb4c8.jpg22-Mainstepandcoininstalled.jpg.77a81c40830cc37ef55d6a5d0e5ede12.jpg

    Am I ready to start the deck beams?

    I think so.

    Have to remove the masts first and put them back in storage.

     

     

  8. Completed the three sets of fixed blocks... but after having reminding myself not to get cocky and triple check what I'm doing I ended up drilling the last two backwards.

    The sheave was tilted the wrong way. I had one glued in and was starting to carve the last when I realised the error.  I quickly removed it and cleaned up the hull.

    Had to cut two new pieces and carefully mark them before drilling.

     

     

    13 - carved sheave.jpg

    13 - fixed blocks.jpg

  9. Thank you Håkan

    If that minor chipping was a problem for me I actually would have thrown out the whole model a long time ago.

    There are many mistakes made and corrected along the way that only I or a close up with a camera can see.

    These are all my honourary awards for not having given up.

     

    I actually put a dab of white glue in those chip spots and rubbed some sawdust into it, let it dry a bit and passed sand paper over it lightly to hid it a bit.

    If a plank is placed over it it would never be seen again.

     

  10. Managed a couple hours in the shop this afternoon.

     

    First was cutting out the sheave block holes through the hull.  I managed only two of three that pass through the starboard side of the hull.

    I cut out between the holes using an small X-acto saw blade as it would fit in the hole.

    Then I opened the rectangular hole with small files, checking for fit regularly. There was some chipping.

    8-fixedblockholeinhull.jpg.e0607aff582eba7a07636c81aed583d2.jpg

    Once the block fit I ran a pencil mark around the block next to the hull then I sanded the inboard and outboard end of the block to be 1/16" proud of the mark.

    The pencil mark was slightly clear of the frame so the "extensions" out and inside of the frame was slightly more than 1/16" which is 4" at scale.

    9-fixblockdryfitted.jpg.0d6bb89b5d99b709947b3629bb73e9b0.jpg10-inboardview.jpg.9ffbf3bee1249fb0713479ef0bd3e45f.jpg

    I then clamped the block in my table vise. Drew a straight set of pencil lines above and below the sheave holes at the hole extreme diameter as a guide.

    Using a scalpel I scored along the lines in an effort to avoid chipping the surface of the wood when chiselling.

    Then I micro chiselled out the sheave opening between the holes, shaped the sheave and chiselled the rope groove into the sheave.

    Then turned it around and did the other side.

    11-chiselsheave.jpg.9d1fb31ee39e483f46415f2e5f333ecd.jpg

    All pencil marks on the block and hull were erased, followed by light sanding.

    The blocks were then glued into the frame holes permanently.

    12-glued.jpg.6c6f560a1117ee7e4f932280ee49d74e.jpg

    I have the two fixed blocks on the port side to do next and then there is one last set that passes through the frames forward of these.

    They are ever so slightly larger at 13" (0.20") versus 10" (0.16").

    Not necessarily very noticeable at this scale but I'll do my best.

     

  11. I just read an extremely well written article about shop wood dust and its effects by Seri Robinson, an associate professor of wood anatomy at Oregon State University, and just had to share it.

     

    https://www.oneida-air.com/blog/dust-collection-in-a-shared-shop-a-wood-scientists-perspective

     

    My father-in-law work with wood all his life, started in the back woods logging camps of New Brunswick chopping and sawing trees, dragging them down to the rivers edge with horse drawn sleds, then dancing on the logs as the drifted down the river to the mill, to ending his career in the local lumber yard making roof trusses and cutting pressure treated lumber for customers. In all that time he never wore any filtered mask... they weren't a consideration for his job until the year after he retired, the year he health declined and he became dependant on supplementary oxygen 24/7. Dust in his lungs.

     

    I've been wearing a proper shop filtered dust mask for years, added dedicated dust collection system to my workstations, and added a micro dust filter unit in my shop.... and there is still dust accumulating down there.

     

    Please read the article and consider your health.

  12. I managed to spend about 90 minutes in the shop today and likely won't get back until Monday afternoon.

     

    I prepared some larger stock material and laid out four fixed blocks for drilling and cutting leaving extra material on the inboard and outboard hull frame sides as mentioned was necessary in an earlier post.

    3-layingoutblocks.jpg.f45ac154ffc5e621f31d9260f151d0bb.jpg

    This was mounted in my vise and magnetic clamped to my drill press table.

    4a-clamping.jpg.c15140e42ed99690a5fddeced6cfb938.jpg

    Using a #60 drill bit (about 2-1/2" diameter at scale) I drilled the holes through for the sheave pockets.

    4b-drilledholes.jpg.b80d33d65f555f9b85c2ceb4c237e740.jpg

    I then cut the notches for the ears and cut the four blocks free of the stock.

    You can clearly see the size difference with the one photo where I placed the trainer block on top of these.

    5-cutout.jpg.8960ec663f19f0cfdbe4ae380f6be18d.jpg6-largeblock.jpg.5c13d761462d84a9e4a058f074237167.jpg

    Then came the very scary part.

    I had laid out the fixed block locations on the hull a few days ago, double checked them yesterday, triple checked them today.

    Using a drill bit about 2/3rds the diameter of the pocket width I carefully drilled a dimple and slowly drilled the hole, then repeated two times for three holes in each of the four pockets.

    I had discovered that when using my cordless drill and resting the edge of the battery at its foot against the table top the bit was perfectly level with the table top.

    I needed to only watch that the bit was parallel to the frame.

    7-drillingouttimbers.jpg.3a80fde7fafa581e6672286e9778a8ea.jpg

    Next I will hollow out the pockets and size them to fit snugly with the fixed blocks.

    While the blocks are inserted I will mark them proud of 4" inboard and outboard of the timber (1/16" at scale).

    The blocks will be sanded back to that shape and then the sheaves will be carved into them.

    laurelhardydancing.gif.3d641517d1e246663f4f3d77e9258e58.gif

    I have a plan.... wish me luck!

     

×
×